HV Imon in 1th MTCC period

Slides:



Advertisements
Similar presentations
RPC calibration D. Piccolo INFN Napoli. Calibrations Electronic test –Channels check –Strip pattern for trigger check –Threshold test –Synchronization.
Advertisements

RPC M&OB status Pigi Paolucci. Summary 2010 Cash Contributions foreseen CHF 2010 Expenditures (2009 carry over) CHF Present Income Balance.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Link Board Upscope Frascati group Napoli group Warsaw group.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
Giovanni Polese 1 HV cabling multiconductor connettorization (600 ch) : pretest and fixing: 1 month * 2 people connectorization: 2 months * 2 people HV.
MuonDPG/RPC M. Maggi INFN Bari. DQM tool for the DCS data Control Analysis Tool (CAT) by Cimmino, Lomidze, Paolucci, Polese To 1.Make custom DCS data.
A. Cimmino - P. Paolucci - G. Polese / DCS meeting DQM tool for the DCS data What the RPC community needs: 1.Make online/offline DCS data.
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
LV and HV status of the RPC system RPC detector and trigger group.
Low Voltage LB status RPC detector and trigger group.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
Plans for the 2015 Run Vito Palladino Straw Working Group 2/2/2015.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
OSU 9/7/03 1 Radioactive Source Tests at OSU Our source tests are made using three Cs137 sources 10  C sources (~15 years old, t1/2 Cs137=30.2yrs) Cs137.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
1 Status and Outlook of the RPC Commissioning Marcello Maggi/INFN-Bari.
ISEG HV power supplies for NA62 R. Fantechi 6/4/2011.
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Jean-Sebastien Graulich, Geneva
Production ad Quality control of RPCs for the CMS muon barrel system
Tower 8 – X6 anomaly MRB Meeting – 24 August 2005.
ATLAS MDT HV – LV Detector Control System (DCS)
RPC Barrel HV & LV system Lappeenranta University
Electronics for RPC Upscope
Cosmic Ray Tracker and Detector Control System at the GIF++
Handling online information in the LHCb experiment
HV & LV status LV system in W+1 and W+2 is OK
RPC HV&LV systems Introduction Detector description Requirements
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC Manufacturing Review - Pierluigi Paolucci - I.N.F.N. Napoli
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
The IFR Online Detector Control at the BaBar experiment at SLAC
Alfonso Boiano1, Flavio Loddo2, Pierluigi Paolucci1, Antonio Ranieri2
RPC Detector Control System
23 Barrel chambers and 12 Endcap chambers
RPC Detector Control System
RPC Detector Control System
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
HV-LV-DCS Status NEWS DCS Endcap Integration
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Dr. Pierluigi Paolucci - INFN di Napoli
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System: towards the final system
RPC Detector Control System
RPC HV-LV project Introduction System requirements and description
RPC HV-LV project Introduction RPC description Requirements
HV & LV status LV system in W+1 and W+2 is OK
RPC Detector Control System
Resistive Plate Chambers performance with Cosmic Rays
HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV)
RPC HV-LV project Introduction System requirements and description
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Dr. Pierluigi Paolucci - INFN di Napoli
23 Barrel chambers and 12 Endcap chambers
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

HV Imon in 1th MTCC period POWER CYCLE A. Cimmino - P. Paolucci - G. Polese 09-11-2006 / Joint RPC-Trigger meeting P. Paolucci - I.N.F.N. Napoli

HV Imon test with Resistors at 904 31 c 31 c WITHOUT FAN UNIT 31 c 20 c WITH FAN UNIT 20 c 20 c A. Cimmino - P. Paolucci - G. Polese 09-11-2006 / Joint RPC-Trigger meeting P. Paolucci - I.N.F.N. Napoli

HV power cicle test with Resistors at BLG 904 POWER CYCLE B2 CHO/1 BOARD 1 CH0/1 BOARD 1 CH2 NO FAN-31C NO FAN-31C BOARD 2 CH0/1 BOARD 3 CH0/1 NO FAN-31C FAN-20C A. Cimmino - P. Paolucci - G. Polese BOARD 3 CH2 BOARD 4 CH0/1 FAN-20C 09-11-2006 / Joint RPC-Trigger meeting FAN-20C P. Paolucci - I.N.F.N. Napoli

Sotware and Hardware Reset test SW HW A. Cimmino - P. Paolucci - G. Polese 09-11-2006 / Joint RPC-Trigger meeting P. Paolucci - I.N.F.N. Napoli

I0set influences Imon readout I0 changed from 800 microA to 750 microA A. Cimmino - P. Paolucci - G. Polese 09-11-2006 / Joint RPC-Trigger meeting P. Paolucci - I.N.F.N. Napoli

HV conclusion We were able to reproduce the instability effect at BLG 904 using resistive charge  problem is not related to the detector/cable Measuring independently the current on the ground wire we understood the instability was on the monitored current (Imon) and not on the generated current. The increase let us suspect to a thermal drift of some components and so we begin to use the CAEN fan unit to ventilate the boards. Using the fans the board temperature went down from 31oC to 20oC and for 6 days Imon was very stable but increased on the 7th The s of the Imon distribution of the ventilated boards is 0.2 mA and it was twice without fan. Software power cycle do not affect the Imon (offset is constant) Hardware power cycle of any board present in the EASY crate affect the offset of all the boards in the crate. CAEN got all the results and is now trying to reproduce them in their lab. Some critical components has been found !!!! A. Cimmino - P. Paolucci - G. Polese 09-11-2006 / Joint RPC-Trigger meeting P. Paolucci - I.N.F.N. Napoli