+ many slides from various colleagues (KH, Rudiger, Paul, …)

Slides:



Advertisements
Similar presentations
LHC Machine Protection
Advertisements

Frédérick BORDRY – LHCMAC 22- 6th December 2007 Review of the experience of LHC powering: short-circuit tests and sector 7-8 and start of powering sector.
1 Powering Tests and Safety Electrical Safety Hugues Thiesen Power Converter Group.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
LARP Collaboration April 26 th 2006 The Commissioning of the Technical Systems of LHC 1.The final validation that all the collider components/systems.
David Nisbet – LIUWG 17 th July 2008 LIUWG – Options for Powering Phase I David Nisbet Summary of points from LIUWG 7 Existing topology Future topology.
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
CERN Rüdiger Schmidt FCC week 2015 Long Magnet Stringpage 1 Incident September 19 th Architecture of powering and protection systems for high field.
Interlock and Protection Systems for SC Accelerators: Machine Protection System for the LHC l The Risks l The Challenge l The LHC Layout l The Systems.
AT-MEL-PM, R. Denz, CERN, CH-1211 Geneva 23 1 QPS system and its risks  Principal risks  General remarks  Quench heater circuits  Quench detection.
For more info:
Interlocks for Magnet Protection System Iván Romera Ramírez, Markus Zerlauth - CERN.
Stephan Russenschuck, CERN AT/MEL, 1211 Geneva 23 Polarity Issues at the Inner Triplets and DFBXs.
October, 2009 Magnet Electrical Systems Bob Lambiase October, 2009 Internal Review.
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC] HWC Workshop ( ) Consolidation and major changes that have impact on the powering circuits.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
Faster ramp rates in main LHC magnets Attilio Milanese 7 Oct Thanks to M. Bajko, L. Bottura, P. Fessia, M. Modena, E. Todesco, D. Tommasini, A. Verweij,
16-17 January 2007 Post-Mortem Workshop Logging data in relation with Post-Mortem and archiving Ronny Billen AB-CO.
Review of Sector th of February Tunnel Access During Powering Tests Hugues Thiesen, AB-PO.
AT-MEL Group Meeting, CERN, 1211 Geneva 23 1 ElQA activities during hardware commissioning N. Catalan Lasheras.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
TE-MPE –EI, TE - MPE - TM 8/12/2011, Antonopoulou Evelina RQS circuit Simulation results Antonopoulou Evelina December 2011 Thanks to E. Ravaioli.
Training LHC Powering Robin Lauckner Software Tools for Commissioning Robin Lauckner 28 th March, 2007.
The prototype test String 2 May 13, 20082Roberto Saban – Academic Training Lecture 1 – Why LHC Hardware Commissioning?
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
PLCs at CERN for machine protection and access interlocks Session: Machine Protection and interlock systems at different labs I. Romera Ramírez (CERN /
Logo area HL LHC IT STRING M. Bajko CERN TE-TM and QXF Review.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
Machine Protection Review, Markus Zerlauth, 12 th April Magnet powering system and beam dump requests Markus Zerlauth, AB-CO-IN.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
NIKHEF Annual Meeting, December 18, The LHC Project Status report to the NIKHEF annual meeting Jos Engelen Based on last week’s reports to CERN.
The Super-FRS Multiplet, Magnetic and Cryogenic requirements
Superconducting Links R2E and Avalilability Workshop
Considerations from machine protection and the ELQA teams
HL-LHC IT STRING and Series test of SC link
SLHC –PP WP6 LHC IR Upgrade - Phase I.
Electrical insulation of magnet circuits in sector 7-8
Powering LHC magnets version 30/3/2007.
Testing of SC Magnets Status - November 2010
Minimum Hardware Commissioning – Disclaimer
The HL-LHC Circuits: Global View and Open Questions
LHC Hardware Commissionning
Powering the LHC Magnets
Large Booster and Collider Ring
MPE main activities planned for LS2
Powering from short circuit tests up to nominal
LS1 TE/MPE/EE CABLE ACTIVITIES
Powering Interlocks Quench back of corrector magnets vs revised ‘Global Powering Subsector OFF’ functionality M.Zerlauth, W.Venturini, R.Wolf, G.Kirby.
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Detailed global view on protection and detection of the circuits
Status of the BLHC ….work in progress! Mike Lamont CERN/AB 18/01/2008
Rüdiger Schmidt and Karl Hubert Mess
Mike Lamont 4th HERA and the LHC workshop 26th May 2008
Machine Protection Xu Hongliang.
Progress of SPPC lattice design
Brief report of the hardware commissioning activities
Triplet corrector layout and strength specifications
Commissioning of the LHC superconducting magnets systems: Why an LHC Hardware Commissioning? Specificity and complexity of this machine Roberto Saban.
Hardware Commissioning
Review of hardware commissioning
Presentation transcript:

+ many slides from various colleagues (KH, Rudiger, Paul, …) Introduction to electrical circuits terminology and machine sectorisation M.Zerlauth, CO-MI + many slides from various colleagues (KH, Rudiger, Paul, …)

Outline Yesterdays presentation of KH Dangers in electrical circuits Stored energies Quenches Components of electrical circuits Machine sectorisation and naming conventions Basics Electrical Circuits The concept of Powering Subsectors Electrical Circuit terminology and concepts Naming conventions Electrical Circuit components Circuit Types LHC Layout Database 2

Machine Sectorisation and naming conventions

LHC Powering in 8 Sectors For superconducting magnets, no DC powering across IPs Commissioning possible for each sector, independent of other sectors Main DC power feed at even points (MB, MQ) Some DC power feed at odd points Total of 1716 electrical circuits with >10.000 sc and nc magnets in LHC 5 4 6 DC Power feed Octant 3 DC Power 7 arc cryostat LHC Sector 2 8 Sector 1 P.Proudlock

Sector vs Octant vs electrical ‘half’-cells

The FODO Cell = 1 ‘electrical cell’

Corrector Magnet Circuits

Standard FODO cell = 2 electrical ‘half’-cell

Electrical half-cells - Electrical Circuits & connections To be found on CDD: LHC_LSD% + Layout Database Line N Main Busbars + Spool-pieces

Circuits and DFBs

Naming Convention =f (position) Examples: MB.A10R1 = Magnet of type MB, first instance in half-cell 10 right of point 1 (B1 & B2) MCO.15R1.B1= Magnet of type MCO, only instance in half-cell 15R1, acting on B1 only Examples: RB.A78 = Electrical Circuit connecting all magnets of type MB in the arc 78 RQS.L8B1 = Electrical circuit connecting a magnet/ magnets, left of 8 and acting on Beam 1 LHC Home – Naming Conventions: http://edms.cern.ch/cedar/plsql/navigation.tree?p_top_id=1894086584&p_top_type=P&p_open_id=1894086584&p_open_type=P

LHC Layout DB: http://layout.web.cern.ch/layout/

Sectorisation across systems Different sectorisation chosen by different systems, as the machine can be seen from different angles (mechanical, beam physics, electrical powering, cryogenics, vacuum…) Most important configuration for magnet powering (and current HWC) is the POWERING SUBSECTOR LHC-D-ES-0002 v.1.0

Concept of Powering Subsectors 8 machine sectors are sub-divided into 28 powering subsectors 8 arc subsectors (A12, A23, … A78, A81) 8 triplets (XL1, XR1, XL2,…, XR8) 12 matching sections (LL1, ML2, MR2, …MR8) Powering Subsector are electrically isolated from each other Main motivation is independent powering

Cyostats in sector 7-8 Y.Muttoni IP7 UJ76 SD7 TZ76 RR77 RE78 RE82 RA83 Point 7 Ferney RE78 RE82 PM76 RA83 UJ83 UA83 5 cryostats - Q6 (DFBMH) A78 (DFBAN - DFBAO) Q5 (DFBMC) - Q4 /D2 (DFBMA) - XL8 (DFBXG) Point 8 Prevessin IP8 Y.Muttoni

Sector 7-8 and cryostats IR7 Insertion Cleaning IR8 Insertion LHCb Matching section Arc cryostat (3 km) Matching section Inner Triplet DFBMH DFBAN DFBAO DFBMC DFBMA DFBX Each cryostat has its own set of PC. Only the beam, the access, the vaccuum, and the cryogenics couple Each cryostat one PPC (arc needs two, because fed from both sides) PPC close to the PC view from inside LHC ring

Quadrupole Correctors Sector 7-8 and magnets IR7 Cleaning Matching section Arc cryostat (3 km) Matching section Inner Triplet IR8 LHCb DFBMH DFBAN DFBAO DFBMC DFBMA DFBX Quadrupole Correctors 154 Arc dipole magnets and correctors Short straight sections (Quadrupoles and correctors) Quadrupole Correctors Insertion dipoles IR Quadrupoles Correctors Each cryostat has its own set of PC. Only the beam, the access, the vaccuum, and the cryogenics couple Each cryostat one PPC (arc needs two, because fed from both sides) PPC close to the PC

Sector 7-8 and underground areas IR7 Cleaning Matching section Arc cryostat Matching section Inner Triplet IR8 LHCb DFBMH DFBAN DFBAO DFBMC DFBMA DFBX Each cryostat has its own set of PC. Only the beam, the access, the vaccuum, and the cryogenics couple Each cryostat one PPC (arc needs two, because fed from both sides) PPC close to the PC UJ76 RR77 UA83

Sector 7-8 and power converters IR7 Cleaning Matching section Arc cryostat Matching section Inner Triplet IR8 LHCb DFBMH DFBAN DFBAO DFBMC DFBMA DFBX Energy extraction Each cryostat has its own set of PC. Only the beam, the access, the vaccuum, and the cryogenics couple Each cryostat one PPC (arc needs two, because fed from both sides) PPC close to the PC UJ76 RR77 UA83 Power Converters and other equipment Power Converters and other equipment

Sector 7-8 and powering subsectors IR7 Cleaning Matching section Arc cryostat Matching section Inner Triplet IR8 LHCb DFBMH DFBAN DFBAO DFBMC DFBMA DFBX Each cryostat has its own set of PC. Only the beam, the access, the vaccuum, and the cryogenics couple Each cryostat one PPC (arc needs two, because fed from both sides) PPC close to the PC UJ76 RR77 UA83 Powering Subsector A78 34 electrical circuits Powering Subsector A78 43 electrical circuits Powering Subsector ML8 15 electrical circuits Powering Subsector XL8 14 electrical circuits Powering Subsectors: LHC-D-ES-0002 EDMS Document No. 361532

Electrical Circuits and Terminology

Normal-conducting circuits 40 nc circuits in the LHC, connecting some 144 magnets RD1.LR1, RD1.LR5 RQ4.LR3/7, RQ5.LR7, RCBWH/V in IR 3/7 RMSD in IR6… Mainly in cleaning insertions (IR3, IR7) and close to high luminosity experiments 8 additional powering subsectors ‘WLR1’, ‘WLR2’,… Warm Magnet Interlock Controller Power Converter Normal conducting cables Several thermo-switches @ 60°C Magnet 1 Magnet 2

Superconducting magnets / circuits 98% of circuits in the LHC are superconducting ~1680 circuits, connecting >10.000 magnets Various families f (energy, current, # magnets, location, …) Rated current range from 60A – 13kA Normal conducting cables Power Converter Superconducting Diode Energy Extraction Quench- Heater QPS HTS Current Leads Quench Signal Magnet 1 Magnet 2 sc busbar DFB

Power converters and water cooled cables Water cooled cables 12 kA Power converter 6 kA

DFBs with current leads - feeding current from warm to cold http://hcc.web.cern.ch/hcc/cryogenics/cryo_dfbs.php DFB and current leads

Cryogenic Feed Box with HTc Current Leads

Cryogenic Connection

Installation of the Cryogenic Transfer Line

(13kA for 8RB, 24 RQD/F circuits) 202 DQEMC systems (600A circuits) Energy extraction resistors MB Energy extraction switch house 12 kA 32 DQR/DQS systems (13kA for 8RB, 24 RQD/F circuits) 202 DQEMC systems (600A circuits) Energy extraction switch 12 kA Diode for 12 kA

The LHC Magnet Zoo

Superconducting Magnet Units Not quite up to date…

Magnet inventory 1232 main dipole magnets powered in series with the same strength to make it around the LHC 752 orbit corrector magnets powered individually to ensure that the beam follows the design orbit (within about 0.5 mm), Focusing and defocusing quadrupole magnets powered in series to keep beam size limited Lattice sextupole magnets powered in series to correct the trajectories for off-energy particles, Multipole-corrector magnets (sextupoles, decapoles, octupoles, ...) to correct field imperfections, to suppress instabilities, etc., powered in series Corrector magnets to adjust essential beam parameters (quadrupoles) Insertion dipole and quadrupole magnets to ensure beam crossing / increase the interbeam distance / focus beams for experiments etc. http://edms.cern.ch/cedar/plsql/navigation.tree?top=1459088716 32

Circuit Types defined for HWC and operation 60A (752 orbit corrector circuits) 80-120A (LSS and DS orbit correctors) 600A EE (600A correctors with Energy Extraction System) 600A no EE (600A correctors without Energy Extraction) 600A no EE crowbar (600A correctors without EE, but additional crowbar) IPQ (Individually powered quads, Q4-Q10) IPD (Separation and re-combination dipoles) IT (Main Inner Triplet Circuits) Main Dipole and Quadrupoles

QPS Types QPS classification as function of # magnets in circuit (stored energy) Extraction system Parallel protection (diode or resistor) Quench heaters

PC_DISCHARGE_REQUEST Interlock Types PC_PERMIT QPS PIC PC Interlock Type A (=13kA main + IT) PC_FAST_ABORT CIRCUIT_QUENCH POWERING_FAILURE DISCHARGE_REQUEST PC_DISCHARGE_REQUEST PC_PERMIT_B1 PC QPS PIC PC_PERMIT_B2 PC Interlock Type B2 (=all quads of IPQ) PC_FAST_ABORT CIRCUIT_QUENCH POWERING_FAILURE PC_PERMIT QPS PIC PC Interlock Type B1 (=600A EE, 600A no EE, 600A no EE crowbar + all dipoles of IPD) PC_FAST_ABORT CIRCUIT_QUENCH POWERING_FAILURE PC_PERMIT PIC PC Interlock Type C (= 80-120A) POWERING_FAILURE

Types of electrical circuits A: main dipoles (8), main quadrupoles (16), triplet quadrupoles (8) extraction of the energy stored in the magnets when requested by the Power Converter in case of failure is performed by the QPS B: magnets equipped with QPS B2: insertion quadrupoles using MQM / MQY (3.9kA – 5.8kA) B1: insertion dipoles (4.6kA-6.2kA) and most 600A corrector magnets extraction of the energy stored in the magnets not required in case of Power Converter failure B1: electrical circuits with one Power Converter B2: electrical circuits with two Power Converters C: dipole corrector magnets in the insertions and other circuits with corrector magnets with little stored energy (60A, 80A and 120A) connection to Powering Interlock Controller D: orbit dipole corrector magnets in the arcs (60A) no connection to Powering Interlock Controller

Physical installations in RR77 Powering Interlock System QPS 600A protection unit 600A EE system 600A converter

Physical installations in RR77 Patch Panels Industrial Controller

Conditions for powering Cryogenics: Magnet and current leads must be at correct temperature Safety systems: must be ready (AUG – arret urgence general, UPS – uninterruptible power supplies, …) Power converter: must be ready (including cooling water etc.) Quench protection system: must be ready (quench heaters charged, extraction switch closed) Power converters Operator / Controls: must give permission to power Powering Interlock Controller (PIC) Energy extraction Warming up of the magnet due to failure in the cryogenic system Warming up of the magnet due to quench in an adjacent magnet AUG or UPS fault Power converter failure Quench in a magnet inside the electrical circuit

Layout DB All this can also be found and browsed in detail in the LHC Layout DB: http://layout.web.cern.ch/layout/ 40

Thanks a lot for your attention Questions? 41