Wave of the Future Trendy Novelty?

Slides:



Advertisements
Similar presentations
Gordons Corner Road Over US Route 9 Mahesh Patel, P.E. George Afful, P.E. Gregory Bitsko, P.E.
Advertisements

New York State Department of Transportation Region 11 Reconstruction of Jamaica Avenue Bridge over I-678 Van Wyck Expressway The Roll-in/Roll Out Method.
Work Zone Safety Using Accelerated Bridge Construction (ABC) Rukhsana Lindsey, UDOT Presented by Jim McMinimee Principal Engineer, Applied Research Associates.
ACCELERATED BRIDGE CONSTRUCTION (ABC): THE KEYS TO SUCCESS FROM AN OWNERS PERSPECTIVE Presented by James McMinimee, P.E., P.S.E. UDOT Chief Engineer, Director.
is a mobile protective steel barrier in a modular design.
Chp12- Footings.
 Modular Installation AMARCO MODULAR. Custom Modular Designer & Manufacturer. AMARCO means a ‘BEAUTIFUL PLACE’. When I decided on the name of the business.
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Chapter 34 Bridge Construction.
PREFABRICATED BRIDGE ELEMENTS & SYSTEMS (PBES), DECISION- MAKING FRAMEWORK Claude Napier Sr. Structural Engineer Resource Center - Structures TST.
Connection Details for Prefabricated Bridge Elements and Systems
Research Advisory Committee Annual Meeting FHWA Briefing Michael Trentacoste Associated Administrator Research, Development, & Technology Director, Turner.
 Project Delivery  Design Considerations  Lessons Learned.
Module 1 What are Prefabricated Bridge Elements & Systems for Accelerated Bridge Construction (ABC/PBES)? Module 1 What are Prefabricated Bridge Elements.
M AKE E VERY DAY COUNT A CCELERATING B RIDGE C ONSTRUCTION WITH P REFABRICATED B RIDGE E LEMENTS & S YSTEMS.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
MaSSENA LATERAL BRIDGE SLIDE CASE STUDY
Topic 7: Timber Subfloor Systems – Basic
1 Building and Maintaining Information Systems. 2 Opening Case: Yahoo! Store Allows small businesses to create their own online store – No programming.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Page 1 MINISTRY OF TRANSPORTATION Cyrville Road Bridge Replacement at Highway 417 (Ottawa Queensway) Detail Design Study Group Work Project
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
1 P H I L L I P S T O N Route 2 Over Route 2A SPMT Heavy Lift September 8, 2015| Leading the Nation in Transportation Excellence |
SHRP 2 - FIRST DEMO PROJECT KEG CREEK, IOWA R04 – “BRIDGE DESIGNS FOR RAPID RENEWAL” Sandra Larson, P.E. Iowa Department of Transportation Research and.
Transportation Management Plan Overview. TMP Overview2 Is that the impression people have?
ABC POLICY DEVELOPMENT IOWA DOT Norman McDonald, PE Iowa Department of Transportation Office of Bridges and Structures MID-CONTINENT TRANSPORTATION RESEARCH.
International Partnership Day.  An SPMT is used for transporting massive structures that are too large or heavy for normal trucks  The SPMT consists.
“Get in, do it right, get out, and stay out.”
Materials, Pavements & Transportation Operations CONCEPTS FOR ENHANCING THE EFFECTIVENESS OF TRAFFIC CONTROL PLANS Stuart Anderson Gerald Ullman Making.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Rapid Bridge Construction: Prefabricated Substructure Elements AASHTO RAC High Value Research Workshop July 27, 2011.
A CCELERATING B RIDGE C ONSTRUCTION (ABC) WITH P REFABRICATED B RIDGE E LEMENTS & S YSTEMS (PBES)
. Client: City of Pittsburgh, Brighton Heights Community Objectives : Develop a pedestrian/bicycle bridge reconnecting Brighton Heights to Riverview park.
Project Stakeholder Integration in Off-Site Construction May 24, 2016 Partners in Progress.
LOI # Pilot Program Design & Related Services for Development of Accelerated Bridge Construction Standards & Pilot Bridge Construction.
Helping everyone understand how to play their part.
Portable Cabins Sean Jordan Cabins has established itself as a market leader in the production of premium quality, multi-purpose Cabins offering advanced.
Managing Response Rates
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
STRATEGIC ACADEMIC UNIT “PEOPLE & TECHNOLOGIES”
INNOVATION AS A MANAGEMENT PROCESS INNOVATION & TECHNOLOGY MANAGEMENT
Bridging the Gap in Bridge Construction Impacts
INSPECTION POLICIES AND, PROCEDURES CLASS A CERTIFICATION REQUIREMNTS
Project Purpose and Objective
Aaron Crowley, Ph.D. KSWA Travis Smith, P.E. TDOT Biloxi, Mississippi
Presented by Munezero Immaculee Joselyne PhD in Software Engineering
New Bridge Construction
Sandra Larson, P.E. Iowa Department of Transportation
Traffic Control Plan Development Course
Overcoming Barriers to Implement Research Projects
All About Business Phone Systems
Introduction to Configuration Management
Methodologies For Systems Analysis.
Methodologies For Systems Analysis.
Using CMF’s in Benefit/Cost Analysis and Project Prioritization
CIVIL WORKS CONSTRUCTION TECHNOLOGY 2017/18
RAD-IT Tool Training June 2017 RAD-IT Tool Training
Kathy Harvey, P.E. State Design Engineer Missouri DOT
Windshield and Walking Surveys
How to Prepare a Financial Plan FINANCIAL PLANNING PRESENTATION.
How To Get Introduction To 12 Month Installment Loans Online – 2019?
UNIT 5 EMBEDDED SYSTEM DEVELOPMENT
HERO UNIT Training Module
UNIT 5 EMBEDDED SYSTEM DEVELOPMENT
Materials Innovation Hub Challenge Martin Richardson
Applying Use Cases (Chapters 25,26)
UNDERWATER GLIDERS.
WisTMP 2.0 Update Andy Heidtke, PE Statewide Work Zone Design Engineer
Title of Presentation dd.mm.yyyy 2-in-1 Product Solution Temporary & permanent application with one product DELTA BLOC - We develop.
Presentation transcript:

Wave of the Future Trendy Novelty? Accelerated Bridge Construction in Alabama: Wave of the Future or Trendy Novelty? With today’s presentation I plan to explain ABC, show some examples others have done, and touch on the future of ABC in Alabama.

Accelerated Bridge Construction - innovative planning, design, materials, construction methods safe and cost-effective reduce the onsite construction time Accelerated bridge construction is using innovation in planning, design, materials, and construction methods that are project enhancing, that is, provides a safer construction zone with financial benefits as well as shortening the time roadway users are affected by construction activities.

Why Accelerated Bridge Construction? Rehabilitate / Replace Existing Structures Common Practices: Detour Temporary Bridge Stage Construction All this begs the question, “Why ABC?” Well, the nation’s highway bridge system was for the most part completed some time ago. Since that time traffic volumes have increased, load calculations have been modified, and structures built some time ago have reached the end of their structural and/or functional life. As a result, many structures are undergoing rehabilitation and/or replacement. Currently we use different strategies to deal with these structures, among which are off-site detours, on-site detours or temporary bridges, and stage construction. Each of these is intended to allow traffic to continue to flow, albeit with some restriction, while a rehab or replacement is underway.

BUT . . . ABC is NOT the answer for all projects! However, ABC is not universally applicable. There is a process for determining which structures or locations would be best suited to ABC, which I will touch on later.

ABC under EDC2 : Geosynthetic Reinforced Soil – Integrated Bridge System (GRS-IBS), Prefabricated Bridge Elements and Systems (PBES), Slide-In Bridge Construction There are 3 ABC innovations the Feds are currently encouraging. Those being GRS-IBS, Prefab bridge elements, and slide or roll in bridge construction. There is a GRS-IBS project being hosted by Marshall County. Alabama already has experience with pre-fab elements as most of our county bridges are almost completely pre-fab. Also, let’s not forget the I-10 bridge over Mobile Bay, a photo of which is the predominant background of this presentation. It was built with pre-fab superstructures. Bridge sliding or rolling, however, appears to be a new technology that has the potential to improve the safety at the construction site, improve our image among the traveling public, and save us money in the long haul. ALDOT currently has projects in pre-fab elements and bridge sliding.

Prefabricated Bridge Elements and Systems Built offsite Controlled environment Proper curing Time in work zone Site / Environmental impact I’ll start by introducing Prefabricated bridge elements and systems. These are bridge components or entire bridges built offsite and transported for quick installation. They offer a number of advantages over cast–in–place bridge construction. For instance, they can be built offsite while earthwork and foundation construction is underway, shortening onsite construction time that impacts traffic from months to days or hours. They’re manufactured in a controlled environment where the use of consistent materials and methods contributes to uniform quality in the end product. Flexible start times for manufacturing components ensures adequate time for proper concrete curing for good long–term performance. Less time in the work zone reduces safety risks,. PBES construction also offers to minimize site impact, a necessity when working over wetlands or other environmentally sensitive locations.

Prefabricated Bridge Elements Prefabricated bridge elements include . . .

Partial and Full ̶ Depth Deck Panels

Pier Caps . . . pier caps . . .

Columns . . . columns . . .

. . . and footings. Footings

Prefabricated Bridge Systems Complete superstructure Complete substructure Entire bridge Prefabricated bridge systems include complete superstructures, complete substructures, and entire bridges.

This is a bridge superstructure being moved in Utah This is a bridge superstructure being moved in Utah. They’re using SPMTs, or Self-Propelled Modular Transports. A Self-Propelled Modular Transporter is a combination of multi-axle platforms operated through a state-of-the-art computer-controlled system that is capable of pivoting 360 degrees as needed to lift, carry, and set very large and heavy loads of many types including bridges,

Space shuttles . . .

And the occasional freighter laying around that needs dusting underneath.

Minnesota DOT – Maryland Avenue Bridge Move using Self-Propelled Modular Transports Here are two videos showing how Self-Propelled Modular Transports are being used to install complete bridge superstructures. Both videos are about the same bridge move. The first is a time-lapse video, so you’ll have to watch closely.

Slide In Bridge Construction New bridge on falsework (existing traffic uninterrupted) When all elements completed Road closed (a week or less) Existing bridge removed New bridge moves into place On a slide project, a new bridge is built on temporary supports, usually parallel to an existing bridge. During construction, traffic continues uninterrupted on the existing structure. When construction is completed, the road is closed temporarily. The existing structure is demolished and removed and the new bridge is positioned ("slid or rolled") into place and tied into the approaches, generally within 72 hours.

Michigan Route 50 Bridge Slide This is a video of a bridge slide that happened in Michigan last October.

NV Mesquite Jack Operation This is a video showing one method to move a bridge. The video begins at the end of a push cycle. Once checks are made to ensure equal progress, the push jack is re-set by pulling itself forward to the next set of slots. Once set, the operator again checks to ensure all systems are synchronized and then reverses the jack operation to push the bridge again continues its trek toward its final destination.

Madison Milton Bridge Slide On April 10, 2014, the slide of the Milton-Madison Bridge was completed. At nearly a half-mile long, this is the longest bridge slide of its type in North America, perhaps the world. The slide occurred over a two day period with the actual slide time being approximately 12 1/2 hours. The total slide distance was 55 feet,

Wave of the Future Trendy Novelty? or Recall at the outset I posed the question as to whether ABC is the future for ALDOT or just a novelty. Well, in order for it to become a regular activity there must be . . .

Necessary For ABC: ü Technology Transfer Bridge selection tool Institutional Commitment ? - TBD . . . the transfer of ABC technology, ● which is happening, ● a tool for deciding which projects would benefit from ABC . . . ● which needs to be developed. Let me pause here to say that currently the selection method consists of a bridge engineer looking at a set of bridge plans and doing a cost analysis on what’s currently proposed as well as an ABC alternative. If it appears the ABC alternative is feasible and cost effective, a proposal is then made to the Region Engineer and his staff to decide whether to move forward with that proposal or not. This is not a practical or sustainable practice simply because in order for ABC to become SOP, there needs to be . . . ● a commitment to that practice by the institution. This is because real innovation involves people in nearly every aspect of project and plan development, from the Director to the administrator in Transportation Planning to the engineers in Design and M&T to the plan detailer in Bridge. This is simply because real innovation is more than a fancy new way to build a bridge. ABC is just one spoke on the wheel of transportation innovation. When and if ALDOT adopts that mindset, then we will see these and other creative methods of project development become a regular part of our work.

For instance, this is a diagram of the ABC selection tool used by the Utah DOT, probably the most ABC developed state in the nation. It took them time and a lot of experience to develop this flowchart, but they have successfully done so. I know this chart isn’t legible and for this example it doesn’t have to be. Rather what this chart shows is that innovation is not limited to any particular bureau, but is instead a department wide effort. Hopefully someday Alabama will be featured somewhere for our advances in transportation innovation. Thank you very much.