LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
Advertisements

28/01/2013LHC 8:30 meeting Summary of Week 4 pPb physics Machine Coordination: Mike Lamont & Jan Uythoven Ion coordination: John Jowett.
Tuesday 7 th August - morning 07:10 Reinjection after loss of fill 2920 to UFO near ALICE  26 pb -1 in 1h16m; peak lumi 6.4e33 cm -2 s -1 08:10 dump at.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Friday 15th June 01:11 Injection.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday 21st January & night
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday fill with 1092 bunches (6 h stable beams)
LHC summary week 32 Coordination: Mike Lamont & Jan Uythoven
LHC Progress Week 6 Coordination: G. Arduini, E.B. Holzer
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Thursday morning – optics correction
Barbara Holzer, Jorg Wenninger
Tuesday 22nd January - morning
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
LHC Morning Meeting - G. Arduini
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Lost at 12:05 to power converter (RTQX2.R1) problem
Note: squeeze in Atlas, CMS, LHCb and Alice on going
LHC Morning Meeting - G. Arduini
Wednesday 8th August & night
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Friday morning 10:30 Optics measurements and corrections.
Wire almost entirely through beam before BLM triggers dump
Saturday – Morning 7:36 beams dumped
Tuesday 9th November 10:02 Fill beams dumped
Sunday
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
Wednesday 03/11 – The Plan Finish electron-cloud program:
Thursday morning 7:20 – 12:30 faults of BLM sanity check, RQX.L8 QPS trip and iris scanner in UJ47. Access: Pt 8 for ELQA on RQX.L8 (The voltage.
Sunday/Monday & :30 Stable beams. Fill #1851.
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Monday 24 October hours of 25ns MD
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday 3rd November - morning
Saturday Nov Stop proton operation. Switch back to ions
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Thursday 22 September 2011.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Saturday :42 stable beams fill 3541
LHC Morning Meeting - G. Arduini
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Wednesday 23/2 Thanks CRYO!!!.
Thursday
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
Another Immortal Fill….
Wednesday 26 October 2011.
Wednesday morning / afternoon
Wednesday morning Waiting for PS – problem on RF cavity.
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Monday 152 bunch operation summary
Presentation transcript:

Thursday 24th January - morning 07:40 Beams dumped by QPS trigger on RQX.L8 during filling 08:50 cycling whole machine 10:05 Injecting probes SPS commissioning new cycle for NA61 Problem with protons – chromaticity Issues various: LHC BPM calibration done with wrong settings Spurious losses in SPS with ion beam Energy mis-match between PS and SPS Tune excursion Chromaticty 16:00 Start ramp 25-10-2013 LHC status

Thursday 24th January - afternoon Ions not happy through squeeze, low lifetime coming into collisions Suspect big beams from SPS (protons set to 1.5e10 ppb for this fill) 16:55 Stable beams – fill 3489 Initial luminosity: 8.55e28 cm-2s-1 ALFA and TOTEM using OP sequences – OK 22:42 Beam dumped by BPMS – argh! 5h51m in Stable beams; 1.1 nb-1 in ATLAS/CMS 25-10-2013 LHC status

Overnight Some delay filling: 04:30 Stable beams fill 3490 SPS RF: It was found that for the LHCION1 and LHCION2 cycles it had been necessary to re-adjust the radial steering at flat top to obtain a smooth switch-over from radial to synchro loop. (Thanks to Thomas Bohl) 04:30 Stable beams fill 3490 Initial lumi: 1e29 25-10-2013 LHC status

BPMSs 25-10-2013 LHC status

Position Interlock BPM Beam instrumentation BPM Position Interlock BPM BLMs Plus – 2 BCTs per line at MKB – 4 screens (OTR) per line at MSD, MKB, (TD), TDE 25-10-2013 LHC status

B1 and B2 bunch charges 23/1/2013 @ 20:30:38 IR6 BPMs analysis Eva Calvo Zooming vertical axis 3.65p/bunch B2 25-10-2013 LHC status

Eva Calvo System B channels – Vertical Turn Average position Limits: -3.26 mm & 2.74mm Limits: -2.26mm & 3.74mm Limits: -3.11mm & 2.89mm Limits: -3.15mm & 2.85mm Eva Calvo - VerTurnPosition of system B channels. -> As for the Horizontal plane, the average position per turn seems well within the interlock limits. B2 is much more noisy than B1, what could be a symptom that we are approaching the sensitivity limits.

>70 !! In 100 turns - Again the same problem in horizontal (and slightly in vertical) of BPMSA.B4R6.B2. Only plot here this channel, since the rest of channels and variables are “clean”. Eva Calvo 25-10-2013 LHC status

BPMS – change limits - discussion All three dumps due to BPMSA.B4R6-Horizontal, between 3 – 4e9 A change of the closed orbit would be detected by the SIS, independent of the BPMS. This adds some redundancy, and orbit changes cannot be very fast. We did not observe any bunches becoming unstable in the case of low beam intensity. There are no signs of instabilities. In case that some bunches would become unstable, this would be a betatron oscillation that would be seen by the other BPMS. We are operating with low beam power (although the damage of ion bunches should not be neglected). Rudiger’s conclusion: I would not be too worried to make the proposed change to 2000 bad readings over 100 turns, since 200 would not help. Another options is to go for the next fill for a compromise, say, to 500 bad reading over 2000 turns, and then see how we gain. Rudiger Schmidt 25-10-2013 LHC status

Raising limits After some debate: Change BPMS interlock setting on BPMSA.B4R6.B2 H&V for both beams from 70/100 to 500/100 (JU) Beams dumped after 5h51m 25-10-2013 LHC status

Change in BPMS interlock settings 25-10-2013 LHC status

Misc New IQC version (Lene Drosdal) The new version accepts an input on where the pilot bunch is and ignores that bucket in the analysis. Testing done on beam 2 using bucket 5131. Pilot is ignored for further filling. Now the injection sequencer need to be modified to set this field before the injection. – Delphine to test FBCT – phase – on-going problems – David Belohrad Batch by batch blow-up at 450 GeV – next fill (PB) 25-10-2013 LHC status

Typical beam lifetimes 25-10-2013 LHC status

Luminosity lifetime 25-10-2013 LHC status

Various Wire scanners not to be used until checked in tunnel V/d Meer scans next week Mon/Tue Access requests: Wire scanner, J.Emery, point 4, 2 hours. Collimators UJ33, test position sensors, M. di Castro, A.Masi, 20 minutes. “Train”, B.Feral, D. Paulic, PM56/UL55, 1 h during working hours BGI, M.Sapinski, R4, ½ h LHCf has a problem in a part of the frontend electronics placed in the tunnel, we would like to ask a two hours access at the next opportunity in the shadow of the other activity. Takashi Sako Quench Test on Q6.L8 – the scope is not yet in place, 1h in the UA. Mateusz Bednarek CMS cryogenics – filter to be cleaned Ludovic Mourier 165232 Restore pump for QRL insulation vacuum in sector 45 (which has a leak). 25-10-2013 LHC status