Advisors: Gary Byram, Ph.D.

Slides:



Advertisements
Similar presentations
Used to Procure Goods & Supplies. Office supplies Operating supplies Computer hardware and software (non- capitalized
Advertisements

January 6. January 7 January 8 January 9 January 10.
1 Project Plan Presented by Timika Gatdula April 9, 2002 AGRID.
X. X September Mo Tu We Th Fr Sa Su
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
Compressor ReVamp and Fabrication PO9452. Update Revised Concept Generation Selected some concepts Scheduled Conference call with Dresser Rand Schedules.
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
Chapter 13: Preparing the System Proposal Instructor: Paul K Chen.
Chicas, este calendario si es pa' nosotras !!!!!.
RESTORATION OF A PNEUMATICALLY CONTROLLED END-OF-ARM-TOOLING (EOAT) FOR CLASSROOM TEACHING Trent Lott and Chase Keller Advisor: Dr. Mohammad Saadeh Class:
6/23/11 FAIS,LLC Five Apple/Inpatient Specialist Case Study Patient Volume/LOS/ Payor Source Data.
Template For Building Project Schedule Jazz Presentation.
3D Imaging Software Brad Boldizar, Aubrey McKelvey, and Mackenzie Thomas Advised by: Dr. Paul King Matt Moore.
MedTG Needle Design Steve Harris Adam Travis Brett Byram Group #15 Advisors: Gary Byram, Ph.D. Paul King, Ph.D., P.E.
East Hartford High School Library Media Center Monthly Report June 2011.
Originally Created By: Sheila Elliott MN, RN Revised By: Tina Haayer, RN, BScN.
Banner Web for Finance Want to print reports for your department? Need reports for a specific period? Want to compare this fiscal year to the last fiscal.
Multifunction IV Catheter Brett Byram 1, Steve Harris 1, Adam Travis 1 Advisors: Gary Byram, Ph.D. 2 ; Paul King, Ph.D., P.E. 1 1 Department of Biomedical.
© 2015 IBM Corporation Cost Benefit Analysis Workshop Consolidation of Disparate Environments Shantan Kethireddy April 28, 2015.
Implanted Ports: Procedure for Access and Care
Accessible Home Vital Signs Monitoring System Kristyn Eilertsen Adam Goodale Stephen Kepper Sunil Narayan Stacey Tarver Group 22 BME 272.
MedTG Needle Design Steve Harris Adam Travis Brett Byram Group #15 Advisors: Gary Byram, Ph.D. Paul King, Ph.D., P.E.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
September 2008 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Dual Lumen Peripheral IV Catheter Riley Smith Kelly Baron, Erik Frazier Project Mentor: Sandra Gartner 2/1/2005.
RESTORATION OF A PNEUMATICALLY CONTROLLED END-OF-ARM-TOOLING (EOAT) FOR CLASSROOM TEACHING Trent Lott and Chase Keller Advisor: Dr. Mohammad Saadeh Class:
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Sole Supports Imaging Software Group 9: Edward Krei (BME) Edward Krei (BME) Michael Galante (CompE) Michael Galante (CompE) Derrick Snyder (CompE) Derrick.
Leg Compression Device to Assist in Ultrasound Testing Design Team: Mark Rawls and Jordan Winston Advisors: Dr. Raul Guzman and Dr. Paul King.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
February 4, 2004BME 272/2731 Investigation of Bubble Formation in Tuohy-Borst Adaptors Department of Biomedical Engineering Melanie Bernard, Isaac Clements,
Status Report #3 Food DIP Team 11 Device that detects irregularities in perishable goods before distribution Brandy Alger Travis Ayers Josue Figueroa Joaquin.
3D Imaging Software Brad Boldizar, Aubrey McKelvey, and Mackenzie Thomas Advised by: Dr. Paul King Matt Moore.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Automatic Fire Fighting System Athan Jefferson Advisor Dr. Junkan Ma Instructor Dr. Cris Koutsougeras ET 493 Senior Design I.
RESTORATION OF A PNEUMATICALLY CONTROLLED END-OF-ARM-TOOLING (EOAT) FOR CLASSROOM TEACHING Trent Lott and Chase Keller Advisor: Dr. Mohammad Saadeh Class:
January 26, 2004BME 272/2731 Investigation of Bubble Formation in Tuohy-Borst Adaptors Department of Biomedical Engineering Melanie Bernard, Isaac Clements,
Orientation Thursday, October 20 Washington Elementary
EXER-STATION Bichar Myrtil Tarafa M. Al-Awaj.
Advisors: Gary Byram, Ph.D.
Inducing Hypothermia in Neonatal/Pediatric ECMO Cases
Dual Port Peripheral IV Catheter Kelly Baron Erik Frazier and Riley Smith Project Mentors: Sandra Gartner and Vorp Labs February 22, 2005.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
Development of a Two Port IV Catheter to Improve Patient Comfort
Endotracheal Tube Cuff Valve
SAFE INJECTION PRACTICES
Advisors: Gary Byram, Ph.D.
Pediatric Anesthesiology
McDonald’s Kalender 2009.
IGCSE Combined Science
Information Management & Financial Analysis for HR Managers
Analysis of Front Desk Processes at the Vanderbilt Cancer Center
Medical Errors Zheng Yan Advised by: Dr. Dan France, Ph.D, MPH.
Environmental Management Commission, March 9, 2017
McDonald’s calendar 2007.
Vermillion River Greenway - Hastings MASTER PLAN
Circle Chart Template Process Name.
Non-Transcranial Electroanesthesia Device
McDonald’s calendar 2007.
The Virtual Instruments
May is Coming !!! January 31st: Project approval (16 days from now) • Brainstorming, team formation, successful RFA February 7th: Project proposal (+7.
The Virtual Instruments: Presentation 2
Habitat Changes and Fish Migration
2015 January February March April May June July August September
Habitat Changes and Fish Migration
Presentation transcript:

Advisors: Gary Byram, Ph.D. MedTG Needle Design Steve Harris Adam Travis Brett Byram Group #15 Advisors: Gary Byram, Ph.D. Paul King, Ph.D., P.E.

Problem Patient IV injection and blood sampling => multiple needle sticks Excessive waste, biohazard Psychological damage, trauma Time spent acquiring, lab time – for each stick Many needle sticks, increased infection risk

Solution? Combined needle design, multi-lumen Multifunctional: sensors, blood drawing, injection Valves & Ports Multi-lumen catheter Blood draw lumen IV administration lumen X Sensor access orifices

Plan of Attack Computational Model: CFD software Physical Model: testing, rough design

Proposed Schedule December: lit review, begin comp model January: comp modeling, begin physical testing with rough needle model February – March: refine design parameters, continue testing April: finish design, prepare presentation

Needs Dr. Collins: In-house CFD Software, setup accounts Dr. Giorgio: building test system, reducing cost as mentioned on proposal More conference calls with MedTG Supplies to order: non-communicating double-lumen needles