Project Management Unit #4a

Slides:



Advertisements
Similar presentations
Microsoft Project Entering and Organizing Tasks Adapted from the Microsoft Step by Step Series by Aaron Schroeder.
Advertisements

MS-Word XP Lesson 7.
MS® PowerPoint.
LSU 10/09/2007MS Project Example1 Project Management Unit #4a.
Word Processing First Steps
OPSM 639, C. Akkan1 OPSM 639 Project Management Introduction to Microsoft Project - Part 1: Creating the Work Breakdown Structure and Entering Activity.
Present your project in Word, PowerPoint, or Visio Copy Project information to a Web page Does your organization or team already have a Web site that’s.
Project Basics Lesson 1. Skills Matrix SkillsMatrix Skill Start Microsoft Project Standard Create a project planOpen a new project plan Specify a start.
Starting a New Project Cheryl A. Wilhelmsen Lee Ostrom.
Using the Unity 98 Cordless Response System Directions : Courtesy of IHC public relations.
OPSM 639, C. Akkan1 OPSM 639 Project Management Introduction to Microsoft Project - Part 2: Developing a Network Plan.
Microsoft Project Presentation By Corey Johnson 10/11/00.
Power Point Presentation - Advanced Julia J. Stahl Distributed System Specialist.
Project Plan Formatting – Fundamentals Lesson 6. Skills Matrix SkillsMatrix Skill Format a Gantt ChartModify the Gantt Chart using the Bar Styles dialog.
Microsoft Excel Tutorial. Spreadsheet Basics! The Microsoft Excel Window  When you open Microsoft Excel, this screen will appear. Then, if necessary,
Office 2003 Post-Advanced Concepts and Techniques M i c r o s o f t Word Project 8 Working with Macros and Visual Basic for Applications (VBA)
Spreadsheet. Objectives Create a new blank workbook. Create a new blank workbook. Identify user interface elements that you can use to accomplish basic.
ERT461 BIOSYSTEMS ENGINEERING DESIGN 1 ERT424 BIOPROCESS PLANT DESIGN 1.
Research Methodology Workshop: Making Timescale in Research Proposal
PowerPoint Tutorial By Education World Your Logo Here It’s easier than you think!
Advanced Project Plan Formatting Lesson 14. Skills Matrix SkillsMatrix Skill Customize the calendar view Format bar styles for tasks in the Calendar view.
· Adding and Renaming Worksheets
← Select Exchange Once logged in. ↓ click Join Course Icon.
How to create a Mailmerge using the Programs word and access By Mrs Douglas 22 October 2010.
MS Project Tutorial 1 Goal: Introduce you to the basic idea of MS Project The basic idea is to answer the following questions and record the answers as.
CREATING TEMPLATES CREATING CUSTOM CHARACTERS IMPORTING BATCH DATA SAVING DATA & TEMPLATES CREATING SERIES DATA PRINTING THE DATA.
TUTORIAL 9 INSTRUCTOR: HANIF ULLAH ID: OFFICE #: 2029 DATE: 22/04/2012 Introduction to MS Project 2007.
Power Point Presentations “A how to primer”. Start with a “blank presentation” Instructions 1. Launch (or open) power point. 2. Close the office assistant,
Microsoft project 2003 Chapter 3 Entering Tasks. There are several approaches that we can take to fill in the Gantt Chart. Brainstorming Sequential Team.
Instructions.  Open up the letter that Adam has given to you  Format it so it look professional.
Title of presentation goes here Name of presenter Location/date © 2006 MPA. All rights reserved. Organizing Tasks Using Outlining and Work Breakdown Structures.
1. 2 Word Processing Word Processing is writing words and sentences on the computer. It is easy to change or move text in a word document. People use.
By: Ms. Abeer Helwa 1. WORD WEB APP 2 Word Web App is a limited version of Word, enabling you to edit, format, and share documents online. Word Web App.
By: Ms. Abeer Helwa 1. WORD WEB APP 2 Word Web App is a limited version of Word, enabling you to edit, format, and share documents online. Word Web App.
Create your first workbook Edit data and revise worksheets Everyone makes mistakes. Even data that you entered correctly can need updates later on. Sometimes,
Charts Chart. Choosing what to show in a Chart To show cost of individual spend in Leeds: Highlight items and price ONLY (no headings or totals).
How to Create a Power Point Presentation. Topics that will be covered: 1) Getting Started 2) Common Features 3) Working with Text 4) Working with Graphics.
MS WORD INFORMATION TECHNOLOGY MANAGEMENT SERVICE Training & Research Division.
Microsoft Project 2003 By: Mahmoud Saad El-Din. Topics  Creating a new project.  Working with workspace project.  Defining project information.  Working.
Working with Tables A table is a grid of cells arranged in rows and columns. Tables can be customized and are useful for various tasks such as presenting.
Chapter 11 Enhancing an Online Form and Using Macros Microsoft Word 2013.
PowerPoint Tutorial.
Application Extension 10a
Creating a Presentation
International Computer Driving Licence Syllabus version 5.0
Main presentation title Second title line if required
Main presentation title
Microsoft Office PowerPoint 2003
How to Use this PowerPoint Template
With Microsoft FrontPage 2000
European Computer Driving Licence
International Computer Driving Licence Syllabus version 5.0
Unit 2 Terms Word Processing.
Microsoft Excel 101.
Project Management Unit #4a
: Animated text countdown (Advanced)
Learning PowerPoint Just the basics.
Microsoft Excel 101.
Project Management Unit #4a
Format a One-Page Report: 6.1 project 1 through 6.1 project 3
Information System Analysis
Format a Table: 4.4 project 2
Entering the Task List Dr. George.
European Computer Driving Licence
University of Warith AL-Anbiya’a
Introduction to PowerPoint
Parkdale EFC LPD Church of the Week Please pray for:
Chapter 8 Using Document Collaboration and Integration Tools
Lab 08 Introduction to Spreadsheets MS Excel
How to Use Microsoft Excel for Data Entry
Presentation transcript:

Project Management Unit #4a MS Project Example Project Management Unit #4a LSU 10/09/2007 MS Project Example

New Project Screen On starting Project a blank template will appear. LSU 10/09/2007 MS Project Example

Basic Project Information From the “Project” menu select “Project Information” and enter the anticipated project start date. LSU 10/09/2007 MS Project Example

Enter the major tasks Type in the major tasks (WBS level 1) in the “Task Name” box. Each row is a separate task Do not worry about the rest of the columns for now LSU 10/09/2007 MS Project Example

Insert Rows Select the row above which you want to insert a subunit Select “New Task” from the “Insert” menu To delete a row, select the row and press the “Delete” key LSU 10/09/2007 MS Project Example

Enter the subunit task names Type in the name of the subunit task in the “Task Name” field Subunits are “indented” with the right arrow on the task bar When subunits are so “indented” the major unit will become bold and the Gantt chart bar will change shape LSU 10/09/2007 MS Project Example

Complete entering WBS Process of inserting rows, typing in the task name and indenting the subunit continues until all tasks in the WBS are entered LSU 10/09/2007 MS Project Example

Display the WBS code Select the “Information” column, right click and choose “Hide Column”. Next select the “Task Name” column and from the “Insert” menu select “Column”. The following pop-up will appear. Choose “WBS” as the “Field name” LSU 10/09/2007 MS Project Example

Showing the WBS code The correct WBS code number will now be displayed for all tasks LSU 10/09/2007 MS Project Example

Task bars With all subunits inserted the lowest level will be blue rectangles and higher levels will be black bars with points on the ends. LSU 10/09/2007 MS Project Example

Distinguishing different levels You can change the color of the task bar to distinguish between the different levels in your WBS Select the task bar to change (in the Gantt chart area), right click and select “Format Bar”. Change the color of the “Start”, “Middle” and “End” LSU 10/09/2007 MS Project Example

Results after task bar change The results of changing the task bar color are shown below LSU 10/09/2007 MS Project Example

Set the task durations Now enter the time associated with each task in the “Duration” field. See the MS Project Help for choices on units. Set durations for the lowest level tasks and the total time will be summarized or rolled-up to the next highest level. LSU 10/09/2007 MS Project Example

Set the task predecessors Enter the task dependence (i.e. which tasks must be complete prior to starting the next task) in the “Predecessors” field. You need to use the row number, not the WBS code. LSU 10/09/2007 MS Project Example

Enter all predecessors Here all the task predecessors are determined and entered, but the Gantt chart now needs room to display fully LSU 10/09/2007 MS Project Example

Set the timescale of the chart From the “Format” menu select “Timescale” Set the Major Scale to Months Set the Minor Scale to Weeks LSU 10/09/2007 MS Project Example

After timescale change Now the full Gantt chart from project start to end can be displayed LSU 10/09/2007 MS Project Example

Make an image for documents To make a GIF image that can be inserted into documents, first arrange the chart and task info boundaries to display just what you want. From the “Edit” menu select “Copy Picture” Select “To GIF image file:” and enter a filename for the image Select what to copy: Rows on screen or Selected Rows Select the timescale as either what is shown on the screen or for specific dates Click OK and the image will be generated. LSU 10/09/2007 MS Project Example

Final version of project Below is the GIF image of the example project ready to be inserted in a document. LSU 10/09/2007 MS Project Example