Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006

Slides:



Advertisements
Similar presentations
Richard M. Boyce FAC Review – Accelerator Installation October 29-31, Installation – Accelerator Systems Installation Planning.
Advertisements

Eric Bong LCLS FAC Injector-Linac April 7, 2005 LCLS Injector/Linac Systems Update E. Bong LCLS FAC April 7, 2005 LCLS.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
FAC, 4/20/06 D. Schultz 1 e-Beams System Update Linac System Preparing for downtime installation. Injector System Installation has started. Undulator System.
Paul Emma LCLS FAC April 16, Initial Experience with Injector Commissioning P. Emma, et al. Facilities Advisory Committee.
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
John N. Galayda LCLS FAC 20 April Linac Coherent Light Source Overview and Charge Facility Advisory Committee John.
Eric Bong LCLS FAC Injector-Linac October 27, 2005 Injector Design / Diagnostics / Gun & Linac RF Design E. Bong LCLS FAC.
FAC, 4/16/07 D. Schultz 1 e-Beams Systems Update People ARR Linac Installation Undulator Production MMF Operations David Schultz.
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
D. Schultz FAC 6/17/08 1 e-Beams Systems Update People Progress the last review LTU and Dump Installation Status Undulator.
Eric Bong LCLS FAC Injector-Linac System October 27, 2005 Injector –Linac System Overview E. Bong LCLS FAC October 27, 2005.
Jose Chan FAC Review- Injector Laser Heater 6/16/08 1 Injector Laser Heater Undulator Jose Chan.
E. Bong, SLACLCLS FAC Meeting - April 29, 2004 Linac Overview E. Bong LCLS FAC Meeting April 29, 2004 LCLS.
David H. Dowell Injector April 29-30, 2004 LCLS Injector Overview D. H. Dowell, SLAC FAC Review April 29-30, 2004 Injector.
Hamid Shoaee LCLS FAC Review – October Control System Overview Hamid Shoaee Controls System Manager Injector control system commissioning & Support.
C.E. Rago Inj/Lin Design & 4_20_06 1 Injector / Linac Design & Fabrication C.E. Rago FAC Review 04_20_06.
David H. Dowell Injector Physics/Diagnostics/Gun&L0 RF April 29-30, 2004 Injector Physics / Diagnostics / Gun & L0 Linac.
FAC, 10/12/06 D. Schultz 1 Readiness for 2007 Startup Linac Injector Controls ARR David Schultz.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
Injector Accelerator Readiness Review, 10/31/06 Henrik Loos 1 Beam Losses During LCLS Injector Phase-1 Operation Scope of phase 1 operation Operating modes.
LCLS Accelerator SLAC linac tunnel research yard Linac-0 L =6 m Linac-1 L  9 m  rf   25° Linac-2 L  330 m  rf   41° Linac-3 L  550 m  rf  0°
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
PAL-XFEL Commissioning Plan ver. 1.1, August 2015 PAL-XFEL Beam Dynamics Group.
CLEX* Status and Plans CTF3 complex CLEX
Thermal emittance measurement Gun Spectrometer
Injector Performance Requirements Conventional Facilities Update
Revised Commissioning Strategy
LCLS Injector: Introduction D. H
LCLS Linac Update Brief Overview L1 & BC1 Progress LTU & E-Dump Status Continuing Resolution Impact.
LCLS Gun Commissioning Status & Plans David H
Injector/BC1 Commissioning (Jan. 2, 2007 through Aug. 31, 2007) P
LCLS Injector Commissioning Dates ( )
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
ATF project meeting, Feb KEK, Junji Urakawa Contents :
e-Beams Systems Update
Linac/BC1 Commissioning P
Electron Beam Systems ETC and Methodology
Injector / Linac Installation Current Status
LCLS Linac Overview E. Bong Lehman Review August 10, 2004
Linac (WBS 1.2.2) Vinod Bharadwaj April 23, 2002
LCLS Commissioning P. Emma, et al
INJECTOR (WBS 1.2.1) Jym Clendenin, SLAC April 23, 2002
Linac Physics, Diagnostics, and Commissioning Strategy P
Electron Beam Systems Wrap-up
Maximum Credible Beam Event Paul Emma et al
LCLS Injector/Diagnostics David H. Dowell, SLAC April 24, 2002
Linac Diagnostics Commissioning Experience
Operational Experience with LCLS RF systems
LCLS Injector Commissioning P
2007 Downtime Controls Installation
LCLS Injector Configuration
LCLS Personnel Protection System and Beam Containment System
E-Beams Systems Manager
LCLS Injector System Overview D. H
Control System Overview Hamid Shoaee LCLS Control System Manager
Diagnostics overview Beam profile monitors Cherenkov radiators Summary
Electron Beam Systems ETC and Methodology
Linac Design Update P. Emma LCLS DOE Review May 11, 2005 LCLS.
Injector/Linac Design Status C. E
LCLS e- Beams System Overview
e-Beams Systems Update
LINAC System Engineering / Design Status C.E. Rago
LCLS Control System Personnel Linac & BC2 Controls progress
Injector Physics C.Limborg-Deprey Feb.8th 2006
DOE Status Meeting of the LCLS Project
LCLS e- Beams Systems Manager
Injector/Linac RF Status
Control System Overview Hamid Shoaee LCLS Control System Manager
Presentation transcript:

Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006

Injector - Linac Status & Schedule 2006 Installation Status (C. Rago) Injector & Linac 2007 Schedule 2007 Installations 2007 Engineering Effort

FAC Report April 2006 Installation priorities are based on the hardware required for installation within the linac tunnel during the current shutdown. Installation of components outside the linac tunnel may be accomplished after the shutdown, with minimal impact on operations. While the prioritization introduces some delay in readiness of the injector, the overall philosophy followed by LCLS appears to be sound. Delayed design and fabrication of some Injector components to accelerate Linac device design and fabrication. The FAC encourages the LCLS management to provide sufficient resources to avoid compromising injector readiness for commissioning, e.g. installation of LCW in the injector region is not yet fully planned and there is potential for problems that may be encountered causing delays. Also, the photocathode laser installation schedule is tight and attention should be given to its readiness with at least the minimal required laser systems performance for initial gun tests with beam. Injector/Linac managed to secure short term design and engineering support from outside contracts and SLAC matrixed manpower.

2006 Injector Installation Drive Laser Installed Laser Launch Follows GTL Gun Region Accel Region Heater Region 2007 Down Wall Region Injection Region 2006 Down Spect Region 2006 Down Gun installation Follows Hot Test in Klystron Lab & GTL Fabrication of Injector Vault components slipped in order to support Linac Housing Installation Insertion/SAB Chambers Late Waveguide through wall and up penetration Done Priority – Linac Housing Installation

2006 Linac Installation Accelerator Sections Removed Linac 1 (L1) LX Bunch Compressor 1 (BC1) Two short accelerator structures, refurbished Quads+BPMs,X&YCOR X-Band Structure (NLC) Quad + BPM, YCOR,XCOR, QE, Toroid Bunch Compressor & Diagnostics Emittance Diagnostics. Electrons Remove 5 S-Band Structures Accelerator Sections Removed BC1 Bend Magnet Field Issues Most Components Fabricated Spools For Late Components Need Installation Opportunities For Late Components

Injector and Linac Installation Dates Linac Down: August – November 2006 September - November 2007 RF Gun Dec 2006 rf gun Linac-X Aug-Nov 2006 E-Dump Nov 2007 Feb 2008 L0a&b Linac-1 Aug-Nov 2006 Linac-2 Sep-Nov 2007 Linac-3 Sep-Nov 2007 Inj Vault Jun-Dec 2006 undulator SLAC linac 21-1b 21-1d X 21-3b 24-6d 25-1a 30-8c BC-1 Aug- Nov 2006 BC-2 Sep-Nov 2007 DL-1 Aug-Nov 2006 LTU Nov 2007 Feb 2008 SLAC linac tunnel research yard Installation in SLAC Linac tunnel only during down-time Forces priority to components and systems in Linac housing (RF phase: frf = 0 is at accelerating crest)

2007 Injector Installation Remaining 2006 devices (ROD) Cathode Replacement Laser Heater Installation Design Feasibility Done Bend Magnets Ordered Vacuum Chambers (Rough Concept) OTRs (Modification for Location) Laser Transport & Optics (Basic Layout) Undulator (Initial Design)

Injector Heater Region Design Floor Supports Received Temporary Chamber Done Quads Done Bends on Order Initial Chicane/Optics Layout Done Need to Complete Final Optics Optics Enclosure Optics Transport OTR Designs Undulator Design

2007 Linac Installation L2, BC2, L3, BSY (September 2007) Chicane Articulation LTU (November 2007) Single Beam Dump Spot Shielding Quad Vibration E-Dump (November 2007) Radiation Shielding/CF Interface Dump Magnets & Chamber

Linac Li20-30 Design Status L2& L3 Layout Resumed Near to PDR Wire Scanners & T-Cav Move BC2 Layout Started Articulation Engineering BSY Work Not Started – Quad install

Beamline Layout - Ongoing Vibration Issues – Support Design LTU Design Status Beamline Layout - Ongoing Vibration Issues – Support Design CF Interface – Ongoing – Penetrations Penetrations – Water, BTH-West Support Building Power Component Challenges Single Beam Dump Cold Trap – BSY Contamination Undulator Interface

LTU Design Status Beamline Layout - Ongoing Radiation & CF Interface Well & Pit Locations Safety Dump Specification Component Challenges Dump Bends & Chambers BCS & Radiation Driven Design Undulator Interface X-TOD Interface Pit & Well Component Supports

2006 Priorities (Inj Vault/Linac Housing) Conclusion 2006 Priorities (Inj Vault/Linac Housing) Consequence Delay Slips Commissioning Minimum Impact CD4 2007 Engineering & Design L2, BC2, L3, BSY LTU E-Dump Radiation Driven Design Challenges