TDI-Brooks Procedures

Slides:



Advertisements
Similar presentations
Managing the Health and Safety of Contractors
Advertisements

iStar How to Create an Amendment
Indistar® Leadership Team Meetings. Where can we plan a meeting? Choose ‘Plan Your Meeting’ from the main menu screen Click on Meeting Agenda Setup.
Job Loss Analysis Overview
Hazard Prevention Program
Improving recognition of and response tochild vulnerability – the development ofthe Greater Shepparton Vulnerability Guide Improving recognition of and.
Supplier Product & Process Change Request. Flow Diagram: Supplier Product & Process Changes Requests Change notification form completed by supplier then.
Risk Assessment – An Essential Standard
1 CHCOHS312A Follow safety procedures for direct care work.
Host Agency Safety Consultation What the law says you must do.
MODU Safety Committee Objective The objective of this Procedure is to establish the terms of reference for the Safety Committee on board the MODU.
Paul Hardiman and Rob Brown SMMT IF Planning and organising an audit.
Management of Change ► The health, safety, security, environmental, technical and other impacts of temporary and permanent changes are formally assessed,
Lifting Gear TDI-Brooks Policies & Procedures Nov 2015.
HSE Officer Nov Who is the HSE Officer? SOP-GEN-2014C The First Mate is the designated HSE Officer on TDI-Brooks vessels.
PDR 2016 A Guide for Professional Staff 1. Plan 2. Progress 3. Review.
ITIL Project Change Management Workshop 7 February 2007
LAW SOCIETY OF ZIMBABWE LABOUR LAW SEMINAR
The research ethics review process Hazel Abbott, Chair University Research Ethics Committee.
Environmental Requirements for North West Grid Floodlight Project Compiled by: Silindile Mbhele.
Modular Value Stream Safety Map (MOD VSSM)
Software Quality Control and Quality Assurance: Introduction
Business & Management Topic 1 Stakeholders.
Lock Out & Tag Out.
Supervisor observation and sign off process
Health, Safety and Environment
Personnel actions in People Admin PD module
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
Learning aim B: Explore how sub-structures are constructed
TCP LIMS – Animal Use Protocol Management
A Guide for Managers for Professional Staff
SCC P2P – Collaboration Made Easy Contract Management training
Process for reviewing Masters and UG student ethics applications
HOW TO CONSENT A PATIENT?
TCP LIMS – Facility and Safety Information
The ORR/RA Pre-Visit and Other Prior Planning Items May 2005 Revision
School Community Council Implementation Timeline Checklist
Landpower Project Zero Harm Learning Series Module:. #7a Module Title:
Presentation template
Temporary Works Co-ordination
Requirement Change Control Procedure
Standards and Certification Training
Assigning evaluators Deans (Education) appoint a pool of evaluators who are trained by the Centre for Innovation in Learning and Teaching Dean (Education)
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Engineering Processes
GRANTS – WORKPLAN AND MONITORING AND EVALUATION (M&E) INSTRUCTIONS
Communities of Practice for the eager Adoption of a Leading Practice Andre van Zyl CoM MOSH Learning Hub.
Revision 1 to Document CWG-SFP-2/7-E 12 September 2017 Original: English Process and timetable for The elaboration of the ITU STRATEGIC and financial.
SCC P2P – Collaboration Made Easy Contract Management training
Sudbury Youth Soccer Association
A Guide for Professional Staff
HOW TO CONSENT A PATIENT?
Distraction Tool.
A POCKET GUIDE TO PUBLIC SPEAKING 3rd Edition Section(s) 33 and 34
A Guide for Professional Staff
2019 Meeting 1 Northern Ontario Safety Group.
MOC/BBS/JSA/Incident Investigation /SEMS/Permit to Work Training
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
MODULE B - PROCESS SUBMODULES B1. Organizational Structure
How to conduct Effective Stage-1 Audit
Chapter # 3 The Components of SQA
IEP REPORT OF PROGRESS AND ACHIEVEMENT K-12
Sudbury Youth Soccer Association
Understanding the Process of Documenting Informed Consent
USOAP Continuous Monitoring Approach (CMA) Workshop
LAUSD INJURY AND ILLNESS PREVENTION PROGRAM FOR SUPERVISORS AND EMPLOYEES As required by California Code of Regulations, Title 8, Section 3203.
SAE Standards Works Training Module - Useful Tabs
Start JSA Team JSA Note Inspect Site Hazards Resolve JSA Sign Permit
Risk Management NDS Forum June 23rd 2010.
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

TDI-Brooks Procedures Management of Change TDI-Brooks Procedures

We have clearly established procedures for all of our major processes

Standard Operating Procedures Some procedures are detailed down to the size and type of clamps and shackles to be used.

You may NOT use unapproved gear for lifting or purchase lifting gear on your own.

The pin has been painted to indicate it has been inspected and approved for use.

Proposing a Change On rare occasions, these procedures may need to be changed to adapt to a particular situation or client requirement. This could be a temporary or permanent change Before any changes may be implemented, they must go through the Management of Change Process.

Situation: A client we are already working with insists that we use their color coding system for lifting gear because their workers are familiar with it. Management representatives and potentially affected employees from both sides must meet to evaluate this potential change to TDI procedure.

It is important that the potentially affected workers participate in the process. They are often in the best position to understand the risks to themselves and the hazards of the work site.

Team meets to discuss proposed change The team has to evaluate if changing to the new color coding system will introduce or increase risks to the workers.

Team documents the meeting All team members must sign in to Step 1: Consideration of Management of Change sign in sheet. Meeting minutes should be recorded.

Team conducts risk analysis During the meeting, the team will complete Step 2: Pre-Management of Change Risk Analysis. This step will evaluate if changing to the new color coding system will introduce or increase risks to the workers.

Team conducts risk analysis At the end of the meeting, the team indicates on the form if it decided to implement the change or not. If NO, send copies of Steps 1 and 2 to dpa@tdi-bi.com and file with bridge documents. If YES, proceed to Step 3: MOC Implementation Form

If team agrees change should be made… The next step is to complete Step 3 Management of Change Implementation Form

On Step 3 MOC Implementation form, the team completed steps 1, 2 and 3.

On Jan 1st, they completed the implementation stage and training.

Crew training was documented and new color scheme was posted.

A scan of all the forms was sent to dpa@tdi-bi.com. Senior management reviewed all forms and posted to the Crewing Module under the Risk/ JSA tab.

On June 30, 2014 the temporary change will be evaluated. If no longer needed, the return to normal operation date and close-out section will be completed.

If change is continued, a new re-evaluation date will be set. Either way, any progress or revisions need to be scanned and sent to dpa@tdi-bi.com.