Constructing the Knik Arm Bridge A Feasibility Study

Slides:



Advertisements
Similar presentations
Fern Valley Interchange Public Hearing November 3, 2010.
Advertisements

New I-65 Interchange at Worthsville Road Welcome!.
Route 17 Corridor Study Public Workshop II – November 29, 2012 Orange / Sullivan County 1.
VRE Gainesville-Haymarket Extension Feasibility Study and Alternatives Analysis Public Workshop Wednesday, October 22 nd, :30 – 9:00 pm Battlefield.
Lec 20, Ch.11: Transportation Planning Process (objectives)
© 2003 TranSystems Corporation Advisory Committee Meeting January 19, 2010.
Healthier School Lunch Menus: A Feasibility Study ENGL 212: Technical Writing Beaut Homsanit.
Program Update Baltimore MPO November 25, Internal Draft AGENDA  Program Overview  Alternatives Development  Stakeholder and Public Outreach.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Barrington Road at Jane Addams Memorial Tollway (Interstate 90) Interchange Improvement Study Hoffman Estates Village Hall June 27, 2012.
Oversight Team Meeting December 11, INTRODUCTIONS (15 MINUTES) Name and affiliation Purpose of meeting/ review agenda Edits to September’s Oversight.
West Northern Lights Boulevard – Sound Barrier Improvements August 16, 2006 Meeting Purpose: A Forum to Share and Gather Information The Municipality of.
TRACECA PROJECT EVALUATION
English 212: Technical Writing Sarah A. Bujno. Overview Introduction Criteria Methods Research Results Conclusions Recommendations.
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
OPEN HOUSE #4 JUNE AGENDA OPEN HOUSE 6:00 PM  Review materials  Ask questions  Provide feedback  Sign up for list  Fill out comment.
GROCERY DELIVERY: A FEASIBILITY STUDY ENGLISH 212: TECHNICAL WRITING BEAU BIVINS.
Metro South Planning MetroLink in South St. Louis County Metro South MetroLink Extension Alternatives Analysis and Draft Environmental.
Introduction The Austin metro area is one of the fastest growing in the country – State Highway 130; easing the pressure – Study of Sections 5-6 How GTG.
Introduction Session 01 Matakuliah: S0753 – Teknik Jalan Raya Tahun: 2009.
TRACECA PROJECT EVALUATION. Construction of Unguri-Bronitsa border crossing point and access roads from Ukraine and Moldova.
Reducing and Eliminating the use of Plastic Bags at the University of Alaska Anchorage: A Feasibility Report By: Gabriel Esposito and Raine Becker.
Rebecca Long November 9, Why is MTC interested in parking policies? 1.Land Use Impacts 2.Transportation Impacts 3.Other Regional Impacts.
Making Kenai River Chinook Salmon Catch & Release: A Feasibility Study English 212: Technical Writing Matthew Sansone.
English 212: Technical Writing Paul Song. o Introduction o Criteria o Methods o Research and Results o Conclusions o Recommendations.
Study Advisory Meeting June 11, Study Advisory Meeting June 11, 2008 Project Development Process Planning Study (Recommendations) Environmental.
Funding More Housing First Facilities in Anchorage: A Feasibility Study English 212: Technical Writing Katie Erickson & Jill Robinson.
English 212: Technical Writing Zach Erickson. Introduction Criteria Questions Methods Results Conclusions Recommendations.
Bridge Expansion Feasibility Group. Purpose Our group is an independent coalition striving to provide objective information on the expansion of the Ambassador.
{ Feasibility of Administering Hand Sanitizer Dispensers On Campus: A Feasibility Report English 212: Technical Writing Do Shin Kim.
Project Briefing for BROOKS BRIDGE REPLACEMENT STUDY and SANTA ROSA SOUND ALTERNATE CROSSING STUDY April 2015 SPEAKER: BOB.
INTEGRATING ASSESSMENT OF THE ECONOMIC BENEFITS OF TRANSPORTATION IMPROVEMENTS IN PROJECT-LEVEL ALTERNATIVES ANALYSIS Meiwu An, Pikes Peak Area Council.
Starting a Professional Swim Team at the University of Alaska Anchorage: A Feasibility Study ENGL 212: Technical Writing Hayley Holt.
cartoons The Impact of Traffic on Urban Areas »Why has traffic in urban areas increased? »What are the damaging effects of increased traffic in urban.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 002 G4 Design.
Feasibility of a LNG Pipeline in Alaska ENGL 212: Technical Writing William Columbus.
Texas Department of Transportation Corpus Christi District U.S. 181 Harbor Bridge Project Environmental Documentation and Schematic Development Citizens.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
RAIL BALTICA RIGA STATION – ASPIRATION FOR THE FUTURE
City of New Braunfels Regional Transportation Planning Garry Ford, P.E., PTOE City Engineer June 13, 2017.
View display boards and speak one-on-one with staff
Replacement of Vehicle Bridge over Spring Creek
A Bi-State Project: Lessons Learned
S.R. 30A / U.S. 98 / Panama City Beach Parkway
Jamestown 2007 Anniversary Celebration
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
ANALYSIS OF DURABILITY AND RETRO-REFLECTION OF ROAD MARKING
Finance Committee & City Council August 8, 2016
Technical and Public Advisory Committee Meeting #3
Transportation Engineering
Grey County Transportation Master Plan
Report Writing.
Lowering Cost of Fuels in Alaska: A Feasibility Study
Building a Turnagain Arm Bridge: A Feasibility Study
EXTERNALITIES AND MARKET INEFFICIENCY
Lower Makefield Township Community Meeting
Chapter 5. The Transportation-Planning Process
Feasibility Research Reports
Replacement of Vehicle Bridge over Spring Creek
Southern Bridge Project Brown County Executive
Mountain Rd to Boylston Hwy.
A120 EconomicForum Consultation 27 September 2016.
Distance Comparison from Residential Areas to 6 Employment Areas
MSP Regional Travel Behavior Inventory Program
3 November 2017 Fraserburgh and Peterhead to Aberdeen Strategic Transport Study: STAG Part 1 Plus Bob Nicol: Project Director David Murtagh: Project Manager.
Replacement of Vehicle Bridge over Spring Creek
I Street Bridge Replacement Project
Passenger Transport Forum
Public Workshop September 26, 2019.
Presentation transcript:

Constructing the Knik Arm Bridge A Feasibility Study ENGL 212 Technical Writing John Fuller

Overview Introduction Criteria Methods Research Results Conclusion Recommendations

Introduction The purpose of the study was to determine if building the bridge would be economically feasible, if it could be built with minimal environmental impact, if the bridge would relieve the traffic flow along the Glenn Highway, and would people use the bridge to commute back and forth. More than 10,000 residents of the Matanuska Valley commute into Anchorage by driving the Glenn Highway Glenn Highway is the only route recorded nearly 2,000 vehicle accidents between Boniface Parkway and the Knik River.

Criteria Is it possible to build the bridge with minimum environmental impact? Is it economically affordable to build the bridge? Will the bridge relieve traffic flow along the Glenn Highway? Will commuters use the bridge to commute back and forth from Anchorage to the Matanuska Valley?

Methods number of people that commute back in forth using the Glenn Highway current population for the Matanuska Valley area according to the 2010 census. information documenting the amount of accidents along the Glenn Highway Municipality of Anchorage website and found the 2035 Metropolitan Transportation Plan for the city of Anchorage online questionnaire to be taken by students in the English 212 class. research using the UAA/APU Consortium Library main website journal articles and government documents

Primary Research

Primary Research

Primary Research

Conclusion The construction of the bridge is economically feasible. The bridge can be constructed with minimal impact to the environment. The bridge would relieve traffic off of the Glenn Highway provide an alternative route to and from Anchorage from the Matanuska-Susitna Valley. People would us the bridge

Recommendations More research More public outreach Find an alternative funding Start the construction of bridge