Lunar Reconnaissance Orbiter (LRO) Mission

Slides:



Advertisements
Similar presentations
Overcoming Customer Constraints on Requirements Documents Presented by: Robert Smole Presented by: Robert Smole November 5, 2008 Sub-Optimization of Systems.
Advertisements

Inner Guides=Text Boundary Outer Guides=Inner Boundary Asteroid Redirect Mission and Human Exploration Michele Gates Human Exploration and Operations Mission.
The Lunar Reconnaissance Orbiter (LRO) is the first mission in NASA's Vision for Space Exploration, a plan to return to the moon and then to travel to.
MSD Project P10236: Versatile Adaptive Controller Project Introduction P10236 Introduction.
Level 1 - LRO Requirements ESMD-RLEP-0010
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
Engineering Design Today’s Objective: Obtain project overview, including dates Get into project groups Become familiar with the first step of the engineering.
1 NASA’s Goddard Space Flight Center 2005/4/14 LRO/CRaTER Technical Interchange Meeting LRO Mechanical Systems Giulio Rosanova / /
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
- Recommendations status - PRR Review report: actions - Conclusion EUSO-BALLOON DESIGN REVIEW, , CNES TOULOUSE Guillaume Prévôt APC, Paris Status.
20a - 1 NASA’s Goddard Space Flight Center Attitude Control System (ACS) Eric Holmes, Code 591 Joe Garrick, Code 595 Jim Simpson, Code 596 NASA/GSFC August.
NASA’s Goddard Space Flight Center Systems Engineering Mike Pryzby Swales Aerospace August 16-17, 2005.
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
Philip Luers NASA/GSFC Code 561 August 16-17, 2005
Space Systems Engineering: Functional Analysis Module Functional Analysis Module Space Systems Engineering, version 1.0.
1 WP4 – System Testbed Trial 2 preparation Barcelona 3/03/05 Marco Bobbio Pallavicini - Carlo Gavazzi Space SpA.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR-01967Section XX 1 GLAST Large Area Telescope: LAT System Engineering WBS Dick Horn.
DINO PDR 23 October 2015 DINO Systems Team Jeff Parker Anthony Lowrey.
Section Number - 1 NASA’s Goddard Space Flight Center Communication Systems Jason A. Soloff NASA/GSFC Code 567 August 16-17, 2005.
Orbital Data Explorer Overview PDS Geosciences March 29 th, 2007 Keith Bennett.
TREADS Semester Review Dec. 14, Objectives Assess and Communicate Current Design Identify interfaces Approve the System Requirement Specification.
LETS Phase 3 Review 4/29/08. Agenda Team Introduction Daedalus Concept Concept of Operations Subsystem Overview Daedalus Performance Daedalus Vision Questions.
1 Lunar Reconnaissance Orbiter (LRO) Overview CRaTER PDR 6/27/2005 Craig Tooley.
24a - 1 NASA’s Goddard Space Flight Center Mission Assurance Ron Kolecki Senior Systems Assurance Manager August 16-17, 2005.
Dr. Richard R. Vondrak Director, Robotic Lunar Exploration Program Science Mission Directorate NASA Headquarters September 2004 NASA Robotic Lunar Exploration.
Communication, Navigation, and Networking reConfigurable Testbed (CoNNeCT): An International Space Station National Lab Ann P. Over Project Manager NASA.
NASA’s Goddard Space Flight Center Lunar Reconnaissance Orbiter Ground System Requirements.
24b - 1 NASA’s Goddard Space Flight Center LRO Safety Dave Bogart Code 302 August 16-17, 2005.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
1 Electrical Systems RLEP Avionics Systems Eng. Philip Luers (301) LRO C&DH Lead Quang H. Nguyen
Educator Resources in Space Sciences Caitlin Nolby North Dakota Space Grant Consortium.
20c - 1 NASA’s Goddard Space Flight Center Propulsion Chuck Zakrwski NASA/GSFC Code 597 August 16-17, 2005.
Proposal of Chandrayaan 1 The main person behind it was Dr. A P J Abdul Kalam Signed up by the then Prime Minister, Atal Bihari Vajpayee in 2003 It took.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
V3 SLAC DOE Program Review Gunther Haller SLAC June 13, 07 (650) SNAP Electronics.
NASA’s Goddard Space Flight Center LRO SRR LRO Mission Level 1 Requirements.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Lunar Surface Atmosphere Spectrometer (LSAS) Objectives: The instrument LSAS is designed to study the composition and structure of the Lunar atmosphere.
1 “Use or disclosure of the data contained on this sheet is subject to the restrictions on the title page.” Proprietary Space Systems/Loral (SS/L) Organization.
ISRO – NASA Space Science Co-operation S.Seetha Programme Director, Space Sciene Programme Office, ISRO HQ & Co-Chair-INMWG Meeting on 24 th Feb 2016 at.
TRIO-CINEMA 1 UCB, 2/08/2010 System Design Dave Curtis UCB/SSL Space Sciences Laboratory University of California, Berkeley.
Lunar Reconnaissance Orbiter (LRO) SRR/Mechanical System August 16-18, 2005
Power Philip Luers NASA/GSFC Code 561 August 16-17, 2005.
Mark Beckman NASA/GSFC Code 595 August 16-17, 2005
NOAA Transition to New Direct Readout Systems for JPSS Presented to CGMS-44 Working Group 1, agenda item 3.2.
Planetary Lander PDR Team Name
CAD/PAD Development Process
Systema V4 Patrick PLECZON
Double Star: Table of Contents
ESMD Space Grant Project
Technical Resource Allocations
Mini-RF Requirements Overview
Peer Review Agenda (Suggested).
TEMPO’s Commercially Hosted Payload Concept
Electrical Ground Support Equipment Verification Test Support
Lunar Reconnaissance Orbiter Camera
Spacecraft Thermal System
Systems Engineering Bob Goeke.
CRaTER Science Requirements
CRaTER Performance Verification
LRO SRR Planned for 8/16-18/2005.
Instrument PDR Summary of Objectives
Arturo Martinez Mark Robinson Mentor Sam Lawrence Project Manager
NASA Satellite Laser Ranging Moblas 4 Monument Peak, CA LRO and HPWREN Scott Wetzel NASA Satellite Laser Ranging Program Near Earth Networks Programs.
Lunar Reconnaissance Orbiter (LRO)
HMI Top Level Requirements
Instrument Overview Larry Springer HMI Program Manager
GLAST Large Area Telescope:
NASA Budget & the Political Process
APOLLO SCENE SETTING.
Presentation transcript:

Lunar Reconnaissance Orbiter (LRO) Mission System Requirements Review (SRR) Mini-RF Requirements Overview Last Update 7/19/05

Mini-RF Introduction Mini-RF is a NASA facility technology demonstration designed to demonstrate new radar technology for future use in planetary resource mapping. The Mini-RF technology demonstration is a synthetic aperture radar which consists of a fixed planar antenna and an electronics box, both mounted on external spacecraft surfaces, a cable harness between the electronics box and the antenna, and electrical interfaces to the spacecraft. The Mini-RF is sponsored by the Naval Air Warface Center/Weapons Division (NAWC/WD), China Lake, California.

Mini-RF Block Diagram

Mini-RF Requirements Traceability (1) Mini-RF Level 2 requirements are defined, and are traceable to a single Level 1 requirement defined in the Lunar Reconnaissance Orbiter (LRO) Requirements Document, #ESMD-RLEP-0010. RLEP-LRO-P160 Technology Demonstration - The LRO shall accommodate the NAWC provided Mini-RF device in order to provide the opportunity for demonstration of this technology in the lunar orbital environment provided it does not increase the project cost, delay the launch date, adversely impact the achievement of full mission success, or increase the overall risk posture of the primary mission. Mini-RF requirements have been captured in a Requirements and Goals Document and are in the process of submission to CM for release

Mini-RF Requirements Traceability (2) Key interface requirements are defined and captured in ICD’s for Mechanical, Thermal, Electrical and Data interfaces Key operational requirements are defined and captured in the LRO Concept of Operations Document Key performance assurance requirements are defined and captured in the RLEP Mission Assurance Requirements (MAR) document, tailored for Mini-RF to include only those areas that may adversely impact the achievement of full mission success or increase the overall risk posture of the primary mission Key verification requirements are defined and captured in LRO Project Level verification documents, including but not limited to: LRO Electrical Systems Specification LRO Mechanical Environments and Verification Requirements LRO Thermal Modeling Requirements Document