Project Scheduling – Critical Path Method (CPM)

Slides:



Advertisements
Similar presentations
PROJECT MANAGEMENT Chu Eu Ho Dept. of Civil and Environmental Engineering Massachusetts Institute of Technology.
Advertisements

USING MS PROJECT Project management software programs such as Microsoft Project can be used to compute the earliest and latest start and finish times and.
PRJ566 Project Planning and Management Lecture: Network Diagrams.
ES=32 EF=34 LS=33 LF=35 ES=10 EF=16 LS=10 LF=16 ES=4+6=10 EF=10 LS=4
CPM, Crashing, Resource Leveling using MS Excel & MS Project
Critical Path Analysis. There are no pre-requisites for this Achievement Standard so it can be placed in any course. No knowledge is pre-supposed.
D1: Critical Events And Critical Paths. D1: Critical Events And Paths A critical path is the list of activities on an activity network that, if they are.
Having Fun with Gantt PERT &.
Project Scheduling Critical Path Method
Construction Planning and Scheduling A G E NG 520 Schedule Computations Part #2 1. Definition and Computation of Total and Free Floats: Total Float : The.
Network planning Learning objectives After these lectures you should be able to: - Produce and analyse activities networks - Calculate earliest and latest.
Precedence Network Calculations the basic information that should be calculated in the precedence network are: 1) Early activity start (ES) 2) Early activity.
Teamwork and Project Management Karl A. Smith University of Minnesota December 2005 Engineers Leadership Institute.
EMGT 501 HW #2 Answer. 020/3 X 3 05/601-1/62/3050/3 X 6 0-5/300-2/3-1/3180/3 (c).3/230with )3/80,0,0,3/50,3/20,0(*)*, ( solution Optimal   Z.
Slide 8.1 4E1 Project Management Network Representation and Critical Path Analysis - Part 1.
Time Management Ahmed Awad, Ph.D., PMP. Time Management It includes the processes required to ensure timely completion of the project. b Activity Definition.
Scheduling CTC-415. Activity Network Development Network Models Activity on Node Precedence Diagram Method Activity on Arrow Network Characteristics Discrete.
USING MS PROJECT Project management software programs such as Microsoft Project can be used for developing the project schedule We demonstrate the use.
Project Management CPM, PERT, Crashing – An Illustrative Example
USING MS PROJECT 2010 Project management software programs such as Microsoft Project 2010 can be used for developing the project schedule and budget, and.
The Critical Path – Precedence diagram method Luise Lorenz Christina Mohr.
Amin Salari, CCM, PMP, LEED AP – Lundgren Management
MARIAN BROTHERS- YUMBE(UGANDA) Construction of toilets, kitchen and renovation of library for Immaculate Heart Secondary School Yumbe- Uganda.
Project Management Karl A. Smith University of Minnesota ISE 5101 Fall, 2001.
Project Management MOT 8221 Karl A. Smith University of Minnesota Spring, 2002.
Project Management Karl A. Smith University of Minnesota ISE 5101 September 28, 2001.
© Construction Management Association of America. Do Not Duplicate or Reproduce. Standards of Practice Course CPM Scheduling Lab.
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
Project Management - PERT/CPM What is project management? Consider building a house: Step A: Prepare site. (5 days) Step B: Build foundation. (8 days)
EGR Project Management Planning Techniques Project manager responsible for developing project implementation plan. Duties includes: Defining.
P ROJECT M ANAGEMENT. Case study Assumptions Methodology Discussion.
PRJ566 Project Planning & Management Dependencies, Network Diagrams & Critical Path.
Project Management Planning Techniques
Dependencies and Network Diagrams. Agenda Dependencies Milestones The Network Early/Late Start/End dates Slack/Float Critical Path.
1 Planning Change. Painting a Room Select paint 10 days Sand and clean walls 3 days Buy painting supplies 1 day Buy paint 1 day 1 st coat 1 day 2 nd coat.
1 Schedule Control with Microsoft Project 2003 P roject M anagement M ethodologies Laura Williams, PMP.
Project Modelling The success of the whole planning and control function depends on the project planner being able to define the project’s full scope of.
Scheduling Scheduling : is the process of converting a project action plan into an operating time table. Why scheduling ? To answer the following questions:
MICROSOFT PROJECT MODULE 2 - BUILD A HOUSE.
Network Diagram Prob 1 Activity Predecessor Duration (days) A None 2 B
Project Management MGT 30725
RESOURCE SCHEDULING references:
UNIT II Scheduling Procedures & Techniques FLOAT
Activity networks – Example 1
RESOURCE SCHEDULING references:
RESOURCE SCHEDULING references:
RESOURCE SCHEDULING references:
Time Planning and Control Activity on Node Network (AON)
RESOURCE SCHEDULING references:
RESOURCE SCHEDULING references:
Project Time Management.
Project Management CPM Method Tutorial-p2
How to perform Time Impact Analysis / Window Analysis in Primavera P6
Project Management CPM Method Tutorial-p1
Project Time Management
1 Total Slack A 3d Task Early Start Late Start Early Finish
Nuffield Free-Standing Mathematics Activity Refurbishing a room
مدیریت عمومی دانش کهن. مدیریت عمومی دانش کهن ارایه تحقیق پایان ترم 3 نمره امتحان پایان ترم 10 نمره ارایه تکالیف کلاس 2 نمره امتحانات.
Time Planning and Control Activity on Node Network (AON)
Project Time Management
LECTURE 2.
Project Modelling The success of the whole planning and control function depends on the project planner being able to define the project’s full scope of.
In-Class Scheduling Exercise
LECTURE 3.
Project Time Management
Project Time Management
Exercise – A small building.
Operations Research Lecture 9.
Operations Research Lecture 7.
Project Time Management
Presentation transcript:

Project Scheduling – Critical Path Method (CPM) Bus Shelter Construction Example Job Name Duration Resources Predecessor(s) 1 Shelter Slab 2 2 5 2 Shelter Walls 1 1 1 3 Shelter Roof 2 2 2,4 4 Roof Beam 3 2 2 5 Excavation 2 3 6 Curb and Gutter 2 3 5 7 Shelter Seat 1 2 4,6 8 Paint 1 1 7 9 Signwork 1 2 2,6

Bus Shelter Construction Critical Path Method Results ACT NAME DUR RES EARLY LATE FLOAT CUR CRIT start PATH ST FN ST FN TOT FREE 1 Shelter Slab 2 2 2 4 2 4 2 YES 2 Shelter Walls 1 1 4 5 4 5 4 YES 3 Shelter Roof 2 2 8 10 8 10 8 YES 4 Roof Beam 3 2 5 8 5 8 5 YES 5 Excavation 2 3 2 2 YES 6 Curb and 2 3 2 4 6 8 4 1 2 NO Gutter 7 Shelter Seat 1 2 8 9 8 9 8 YES 8 Paint 1 1 9 10 9 10 9 YES 9 Signwork 1 2 5 6 9 10 4 4 5 NO