O&S COST MANAGEMENT: O&S COST INFLUENCE ON PROGRAMS

Slides:



Advertisements
Similar presentations
1 Air Force Materiel Command I n t e g r i t y - S e r v i c e - E x c e l l e n c e Developing, Fielding, and Sustaining America’s Aerospace Force OC-ALC/MAN.
Advertisements

DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
JHP Case Study Introduction 1 UNCLASSIFIED notional data for notional program.
1 PBL Panel Discussion F-22 System Program Office F-22 System Program Office F-22 System Program Director 13 January 2015.
Birthplace, Home & Future of Aerospace 2014 SECDEF Subsystem PBL of the Year – Sniper Precision Attack Pod 1 DISTRIBUTION STATEMENT A. Approved for public.
DoD Systems and Software Engineering A Strategy for Enhanced Systems Engineering Kristen Baldwin Acting Director, Systems and Software Engineering Office.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Aeronautical Systems Center USAF Alternative Fuels Certification Program 1 AFPEO/Agile Combat Support.
UNCLASSIFIED Joint and Coalition Warfighting Mr. John Vinett March 2012 Technical Baseline Capability.
Logistics Workforce Categories  Ms. Vicki L. Harris  DRC Contractor  Force Management and Organization Division  (A4RF)
New 5000 Documents 14 May 2001 New 5000 Documents 14 May 2001 Defense Systems Management College Acquisition Policy Department.
1 [insert briefing type here] [insert program name here] for [insert name and organization of person(s) to be briefed here] [insert “month day, year” of.
Escape Systems Mar 01 AIRCREW SYSTEMS ILSMT BRIEFING NACES ADVANCED ELECTRONIC SEQUENCER PROGRAM FUTURE ADVANCED SEQUENCER TECHNOLOGY (FAST)
1 PMA-273 T45 Contractor Logistics Support April 2004.
Planned ACQ101ACQ201 LOG101LOG201LOG304 On-line HybridClassroom Level I Level IILevel III LOG235 Acquisition Logistics Education Scheme.
Doing Business with the Naval Air Systems Command Presented to: SMART PROC 2015 Presented by: Ken Carkhuff Deputy Associate Director NAVAIR Office of Small.
Keeping America’s Navy #1 in the World 2005 DoD Standardization Conference Maritime HM&E Standardization 8-10 March 2005 Mr. John Goodhart, NAVSEA 04L.
LOG235/236 Performance Based Logistics Bruce Hatlem Logistics Functional IPT September 2007.
Stracener_EMIS 7305/5305_Spr08_ Systems Availability Modeling & Analysis Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7305/5305.
GORT Planning/Guidance Session with LTG Barclay
Business, Cost Estimating & Financial Management Considerations
PRODUCTION/ DEPLOYMENT
Performance Based Logistics
Integration of DTM “Reliability Planning, Analysis, Tracking and Reporting” into LOG 103 and other DAU Life Cycle Logistics Learning Assets.
DoD Template for Application of TLCSM and PBL
ITIL: Service Transition
T45 Contractor Logistics Support
UNIQUELY FOCUSED IN A CRITICAL DISCIPLINE
Life Cycle Logistics.
DT&E Strategy and the Developmental Evaluation Framework (DEF) Concept & Program Implementation 5 June 2014.
MNS - Mission need statement
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
CAD/PAD Life Cycle Sustainment Plan (LCSP) 2017 CAD/PAD International Logistics meeting Lee Manis USN/USMC CAD/PAD APML 23 May 2017.
ISA 201 Intermediate Information Systems Acquisition
Performance-Based Logistics
Approved for public release; NG , 5/26/15
PSM Lessons Learned Background
ME Spring 2015 Systems Engineering, Part II
Milestone A to Milestone B Requirements Management Activities
ISA 201 Intermediate Information Systems Acquisition
Cumulative IOT&E Results Through FY 2008
Product Support Strategy Demonstrated Performance
ISA 201 Intermediate Information Systems Acquisition
Life Cycle Logistics DAWIA Certification Requirements (FY18)
ISA 201 Intermediate Information Systems Acquisition
JTAMS PRE-MILESTONE B ANALYSIS
Materiel Development Decision (MDD) to Milestone A (MS A)
Foreign Military Sales (FMS)
GSSLLC (C) ALL RIGHTS RESERVED
Sustainment Reporting CADE Sustainment Reporting
Project Plan Template (Help text appears in cursive on slides and in the notes field)
Product Support Considerations
SmartMeterTM Steering Committee Update – September 2012
Image Sources: Runway picture ( Flight ( Meghan Wright Charleston, SC

Life Cycle Logistics Perspective KC-46 Product Support
DoD Supply Discrepancy Reports Transformation Initiative

Exit Capacity Substitution and Revision
SmartMeterTM Steering Committee Update – February 2013
Transmission Planning Code Review
Minor Release Drop 3 Timeline
Product Support Strategy Demonstrated Performance

Technology Evaluation (RATE)
The MDAP Process MDAP Process Price Fighters Services Concept Refinement System Development & Demonstration Production & Deployment Operations.
The Department of Defense Acquisition Process
Director, Tactical Innovation Implementation Lab (TIIL)

Executive Project Kickoff
*Separate register for CTF at:
Presentation transcript:

O&S COST MANAGEMENT: O&S COST INFLUENCE ON PROGRAMS A V-22 PROGRAM PERSPECTIVE V-22 Readiness Improvements / Cost Per Flight Hour Reductions N4 Brief 5 January 2011 Mr. Scott Hite, V-22 Joint Program Office (JPO) Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 2018-313 1

Background & Context ►Discrete O&S Influence in Design Has projected O&S cost influenced DoD acquisition program product design decisions? · Has projected O&S cost influenced DoD acquisition program product support strategy decisions? · Has actual O&S cost influenced DoD fielded program cost reduction decisions? Dec 1981 MS 0 Dec 1982 MS I Apr 1986 MS II Oct 1992 EMD contract award Jan 2018 CCRAM contract Defin Oct 2005 MSIII Apr 2000 Marana Mishap Jun 2007 MV IOC Mar 2009 CV IOC Apr 2010 GSD Jun 1996 LRIP 1 MYP I FY2008-12 MYP 2 FY20013-17 MYP 3 FY20018-22 Performance Based Logistics (PBL) contract FY2008 Reliability changes Cost Reduction Initiatives FSD contract terminated May 2015 Hawaii Mishap ►Discrete O&S Influence in Design ►Acquisition Environment and where was the focus ►Results Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 2018-313

V-22 O&S Requirements Development Key Performance Parameters Reliability MFHBF (Mean Flight Hours Between Failures) Reliability MFHBA (Mean Flight Hours Between Aborts) Contract Requirements Design To Cost Design for Maintainability Technical review process Migrating over time to include logistics support elements Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 2018-313

Events Diverting Program Attention from O&S Focus Near term focus always seems to out-weigh the long view Political sensitivities of the V-22 Program Mishaps redirect efforts Safety first Protect the program Increasing demand & changing intended use of the V-22 system Realities of the Environment “Talcum powder” like sand “Reactive sand”/Volcanic ash Maritime environment: Salt spray Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 2018-313

Events Diverting Program Attention from O&S Focus Safety Safety Transformational Technology - Speed, Range, Capacity Affordability Modernization/LCC Changes in Operations SPMATF MEUs Disaggregated Ops Expansion of intended use Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 2018-313

Absence of another tilt rotor platform for analogous comparison Information per V-22 Selected Acquisition Reports (SARs) – Dec 1997 to Dec 2017 Cost Breech factors: Absence of another tilt rotor platform for analogous comparison Higher cost of repairables than forecast Increased demand for consumables Delayed Intermediate and Depot level repair standup Inaccurate reliability predictions - underestimated complexity factors of 1st generation technology Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 2018-313

Actions Today Common Configuration - Readiness & Modernization (CC-RAM) Performance Based Logistics (PBL) Organic Capability Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 2018-313

Total Ownership Cost O&S Acquisition Program Baseline reporting formally began in 2005 (includes all V-22 variants) Change to three level maintenance concept Program originally based on two level (no I-level) Service life 10,000 hrs per airframe Antecedent programs (CH 46, MH53J/M, &C-2A) not representative of tiltrotor configuration Navy variant better defined today Constant focus to reduce in a changing fleet environment on each aspect of CPFH Maintenance planning Maintenance Capability (I & D level repair) Contracting strategies for supply R&M design improvements Consumable to repair designations Migrating repair from OEM to organic capability Resetting estimates based on actual data Etc… Dedicated Program Readiness Team Distribution Statement A – Approved for public release; distribution is unlimited, as submitted under NAVAIR Public Release Authorization 2018-313

Wrap-up Design phase has the best opportunity to affect O&S Near term challenges distract from O&S focus Political environment Operating Environment/Mishaps Concept of operations changes Unit cost affordability There are post design phases methods to influence O&S Logistics support concept R&M design changes Disciplined design change implementation – maintaining common configuration