Financial Transmission Rights in NZ Market Considerations and Development 19th September 2018 Intro I’ve been involved with the FTR project team since.

Slides:



Advertisements
Similar presentations
European Federation of Energy Traders 1 Electricity Regional Initiative Central-South Europe Region 4th Stakeholder Group meeting The Central South Region.
Advertisements

EuroPEX Decentralized Market Coupling as the preferred cross-border method B. den Ouden, President of Europex APEx Annual Conference 2004 Leipzig, Germany,
Progress with coupling FUI and CWE region
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
Copyright 2003 PJM 1 PJM’s Annual FTR Auction.
The EA’s 2-Hub FTR Market Roger Miller and Grant Read Presented to EPOC 2011 by Roger Miller.
Albanian power market Sokol RAMADANI Chairman ERE- Albania 1 FEBRUARY 2012 Electricity market design and regulatory issues in Albania and South East Europe.
Ent. 7, 12 Krasnopresnenskaya Embankment, Moscow, , Russia Administrator of Trading System (ATS) Russian Power Exchange.
Conference on Voluntary Pension System- August 11, ROLE OF TRUSTEE IN PROTECTING THE PENSION FUND UNDER THE VOLUNTARY PENSION SYSTEM (VPS) AND OTHER.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
ENTELA SHEHAJ Albanian Energy Regulator (ERE) DOES MONITORING METHODOLOGY MATTERS? Electricity Market Monitoring in Albania.
Flow-based Allocations Mini Forum Central Western REM June 20 th, 2006.
Reliability Charge Colombia, an investment oportunity Paris, Octuber 15-16th, 2007.
_________ CASC.EU Intraday Forum _________ ROME, March 13 th, Intraday Forum, ROME, 2012/03/13.
Legal and Regulatory framework Regional Power Exchange Issues Apr 4, 2006 Kjell A Barmsnes
Challenges for the SEM.  Day-ahead price coupling is a key feature of the final draft Framework Guidelines on congestion management issued by ERGEG in.
For discussion purposes only Financial Transmission Rights: Design options Presentation to Electricity Commission 2 September 2009.
Ontario Electricity Supply Forum PEO Mississauga Chapter - September 6, 2007 Rhonda Wright-Hilbig, P.Eng Market Analysis - IESO.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
Joint IPE auction implementation and results 1 SWE IG meeting – 7 April 2014 Joint IPE auction Update on launch of long term coordinated product (CNMC.
Energy Agency of the Republic of Serbia
SEM – One Year On Liam Ryan, Market Operations Manager.
Presentation to House Regulated Industries Committee Chairman Phil King Trip Doggett Chief Operating Officer The Electric Reliability Council of Texas.
Lead from the front Texas Nodal 1 Texas Nodal Congestion Revenue Rights (CRR) EDS 3 Release 7 - Overview EDS 3 Phase 2 MP Planning.
Reliable Power Reliable Markets Reliable People Transition of Authoritative Documents – Information Session September 2009 Doyle Sullivan Evelyn Kelly.
Enhanced Interregional Transaction Coordination: implementation update Billing and Accounting Working Group January 19, 2011 David Edelson Senior Project.
Nodal MIS Portal Project MIS Functions to Support EDS 3, Release 5 September 11, 2007.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
Lead from the front Texas Nodal 1 Texas Nodal Registration Kick-off Meeting Matt Mereness June 6 th, 2007.
FURTHER INFORMATION ON MISO FTR AUCTIONS For SPP RSC Discussion October 6, 2010.
ERGEG Public Hearing 30. June 2005 Congestion Management Guidelines.
September 2008 QSEC auction - Allocations Transmission Workstream
9/12/2006 TPTF MIS / Training Status & Update Pat Harris A portal is a web site or service that offers a broad array of resources and services such as.
State Estimator Redaction Task Force Progress Report to WMS/ROS 5/11/2011.
1 Cross Border Intraday on the North Italian Borders Interim solution 4th Stakeholder Group Meeting Rome, 15 th May 2012.
European Market Model Implementation CIM Users Group Spring Meeting Praha, Czech Republic.
CASC.EU – Capacity Allocation Service Company CASC.EU SA 23/11/10CASC-EU S.A. (R)
CRR Default and the Nodal Market Wholesale Market Subcommittee February 20, 2008.
Interconnector Physical Notification submissions following XBID (Cross Border Intra Day) market implementation; the cross border gate closure definition.
Www2.nationalgrid.com/bsuos An Introduction to Balancing Services Use of System Charging (BSUOS)
1 The End Of Price Freeze Service (PFS) For Schedule P Customers Presentation To The Maryland Public Service Commission by Wayne Harbaugh March 4, 2002.
Licensing/Competition Committee Meeting September 5-6, 2005, St. Petersburg, Russia 1 Development of the Market Monitoring process in ERRA countries Maria.
Commercial Operations Subcommittee (COPS) Update to TAC 4/28/2016
Market Trials Congestion Revenue Rights
EMR Delivery Body Contract for Difference – December 2016.
OASIS II Stage 1 Requirements Joint OASISII Implementation Task Force Paul R. Sorenson November 17, 2004.
LAR in aspect of the cadastral managing – capacity building
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
NORD POOL SPOT UPDATE Hando Sutter September 21st, 2012
Cross Border Intraday on the North Italian Borders Interim solution 4th Stakeholder Group Meeting Rome, 15th May 2012.
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Further Information on MISO FTR Auctions
Electricity Wholesale Markets: Designs for a low-carbon future
Lithuanian PX Giedrius Radvila AB “LIETUVOS ENERGIJA” Minifora Vilnius
OASIS II Stage 1 Requirements Joint OASISII Implementation Task Force Paul R. Sorenson November 17, 2004.
An Introduction to Balancing Services Use of System Charging (BSUOS)
NORD POOL SPOT UPDATE Hando Sutter September 21st, 2012
Pseudo-tie business procedure
Electricity Procurement Options
Sales Process March 2017.
GTAC Workshop Block 5 19 September 2018.
29th April 2014 Teleconference
The Network Model Management System
Optimisation of Entry Capacity Modification Proposal
Electricity and Natural Gas Markets in Serbia
Interconnector trading in SEM 7th June 2007
Retail Energy Code - Data Access Schedule
Pseudo-tie business procedure
Albanian power market ERE- Albania Sokol RAMADANI Chairman E R E
Presentation transcript:

Financial Transmission Rights in NZ Market Considerations and Development 19th September 2018 Intro I’ve been involved with the FTR project team since 2013 and have helped consult, test and implement the various FTR market changes until today Today, I’m going to go through the structure of the FTR market, and the FTR market design and hopefully the WHY to help your understanding of what you need to think about.

Financial Transmission Rights (FTRs) FTRs are financial hedges: protect energy traders from price uncertainty between nodes caused by transmission losses and constraints Settlement of FTRs is based on: half hourly wholesale electricity prices the pool of loss and constraint rentals prices paid for FTRs FTRs are a standard component of most nodal markets

The CODE, RULES and POLICIES

2004 JUNE 2013 The Code RFP issued by the Authority Code & FMSPA Fundamental requirements FTR Allocation Plan What FM must do FTR Policies How FM will do it FTR Participation Agreement The legal glue 2004 JUNE 2013 The Code RFP issued by the Authority System Delivery Agreement Service Provider Agreement ‘FTR Manager’ is a new service provider under the Code

Fundamental requirements Code & FMSPA Fundamental requirements The CODE & SPA Preparation of Allocation Plan Creation, Allocation and Reconfiguration of FTRs Auction Revenue FTR Register Assignment of FTRs Auction Suspension Process FTR SPA

Allocation Plan FTR Manager plan for operating the market FTR Allocation Plan What FM must do Allocation Plan FTR Manager plan for operating the market Auction Rules FTR Products FTR hub addition and removal process Issued by the FTR Manager after EA approval FTR Policies

Use of the FTR Information System (a user guide) FTR Calendar FTR Policies How FM will do it FTR Policies Registration Use of the FTR Information System (a user guide) FTR Calendar FTR Grid and Auction Data Prudential Requirements

Role of FTR Manager Prepare and publish the FTR allocation plan Detailed in Subpart 6 of Part 13 of the Code Prepare and publish the FTR allocation plan Create and allocate FTRs Operate the FTR register Assign FTRs Exchange information from other service providers: Grid Owner Clearing Manager Pricing Manager

MARKET DESIGN

FTR Market Design Features 112 FTR Products available up to 2 years in the future

FTR Information System Public FTR website Portal for information and access to FTR Register FTR Register Open to public Participant User FTR Information System (FIS) Includes publicly available information (FTR Register) Secure access for FTR Participants Bid submission File upload/download

Progressive Release of FTR Capacity

FTR Auction Schedule

Market Participants

FTR Participants – The FUG SWET These are the current market participants.

Common issues “This product was awarded at $XX! I would have paid that” – early on participants did not pay what it was worth to them Anonymous market – every FTR and $$$$ is publically available Consultations – investors vs Gentailers Prorating tied bids Indicative capacity Indicative clearing prices by NZX Conceptual understanding on FTR path vs a physical path