Panel Sessions 7 & 8 WRC-15 Agenda items 7 & 9.1 issues (9.1.2, 9.1.3, 9.1.5, 9.1.8) Khalid Al Awadhi.

Slides:



Advertisements
Similar presentations
RADIOCOMMUNICATION BUREAU BROADCASTING-SATELLITE SERVICE PLANS AND LISTS by Mark Griffin BR/SSD/SNP.
Advertisements

1 Some important points on Regulatory Issues discussed at the second meeting of the Sub- working Group of RPG 1.Regulatory text for the new regional Agreement.
WRC-07 Workshop Select Critical Issues with a Commercial Sector Focus Jennifer A. Manner Mobile Satellite Ventures USITUA WRC Seminar September 19, 2007.
WRC–12 Industry Debrief 23 April 2012 Agenda item 7 – Satellite Procedures Presenter: Paul Burford.
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.13 – BSS and feeder links 21.4–22 GHz Presenter: Geoff McMillen.
AGENDA ITEM 1.1 To consider additional spectrum allocations to the mobile service on a primary basis and identification of additional frequency bands for.
WMO Workshop on Radio Frequencies for Meteorology Meteorological Satellite Services David F. McGinnis U.S. Dept. of Commerce, NOAA 7 October 2002 Geneva,
Radio Regulations Rights & obligations + applicable procedures Two mechanisms of sharing orbit / spectrum: Coordination Approach Efficiency First come,
How is Technical & Regulatory Examination carried out in the BR - a detailed view.
Providing Useful Regulatory Solutions T T & C Telecommunication Regulatory Consultants Shayla E. Taylor TT&C USITUA WRC Seminar September 19, 2007.
Nairobi, Kenya September 2007 Preparations for WRC-07 Overview of Regional and National proposals as of 13 September 2007 Presented by Robert Witzen.
CEPT preparations status for WRC-15 Mr. Per Christensen (ECO Director) August 2015 The second Annual Middle East & North Africa Spectrum Management Conference,
WRC–12 Industry Debrief 23 April 2012 Agenda item 1.20 – High Altitude Platform Stations (HAPS) Presenter: Dick Butler.
WRC–12 Industry Debrief 23 April 2012 Agenda Items 1.1 Deletion of country footnotes 2 Incorporation by Reference 4 Review of ITU-R Resolutions and Recommendations.
1 Improving the Radio Regulations, Prospective WRC (WRC-15) Agenda Items Per Hovstad, Principal Spectrum Engineer Asia Satellite Telecommunications Co.
John Taylor ICAO Preparatory Spectrum Seminar for WRC-15 Thailand March 11-12, 2014 WRC-15 Agenda Item
WRC–12 Industry Debrief 23 April 2012 Agenda item 8.2 – Future WRC Agendas.
1. 2 Notification of frequency Assignments for recording in the Master Register Prepared by : Eng.yasir Mohammed Bashar
Role of World Radiocommunications Conference and European preparations for WRC Stella Lyubchenko 4 th CEPT Workshop on European Spectrum Management and.
International Telecommunication Union Document WRC-15-IRWSP-15/16-E 1 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
National Preparatory Working Group meeting for World Radio-communications Conference 2015 Aeronautical Agenda Item 1.7 Presented by Takalani Tshikalaha.
Agenda item Allocation to the Fixed- Satellite Service in the 7 ‑ 8 GHz range Presenter: Carol Wilson (Coordinator: Kevin Knights)
Agenda item 9.2 On any difficulties or inconsistencies encountered in the application of the Radio Regulations (non-ESOMPS)
Agenda item 1.16 VHF data exchange system (VDES).
Decisions of RA-15 and WRC-15 with Special Relevance to Developing Countries Решения AR-15 и ВКР-15 в особенности касающиеся развивающихся стран Иштван.
CRAF POSITION ON WRC-19 AGENDA ITEMS RELEVANT TO RADIO ASTRONOMY Talayeh Hezareh - CRAF FM Max Planck Institute for Radio astronomy Bonn, Germany MAY 20,
International Telecommunication Union Document WRC-15-IRWSP-15/8-E 3 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
International Telecommunication Union Document WRC-15-IRWSP-15/14-E 1 September 2015 English only 3 rd ITU INTER-REGIONAL WORKSHOP ON WRC-15 PREPARATION.
CEPT Conference Preparatory Group
ICAO Position for ITU WRC-15
broadband applications, in accordance with Resolution 233 (WRC-12)
Non Planned Space Services (Coordination and Notification procedures)
WRC-12 A.I. 1.7 Eric ALLAIX DGAC-DSNA.
Cindy Cook Chairman, TG 5/1 November 2, 2016
Panel Session 2 WRC-15 Agenda items 1.16, 1.4, 1.15
SADC 5th WRC-15 Preparatory Meeting, Gabarone, Botswana September 2015
Regional Commonwealth in the field of Communications
SADC WRC-15 Preparatory Meeting
As of 20th Meeting, Rabat, Morocco: August 2015
ICAO Position for ITU WRC-15
SADC WRC-15 Preparatory Meeting
As of 22nd Meeting, Abu Dhabi, United Arab Emirates: April 2017
Panel Session 3 WRC-15 Agenda item 1.1
Bundesnetzagentur Use of the Fixed Satellite Service for RPAS C2 link (ITU Resolution 155 (WRC-15)) Martin WEBER REGIONAL PREPARATORY GROUP.
Panel Session 4 WRC-15 Agenda items 1. 2 and 1. 3 (incl
SADC WRC-15 Preparatory Meeting
WRC-15 Agenda Item 1.7 John Taylor ICAO Preparatory Spectrum Seminar for WRC-15 Thailand March 11-12, 2014.
WRC-12 A.I. 1.7 Eric ALLAIX DGAC-DSNA.
WRC-12 A.I. 1.3 Eric ALLAIX DGAC-DSNA.
5G and IMT Identification - Views from CEPT-
John Taylor ICAO Spectrum Workshop for WRC-15 CAIRO Feb 16-17, 2015
doc.: IEEE <doc#>
September 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Regulatory activity above 275 GHz in.
Doriana Guiducci, European Communications Office
12/7/2018.
Panel Session 5 WRC-15 Agenda items 1.6, 1.8, and 1.7
SADC WRC-15 5th Preparatory Meeting
Draft ICAO Position for ITU WRC-19
SADC WRC-15 Preparatory Meeting
SADC WRC-15 Preparatory Meeting
Coordination of Satellite networks
Draft ICAO Position for ITU WRC-15
World Radiocommunications Conference
John Taylor Nairobi, Kenya Sept 3-4, 2013
Possible Future Agenda Items
Agenda Item Overview & draft India proposal
Draft ICAO Position for ITU WRC-15
GSC position on key WRC-19 AI 1.5 ESIMs
Preliminary GSC positions on WRC-19 agenda items 1.13 IMT
WRC 19 Agenda Item 7 Issue A New Delhi 11 June 2019.
Presentation transcript:

Panel Sessions 7 & 8 WRC-15 Agenda items 7 & 9.1 issues (9.1.2, 9.1.3, 9.1.5, 9.1.8) Khalid Al Awadhi

Issue A of WRC-15 AI 7 Informing the Bureau of a suspension under RR No. 11.49 beyond six months Method A1: NOC OR Method A2: modification to RR No. 11.49 to provide a regulatory mechanism to clarify the issue, with two options: Option A: Day-for-day reduction in the suspension period after 6 months, or Option B: Day-for-day reduction in the suspension period after 6 months up to 12 months* followed by two times reduction thereafter * The 12 months period can be changed

Issue A of WRC-15 AI 7 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Method A1: NOC   Support Method A2: Option A Day-for-day reduction Method A2: Option B Day-for-day reduction and then two times reduction Oppose

Issue B of WRC-15 AI 7 Publication of information on bringing into use of satellite networks at the ITU website Clarifying the BR’s action through one of the following: Method B1-Option A: implement amendments to RR Nos. 11.44B, 11.49 and 11.49.1 Method B1-Option B: Same as previous + stating that BR publish the info as received Method B2-Option A: implement amendments to RR Nos. 11.44B, 11.49 and 11.49.1, availing the BIU info at ITU-R website, and including the information in a Special Section (Res. 49) Method B2-Option B: Same as previous + stating that BR publish the info as received Method B3: Identify the BR actions required, and include in minutes of WRC-15

Issue B of WRC-15 AI 7 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Method B1 Option A   Support Method B1 Option B  Support Method B2 Option A Method B2 Option B Method B3 Support  Remarks Additional Measures Necessary to MOD Art. 11

Issue C of WRC-15 AI 7 Review or possible cancellation of the advance publication mechanism for satellite networks subject to coordination under section II of Article 9 of the Radio Regulations Method C1: NOC OR Method C2: Cancellation of the current API mechanism Option A: suppress the need for API Option B: Automatically generate API by BR as soon as CR/C received Method C3: Review of API mechanism Option A: Reduce the two-year validity period for an API (without CR/C) Option B: Suppress the minimum period of six months between API and CR/C

Consideration for other solutions Issue C of WRC-15 AI 7 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Method C1 - NOC   Oppose Method C2 Option A Method C2 Option B Support  Method C3 Option A Method C3 Option B  Support  Support Remarks Consideration for other solutions

Issue D of WRC-15 AI 7 General use of modern electronic means of communications in coordination and notification procedures Method D: Conclusion towards amendments to Resolutions 907 (WRC-12) to include the use of modern electronic means, and to Resolution 908 (WRC-12) to expand its scope to all kind of satellite network filings and to request the BR to analyze whether it is possible to have a single consolidated interface for both the submission of satellite network filings and the related correspondence Method APT ASMG ATU CEPT CITEL RCC Method D Support Support 

Failure of a satellite during the bringing into use period Issue E of WRC-15 AI 7 Failure of a satellite during the bringing into use period Different possible conclusions: Method E1: adding a footnote to RR No. 11.44B: if failure during BIU, frequency assignments brought into use Method E2: Same as previous + adding a footnote to RR No. 11.49: if failure during BBIU, frequency assignments brought into use Method E3: NOC Method E4: additional provision RR No. 11.44.3 allows to extend for 3 years the date of bringing into use from the date of the failure Method E5: consideration by the RRB on a case-by-case basis, based on BR report Method E6: If no decision from BR within three months: BR develop report and submit to the RRB

Issue E of WRC-15 AI 7 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Method E1 Oppose   Method E2  Oppose Method E3 - NOC Support  Support    Support Support Method E4 Method E5  Support  Method E6

Issue F of WRC-15 AI 7 Modifications to RR Appendix 30B in relation to the suspension of use of a frequency assignment recorded in the MIFR Conclusion towards aligning provisions of App 30B with Article 11, APP 30 & 30A, by extending the period allowed for suspension of the use of a frequency assignment to space station to three (3) years Method APT ASMG ATU CEPT CITEL RCC Single Method Support Support 

Issue G of WRC-15 AI 7 Clarification of bringing into use information provided under RR Nos. 11.44/11.44B Conclusion towards new regulatory provisions: enables BR to seek clarification from the notifying administrations under RR Nos. 11.44 and 11.44B allow BR to validate the information provided under RR No. 11.44 for GSO station: ensure information provided under RR No. 11.44B correspond to the deployed space station with transmission capability Method APT ASMG ATU CEPT CITEL RCC Method G Support  Support

Issue H of WRC-15 AI 7 Using one space station to bring frequency assignments at different orbital locations into use within a short period of time Different possible conclusions: Method H1: NOC + enquire from Admin about BIU and make info available: Previous orbital position of satellite satellite network BIU’ed by this satellite at previous location The reason for its relocation. Option A: include in the minutes of the Plenary of WRC-15 Option B: new WRC Resolution detailing the above Method H2: NOC

Issue H of WRC-15 AI 7 Using one space station to bring frequency assignments at different orbital locations into use within a short period of time Different possible conclusions: Method H3: extend the period of BIU from 90 days to 12 months + use space monitoring facilities to verify Method H4: reducing the time available for suspension to the cumulative number of days that the satellite network has been in use, up to a limit of three years Method H5: Administrations include the following information as part of confirmation of the BIU of frequency assignments to a satellite network: Previous orbital position of satellite the date the satellite left the previous orbital position the name of the ITU filing(s) used by the in-orbit satellite at the previous orbital position.

Issue H of WRC-15 AI 7 Using one space station to bring frequency assignments at different orbital locations into use within a short period of time Different possible conclusions: Method H6: A new resolution based on: Indicate if newly-launched satellite or in-orbit Explanation of abusive “satellite hopping” If in-orbit satellite: BR request clarifications BR accepts the BIU or refers to RRB RRB makes the decision

No Additional restrictions Issue H of WRC-15 AI 7 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Method H1 Option A Support   Method H1 Option B Method H2 - NOC Method H3 Method H4 Method H5 Method H6 Remarks No Additional restrictions

Possible method to mitigate excessive satellite network filings issue Issue I of WRC-15 AI 7 Possible method to mitigate excessive satellite network filings issue Possible conclusions for excessive CR/C filing issue: Method I1.1: Initial notification and due diligence information without Bureau examination Method I1.2: Initial notification and due diligence information with Bureau examination Method I1.3: Optional submission to initial notification information Method I1.4: NOC Possible conclusions for excessive API filing issue: Method I2.1: NOC Method I2.2: Suppression of the current API mechanism Method I2.3: removal of six months requirement between API and CR/C

Issue I of WRC-15 AI 7 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Possible conclusions for excessive CR/C filing issue Method I1.1 Method I1.2 Method I1.3 Method I1.4 – NOC Support Possible conclusions for excessive API filing issue: Method I2.1 – NOC Oppose Method I2.2 Method I2.3

Issue J of WRC-15 AI 7 Removal of the link between the date of receipt of the notification information and the date of bringing into use in RR No. 11.44B Method J1: Conclusion towards eliminating from RR No. 11.44B the only instance where the notification information for a frequency assignment to a space station in the geostationary-satellite orbit is not in conformity with RR No. 11.44B because of the requirement to confirm the notified date of BIU within 120 days of this date OR Method J2: NOC Method APT ASMG ATU CEPT CITEL RCC Method J1 Support  Support Method J2 – NOC  

Issue K of WRC-15 AI 7 Addition of a regulatory provision in RR Article 11 for the case of launch failure Method K1: Conclusion towards An additional provision of RR No. 11.XX to regulate any launch failure of a satellite that such failure makes the satellite unable to start BIU or BBIU of a notified frequency assignment Method K2: An alteration of this previous regulation is to make it on a case-by-case basis by the RRB OR Method K3: NOC

Support the extension of time-limit Issue K of WRC-15 AI 7 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Method K1   Method K2  Support Method K3 – NOC Support  Remarks Support the extension of time-limit

Issue L of WRC-15 AI 7 Modification of certain provisions of Article 4 of RR Appendices 30 and 30A for Regions 1 and 3 namely replacement of tacit agreement with explicit agreement or alignment of those provisions of RR Appendices 30 and 30A for Regions 1 and 3 with those of Appendix 30B Method L1: Modify the corresponding provisions of RR Appendices 30 and 30A in such a manner that the notion of tacit agreement be replaced by explicit agreement. OR Method L2: Harmonization of the provisions in Article 4 of both RR Appendices 30 and 30A with the corresponding provisions of Article 6 of Appendix 30B Method L3: NOC

Issue L of WRC-15 AI 7 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Method L1 Support  Method L2   Support Method L3 – NOC  Support Remarks Support studies

Issue 9.1.2 of WRC-15 AI 9.1 Studies on possible reduction of the coordination arc and technical criteria used in application of No. 9.41 in respect of coordination under No. 9.7 Proposed Conclusions on Resolves 1 (technical criteria) Option 1A Retain RR Nos. 9.7, 9.41 and 11.32A essentially unchanged Change trigger criteria from ΔT/T to C/I=C/N + X dB, where X is less than 12.2 dB (the value corresponding to 6% ΔT/T) RR No. 11.32A would use the same C/I criteria as above Option 1B NOC to current RR App. 5 identification of coordination requirements Change threshold levels for application of RR No. 9.41 for some frequency bands Replace C/I in RR No. 11.32A with uplink/downlink PFD masks for some frequency bands Option 1C Same as Option 1B, with PFD thresholds outside the Coordination Arc Option 1D: NOC

Issue 9.1.2 of WRC-15 AI 9.1 Studies on possible reduction of the coordination arc and technical criteria used in application of No. 9.41 in respect of coordination under No. 9.7 Proposed Conclusions on Resolves 2 (Coordination Arc) Option 2A: Reduce coordination arc as: 6/4 GHz band ±8⁰ reduces to ±6⁰ 14/10/11/12 GHz band ±7⁰ reduces to ±5⁰ 30/20 GHz band NOC to ±8⁰ Option 2B: Reduce coordination arc as: 30/20 GHz band ±8⁰ reduces to ±6⁰ Option 2C: NOC

Issue 9.1.2 of WRC-15 AI 9.1 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Resolves 1 (technical criteria) Option 1A   Support  Option 1B Option 1C Option 1D – NOC  Support Resolves 2 (Coordination Arc) Option 2A Support Option 2B Option 2C – NOC Remarks Alteration

Issue 9.1.3 of WRC-15 AI 9.1 Use of satellite orbital positions and associated frequency spectrum to deliver international public telecommunication services in developing countries Two possible conclusions: Option A: NOC Option B: Revise Resolution 11 (WRC-12) in order to continue with the studies as it may be required for resolves 2 of Resolution 11 (WRC-12) to continue even after WRC-15 Method APT ASMG ATU CEPT CITEL RCC Option A - NOC Support   Option B  Support Remarks Supress Res 11 (WRC-12) Alteration

Issue 9.1.5 of WRC-15 AI 9.1 Consideration of technical and regulatory actions in order to support existing and future operation of fixed-satellite service earth stations within the band 3 400-4 200 MHz, as an aid to the safe operation of aircraft and reliable distribution of meteorological information in some countries in Region 1 Conclusion towards modification to Resolution 154 (WRC-12), calling for relevant administrations in Region 1 to use special care in the coordination, assignment, and management of frequencies taking into consideration the potential impact on the FSS earth stations used for satellite communications related to safe operation of aircraft and reliable distribution of meteorological information in the frequency band 3 400-4 200 MHz. Consideration may be given to modifying RR No. 5.430A to include a reference to the modified Resolution

Issue 9.1.5 of WRC-15 AI 9.1 Regional Positions Method APT ASMG ATU CEPT CITEL RCC Single conclusion  Support Support Remarks Alteration

Regulatory aspects for nanosatellites and picosatellites Issue 9.1.8 of WRC-15 AI 9.1 Regulatory aspects for nanosatellites and picosatellites The ITU-R Study Groups have concluded that additional efforts should be undertaken by the BR, administrations, and others to help increase knowledge and raise awareness about the applicable regulatory procedures for satellite networks among those entities involved in development and launch of nanosatellites and picosatellites. Another relevant response to this issue could be to consider modifications to the regulatory procedures for notifying satellite networks to accommodate nanosatellite and picosatellite missions

Issue 9.1.8 of WRC-15 AI 9.1 Regional Positions APT ASMG ATU CEPT CITEL RCC views Retention of Res 757 (Rev.WRC-12) with Modifications new agenda item, but no additional complications Simplified regulatory procedures  propose a new ITU-R Resolution  NOC + no need for new Agenda Item Can have new agenda item, but no additional complications