Modelling Internal Arc

Slides:



Advertisements
Similar presentations
CETI Programme.
Advertisements

25 Novembre 2010 Safe Maintenance through design From machine engineering for safe maintenance to maintenance engineering for safe machine Workshop Maintenance.
Electrical Installation
The Technology Integration Planning Model
Inspection & Preventive maintenance of breakers
IEC IEC Standard defines:
1 CNS/GSS/2008/M1 1 Module 1 Basic Terminologies and Characteristics of Switchgear.
1 CNS/GSS/2008/M6 1 Module 6 Degree of Protection.
Motor Starter Coordination
Arc-Killer SV-25 – DF-2 + Range Arc-Killer SV-25 - DF-2 + Range.
(Adapted from:D.T. Hall:Practical Marine Electrical Knowledge)
Budget Shortfall Options Ian Wyatt - Atkins JIP on Bursting Disks for Shell & Tube Exchangers – 2 nd Stakeholders Meeting.
Hogan Lovells EU Product Safety and Market Surveillance Reforms How will this impact businesses – Lawyers' view BIICL seminar, 2 October.
Engineering innovative electronic surge protection for PV plants Costruzioni Elettromeccaniche P. Torresan SDS ® Surge Defence.
Transformer Testing Station Determining Sensitivity of a Relay to Inter-turn Faults on an Energized Power Transformer Sponsored by: Schweitzer Engineering.
Designing a Product Product design is usually a problem that requires a creative Design and/or manufacturing solution.
Proposed Design and the Operation of a Disconnecting Device for Small EG Installations Prepared by Hendri Geldenhuys.
Regulatory Body MODIFIED Day 8 – Lecture 3.
CONTACT SEMINAR November 2008 Project management tools.
Software Quality Assurance
IAEA International Atomic Energy Agency International Workshop on the Safe Disposal of Low Level Radioactive Waste WG3 debriefing.
Pipeline Qra Seminar Title slide Title slide.
Monitoring and Evaluation in Humanitarian Aid: Quality Procedures PROJECT – STRAND 1 – Training and Capacity Building.
QUALITY MANAGEMENT SYSTEM ACCORDING TO ISO
The Technology Integration Planning Model
THE 2015 NATIONAL JOINT UTILITIES GROUP AWARDS Please complete and return the submission form below. Please read all terms and conditions before submitting.
© 2005 PRS S.A. Ships’ electrical power network systems protected from damages caused by short-circuit current other than three-phase symmetrical current.
LSST Camera CD-3 Review Brookhaven National Laboratory, Brookhaven, NY LSST Safety Council Camera Review Bremerton, WA 2015 LSST Camera Environment,
PPE: Face, Head, Foot, and Hand The participant will better understand the various types of PPE and their importance as laid out by OSHA.
A. Lisowiec 1, A. Nowakowski 1, Z. Kołodziejczyk 1, B. Miedziński 2 1 Centre For Tele-Information Systems and Hardware Applications, Tele and Radio Research.
1 PED: equivalent overall level of safety PED Annex 1, clause 7: The following provision apply as a general rule. However, where they are not applied,
BT announce their 21 st CN Plans Alastair Adamson ETUG Telecommunications Coordinator – 15/07/04 Does the Electricity Industry have any reason to be concerned?
Use of Fieldbus in safety related systems, an evaluation study of WorldFIP according to proven-in-use concept of IEC Jean Pierre Froidevaux WorldFIP.
Prof R T KennedyEMC & COMPLIANCE ENGINEERING 1 EET 422 EMC & COMPLIANCE ENGINEERING.
2 IMPACT - THE FIRE PERMIT = Hot Work Permit 3 Welcome ! This course is linked to the use of IMPACT, so it is assumed that: You know how to use IMPACT.
Isolation Lock-Out Room Johns River Quarry Site Contact: Blake Ardrey, Quarry Manager, BCM, Johns River Quarry Phone:
INTEGRAL SYSTEM OR SIMPLE COMBINATION
IAEA International Atomic Energy Agency INTRODUCTION Module 2.
Question 1.1: A) Do the new catagories as defined in the project better meet the market values? B) Are there other market values or catagories.
Low Power and Shutdown PSA IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information IAEA Workshop City, Country.
Research Programme "Sustainable Land Management" BMBF Div. 723 Global Change Dr. Rainer Müssner.
Health & Safety in Construction 4A7 Design & the Built Environment John O’Connor.
About Us! Rob StockhamBA IEng MIEE General Manager Moore Industries-Europe, Inc MemberIEE Honorary Secretary ISA England Institute of Directors DirectorThe.
Hot Work Permit Osan AB Fire Emergency Services.
Workshop on Appraisal of Disassembled Magnets: Lessons learned March 17 th, 2005 Boundary Conditions-Technical Specification Jos Vlogaert.
Egyptian and Italian Cooperation Programme on Environment Quantitative Risk Assessment of Oil and Gas Plants Mr. Gaetano Battistella 1 Working Group n°.
The Best Fire Extinguishers in Milton Keynes to Secure Your Home.
Electrical Distribution Analysis & Testing Everything You Need To Know About Power Distribution By Current Solutions PC.
Hipot Testing 101.
Motor Protection Dr. Hendro Rijanto.
Question 1.3: a) Is the evolution towards more integration and more fixed design solutions compatible with the variety of applications ? b) What.
OH&S Plant Obligations make
Risk Assessments.
Overview of the WTO SPS Agreement and the role of
Joint Meeting SPS Upgrade Study Group and SPS Task Force
the CERN Electrical network protection system
UR Lease Administration Research Administrators October 2017
Definitions.
Changes in IEC MV metal-enclosed switchgear standard
Safety upgrade for a chemical company
RISK ASSESSMENT AND METHOD STATEMENT
Standards Comparison: USA and Europe
BLOCK DIAGRAM: Micro controller.
Vehicle lifts activity
Technological Design Process Unit 1 Lesson 4
The Technology Integration Planning Model
PROVISIONS UNDER THE HABITATS DIRECTIVE RELEVANT TO NEEI
TRUCKERS HELPER Fully Integrated and Real-Time ERP Solution.
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Client duties on CDM Regulation 2015
Presentation transcript:

Modelling Internal Arc Question 1-2 Modelling Internal Arc

Is modelling sufficient to insure Internal Arc class compliance ? Abcd Special report Question 1-2 Is modelling sufficient to insure Internal Arc class compliance ? we are performing both calculations and tests for more than 20 years our answer based on this experience is:  not sufficient enough ! the better solution is calculations verified and backed by tests

Abcd Special report Question 1-2 - modelling helps during preliminary design phase - it also helps during test phase - it helps for extrapolation in similar design - it can be utilised for building construction and environment  but calculation can only be useful if it has been verified and coordinated with test results in real practice

What is the impact of this IA class in term of design? Abcd Special report Question 1-2 What is the impact of this IA class in term of design? our answer based on the experiences gathered from different countries and manufacturers integrated in Alstom T&D is:  yes , there is an impact ! first it is necessary to design to avoid any arc fault

Abcd Special report Question 1-2 second, it is necessary to design to fulfill the 5 criteria (IEC62271-200) , i.e., : - manage pressure , manage thermal effects since arc fault withstand is a standard requirement , this must be taken into account from the very beginning of the design to be a basic characteristic of product as a manufacturer we fully integrate this in our design to ensure safety to users.

Abcd Special report Question 1-2 Are there any experience carried out with active arc protection system ? we have experience within Alstom T&D with different kinds of active arc protection systems such as luminary detection, or micro contacts on flaps etc.,

Abcd Special report Question 1-2  it helps to reduce the fault duration significantly and consequently to reduce damages on equipment it does not fully replace the passive withstand of the cubicle which ensures safety to people arc fault withstand of a cubicle can be compared with an airbag; « have it in standard, but Do not make use of it as far as possible ! »