ELECTRONIC DESIGN CHANGE PROCESS

Slides:



Advertisements
Similar presentations
Mentoring New Educators
Advertisements

SiteManager Materials Division Auditor Meeting January 26, 2007.
Upgrading from Calibration Manager to Blue Mountain RAM
Sunday Business Systems Asset Tracking Database Control Calibrated Equipment Manage Preventive Maintenance Maintenance Tracking.
Planning for Enterprise Systems
Configuration Management Benchmarking Group Seattle, June 2014 Configuration Backlog Reduction – There and Back Again Susan Atkin, Wolf Creek N.O.C.
Dr. L. K. Gaafar The American University in Cairo
1 Samples The following slides are provided as samples and references for the Quarterly Reviews Additional slides will be added.
Process Engineer’s Role in Project Management Dr Abdullah Malik.
N A managed approach to planning and controlling the implementation of complex application software. n A flexible tool kit, designed to support the Project.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
MSS Technologies and the AIIM Grand Canyon Chapter present: Electronic Document Management System Needs Analysis.
1 CMBG 2009 PSEG Nuclear Vendor Technical Document Program Deficiencies, Successes, and Cost Savings Presented By: Paul Davis PSEG Nuclear, Engineering.
1 Permits, Licenses and Inspections Regional Project Introductions: Home Builders & Remodelers Association of Cape Cod State Project Sponsor & Technical.
IB Computer Science Section 1: Systems life cycle and software development.
K-12 Web Content Development Process
Q1 Q2 Q3 Q4 Q5 Q1 Q2 Q3 Q4 Q5 Q1 Q2 Q3 Q4 Q5 Q1 Q2 Q3 Q4 Q5 Planning & Education Workflow Analysis & Redesign Configuration, Testing & Training Go Live.
Document Management System for Construction Industry From Crystal Infosystems & Services.
Document Management System for Construction Industry From Infocrew Solutions Pvt Ltd.
L3: GP METHODOLOGY / 1 Asian Productivity Organization, Tokyo Overview and Methodological Framework of GP Methodology Guiding Principles of GP GP Methodology.
NC Teacher Evaluation Process
John Maciejewski INPO I am John Maciejewski
© 2012 Adobe Systems Incorporated. All Rights Reserved. Copyright 2012 Adobe Systems Incorporated. All rights reserved. ® DESIGN PROJECT PRODUCTION PHASES.
Josh Olson Southern Nuclear - Vogtle 3&4
Information Technology Update ERCOT Board of Director’s Meeting October 18, 2005.
Nuclear Power Plants. Salem/Hope Creek Oyster Creek.
Topic 6 Managing stage boundaries
Physicians, secondary providers, health care professionals and their staff use the P-Scribe Viewer to retrieve, view, edit, export, print or interface.
Final Implementation of a High Performance Computing Cluster at Florida Tech P. FORD, X. FAVE, K. GNANVO, R. HOCH, M. HOHLMANN, D. MITRA Physics and Space.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
0 Design Change Construction & Completion Management (Outline and related procedures) Hanul NPP Engineering Center.
Standard Design Process Overview
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Introduction to CMIS, an Electronic Design Change Process Presented by: Mark Gillis (FirstEnergy) and Brad Diggans (Rolls-Royce)
SNC Severe Accident Management NEI Workshop 4/5/12 David Gambrell – Director, Severe Accident Management
04/16/ Planning New Generation APPA Operations & Engineering Conference April 10, 2006 Jay Hudson, PE Manager, Environmental Management.
HCS 320 Week 3 Learning Team Health Care Process To purchase this material click below link 320/HCS-320-Week-3-Learning-Team-Health-
CM-101 Configuration Management Fundamentals
What every benchmarking coordinator needs to know
DNP Initiative ENG-003 Standard Design Process Overview Configuration Management Benchmarking Group June 12, 2017.
NEI Configuration Control Benchmarking – Sequoyah
CSC Expense Concur Application User Guide Netherlands March 2013
ProposalBuilder Jeff Buennemeyer Area Vice President 27 January 2016.
ITCRB FY18 Funding Cycle Kickoff
DESIGN BASIS INTEGRATION
Presented By: John Gierlach, Senior Advisor Ontario Power Generation
NEI Configuration Control Benchmark – Palo Verde
The ORR/RA Pre-Visit and Other Prior Planning Items May 2005 Revision
Overview of Asset Strategy and Maintenance Plan Development
Configuration Management Benchmarking Group (www. cmbg
KC IRB Implementation – Phase IV
DESIGN PROJECT PRODUCTION PHASES DEFINE, STRUCTURE, DESIGN, BUILD AND TEST, DELIVERY ® Copyright 2012 Adobe Systems Incorporated. All rights reserved.
Plant Vogtle Units 3 and 4 Alex Thirkell.
Increased Efficiency and Effectiveness
Considerations for the Paperless Laboratory
07 Master Data – Tools
Configuration Control and the Standard Nuclear Performance Model
Electronic CM Processes
How to Manage Guidance from Multiple Organizations into CM
DESIGN PROJECT PRODUCTION PHASES DEFINE, STRUCTURE, DESIGN, BUILD AND TEST, DELIVERY ® Copyright 2012 Adobe Systems Incorporated. All rights reserved.
Adding Nuclear Power to the Grid
Standard Design Process (SDP) Software Tom Czerniewski Entergy Nuclear
1 Stadium Company Network. The Stadium Company Project Is a sports facility management company that manages a stadium. Stadium Company needs to upgrade.
FSAR Configuration Control at PPL Susquehanna, LLC.
Tucson Unified School District
Final Design Authorization
Chapter 3: Project Integration Management
SLO Assessment and Program Review
New Plant Configuration Management Development and Implementation Process John Maciejewski INPO June 29, 2009 EN MRM Standardization Model.
Productivity Loop PowerWriter A systematic approach to world-class
Presentation transcript:

ELECTRONIC DESIGN CHANGE PROCESS Presented By: Robert Beard Configuration Supervisor PSEG Nuclear, LLC 8th Configuration Management Benchmarking Conference October 29 – 31, 2001 Raleigh, NC

Salem / Hope Creek

PSEG Nuclear, LLC 3 unit site located in southern New Jersey along the Delaware River. Salem- (2) 1140 Mw Westinghouse 4 loop PWR units Hope Creek- one 1031 Mw General Electric BWR

PSEG Nuclear DCP Process Redesign Goals Outcomes Tools

Redesign Process Dedicated team of 12 people full time for 8 weeks Focused on Design Change Control process and Organization design Overall objective was to Streamline the process reducing signatures, handoffs, cycle time and maximize the use of SAP & DCRMS.

Electronic Design Change Process The following were utilized in designing the new process INPO AP 929 Configuration Control NEI Standard Nuclear Performance Model EPRI TR-103586-Revision 1 Optimizing the Design Change Process

Electronic Design Change Process Outcomes Redesigned process is totally paperless All reviews & approvals are done electronically Affected documents are marked up electronically using our document imaging system (CIMAGE) Final product is exported from the network drive as a TIF image directly into our Document Management system after final approval

Electronic Design Change Process Outcomes SAP All work activities associated with a DCP are created in SAP as operations. All reviews, approvals and checklists are electronic in SAP Man-hours are estimated in SAP and scheduled Provides the transactional record of all reviews and approvals electronically.

Electronic Design Change Outcomes SAP Installation & Test instructions prepared on a sub-order to the NUCP Installing work order NUCM is a sub-order to the Installation & Test order Field Changes are processed electronically & immediately updated in DCRMS Close out is electronic

SAP Order Hierarchy

SAP DCP Order Header

SAP DCP Order Operations

SAP DCP Order IDV Checklist

SAP ITP Order Header

SAP ITP Order Operations

SAP ITP Order Implementation outline

SAP NUCM Order Header

Electronic Design Change Process Tools DCRMS All images of DCP are in DCRMS All records associated with DCP are linked in DCRMS All SAP order information is electronically stored on an optical disc as part of the DCP record. All Pending and Outstanding changes are available from any Desk Top computer.

ELECTRONIC MARK UP

PSEG Nuclear Electronic DCP Process Summary All Electronic Preparation Installation Field Changes closeout SAP controls work activities DCP ITP Work order DCRMS is document management tool

PSEG Nuclear Salem Reactor Vessel Hope Creek Spent Fuel Pool