Problem 4.3 (a) The network of the Deluxe model

Slides:



Advertisements
Similar presentations
Cellular Networks.
Advertisements

SubAir Unit location The first step to installing a SubAir System is to select a suitable location for the unit. The ideal location minimizes any disruption.
1 4. Flow-Time Analysis Inventory adversely affects all competing edges (P/Q/V/D)  Has cost  Physical carrying costs  Financial costs  Causes obsolescence.
Lean Operations (JIT) Module
Q4 – What criteria can you use for comparing WANs? Group B Claudia Murcia MGS
A network is shown, with a flow f. v u 6,2 2,2 4,1 5,3 2,1 3,2 5,1 4,1 3,3 Is f a maximum flow? (a) Yes (b) No (c) I have absolutely no idea a b c d.
Structure and Synthesis of Process Flow Diagrams ENCH 430 July 16, 2015 By: Michael Hickey.
Turning Grinding Sawing Milling Drilling & Deburring Prep Inspect Ship.
1-1 1 Chapter 7 Manufacturing Processes Process Flow Structures Job shop (ex. Copy center making a single copy of a student term paper) Batch shop.
The minimum cost flow problem. Simplifying assumptions Network is connected (as an undirected graph). – We can consider each connected component separately.
4. Flow-Time Analysis Flow Time 1-Introduction Based on the book: Managing Business Process Flows.
River Basins The area of land drained by a river and its tributaries is called a river or drainage basin. One river basin is separated from another by.
ENGM 732 Formalization of Network Flows Network Flow Models.
Networks of Best Practice for Sustainable Energy Development in the Asia-Pacific Region.
Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin Chapter 25 Managerial Accounting Concepts and Principles.
Working fields for EWCs trainers’ workshop Bad Orb, March 2012.
Chapter 1. Learning Objective I can define economics and understand what causes the study of economics to exist.
VIVID Project Attacking plan. Problems Description What we have? – Map(? ) – Satellite Imagery – Aerial Video and Mosaic Images Target – Road, building,
Bamboo Roofing Sheets.
“Going With The Flow” By Carol Moore
What have we modeled? Is it unstable? e.g. processor sharing when ρ>1 If the system is unstable then it’s useless to take measurements; we need to think.
Food chains and Food Webs
How a Stateful Firewall Works
Name _____________________
Block Assembly (not shown)
BEST DRAINAGE SOLUTIONS FOR A FLAT ROOF By: ACCENT ROOFING AND CONSTRUCTION
GemBox.Presentation GemBox.Presentation is a.NET component which enables developers to read and write presentation files from.NET applications in a simple.
MBPF Inc.: Consolidated Income Statement
Dijkstra’s Algorithm with two levels of buckets
קורס פיננסי – מושגים פיננסיים / כלכליים
Example of a CAN Last Update
15.082J & 6.855J & ESD.78J Visualizations
15.082J & 6.855J & ESD.78J Visualizations
Current Electricity Sections 12.1, 12.2, 12.3, 12.4.
Unit Time 8/24/04 Paul A. Jensen
Breadth first search animation
Facilities and Layout Planning
Introduction to Minimum Cost Flows
ELECTRICAL CIRCUITS AND CONSTRUCTIONS An electrical circuit is a network consisting of a closed loop, giving a return path for the current 2.
AIRnet Valves D83 to D158 What to order
Spanning Tree Algorithms
and 6.855J Flow Decomposition
Successive Shortest Path Algorithm
A presentation by Math Doodles
Manufacturing Production Planning
15.082J & 6.855J & ESD.78J Radix Heap Animation
Network Optimization Depth First Search
Dijkstra’s Algorithm for Shortest Paths
Roof Girder Load Combinations
Assignment Capacity The recorded solution to the first problem is available at
Network Optimization Topological Ordering
and 6.855J The Goldberg-Tarjan Preflow Push Algorithm for the Maximum Flow Problem Obtain a network, and use the same network to illustrate the.
and 6.855J Dijkstra’s Algorithm
Visualizations Dijkstra’s Algorithm
Introduction to Maximum Flows
and 6.855J The Goldberg-Tarjan Preflow Push Algorithm for the Maximum Flow Problem Obtain a network, and use the same network to illustrate the.
Eulerian Cycles in directed graphs
and 6.855J Topological Ordering
PSALM 1.6 Certainly the Lord guards the way of the godly,
15.082J & 6.855J & ESD.78J Visualizations
U Layered Architecture M There are up-calls and down-calls. L.
and 6.855J Depth First Search
Breadth first search animation
Feeding Relationships
دکتر سید مجید اسما عیل زاده
Introduction to Maximum Flows
Welcome to the Hershey's Factory.
Assembly used to convert a standard ventilator to an intermittent mandatory ventilation circuit. Assembly used to convert a standard ventilator to an intermittent.
15.082J & 6.855J & ESD.78J Visualizations
Presentation transcript:

Problem 4.3 (a) The network of the Deluxe model 45 6 18 Punch (base) Form (base) S_assemble (base) 10 12 36 Start Separate Assemble Inspect 30 12 Punch (roof) Form (roof) TFT_Deluxe_Path1 = 10+45+6+18+12+36 = 127

Problem 4.3(b) TFT for 25% Deluxe and 75% standard 33.75 6 14.25 Punch (base) Form (base) S_assemble (base) 10 10.5 36 Start Separate Assemble Inspect 24 12 Punch (roof) Form (roof) TFT_Deluxe_Path1 = 10+33.75+6+14.25+10.5+36 = 110.5 The flow time efficiency is 110.5/4800 = 2.3%

Problem 4.3 (alternative way for part b using the network of the Standard model) The network of the Standard model is as follows 30 6 13 Punch (base) Form (base) S_assemble (base) 10 10 36 Start Separate Assemble Inspect 22 12 Punch (roof) Form (roof) TFT_Standard_path1 = 10+30+6+13+10+36 = 105 TFT_Deluxe = 127 0.75×105+0.25×127 = 110.5