Systems Engineering Bob Goeke 27 June 2005 System Engineering.

Slides:



Advertisements
Similar presentations
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter 2008 Week 6 Day 1 Lecture On and Examples Of Electrical Circuits.
Advertisements

MPLS Performance Measurement UDP Return Path draft-bryant-mpls-oam-udp-return-02 {stbryant, msiva,
22-1 Current & Circuits. Potential Difference Charges can “lose” potential energy by moving from a location at high potential (voltage) to a location.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
Global Design Effort 1 Conventional Facilities and Siting Overview A. Enomoto, J-L. Baldy, V. Kuchler GDE.
Configuration Management and Server Administration Mohan Bang Endeca Server.
Inst. Overview Alice Preliminary Design Review JRS / 1 Instrument Overview and System Engineering John Scherrer (210) July.
PACS IBDR 27/ BOLC/BOLA1 BOLC / BOLA SAp/DAPNIA/DSM/CEA C. CARA WE Design Team: A. BOUERE - N. DEVIN - G. DHENAIN - E. DOUMAYROU M. SEYRANIAN -
From Research Prototype to Production
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
System issues System decomposition / Product tree System specification: function, performance, interfaces, budget Work-breakdown structure.
Automated Industrial Wind Tunnel Controller By Daniel Monahan and Nick DeTrempe Advised by Dr. Aleksander Malinowski.
DYNAMICS Worked Example 4 – Pushing Blocks. 56 N acts on 3 blocks as shown. A 7 kg B 14 kg C 7 kg 56 N Each block experiences 6 N of friction. a) Calculate.
Mars Exploration Rover MER Surface Lifetime Presented at Landing Site Selection Workshop #3 March 26-28, 2002 J. Matijevic 3/28/02.
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
C osmic R Ay T elescope for the E ffects of R adiation Mechanical Design CRaTER and the Electronics Assembly Matthew Smith Mechanical Engineer (617)
Sept. 2008EFW INST+SOC PDR IDPU Chassis Mechanical Design and Development Bill Donakowski Mechanical Engineer UCB/SSL
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Catalyst – Thursday 20 th 1.Object A is sitting 50m above the ground, Object B is sitting 5m above the ground. They are the same size, which has more potential.
What is a safe work permit? A safe work permit is a written record that authorizes specific work, at a specific work location, for a specific.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 2.2 Budgets & Metrics 1 GLAST Large Area Telescope:
THEMIS MISSION PDRINSTRUMENT OVERVIEW- 1 UCB, November, 2003 THEMIS INSTRUMENT PAYLOAD SYSTEM OVERVIEW Dr. Ellen Taylor University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
SPECIFICATION FOR APPROVAL ( PB-FREE APPLICATION ) CUSTOMER:BERESEE Co., Ltd ITEM: POWER SUPPLY UNIT (for 37” ~ 42 ” HD MNT) DESCRIPTION:260W BUILT-IN.
MBSE Panel Integrating MBSE into a Multi-Disciplinary Engineering Environment An ELECTRICAL SYSTEM ENGINEERING Perspective Alex Jimenez Jet Propulsion.
Draft Policy Better IPv6 Allocations for ISPs 1.History including origin & shepherds 2.Summary 3.Status at other RIRs 4.Staff/legal assessment 5.PPML.
990901EIS_RR_Tech.1 Overview and Status of EIS Technical Program Dr. Clarence M. Korendyke EIS US Project Scientist Naval Research Laboratory
Rose Navarro HMI Lead Thermal Engineer
Nylon 6,6 from HMDA and Adipic Acid
EFW DFB Systems Assurance
EFW DFB Systems Assurance
EPPR secretariat proposal
Overview of EPA Method 1631, Revision E By Roy W
Service Restore Flow Receives/retrives input of list of server involved in the process Flow Performs multi level health check like process status, replication.
What is the engineer waiting for?
CINEMA System Engineering
Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission
THEMIS Mission Assurance
Campus Master Plan.
Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017
A synchronized protocol for distributed collaborative modeling
Goals of soBGP Verify the origin of advertisements
Warm Up Get a whiteboard and a marker
TG Chair: Darrin Willauer Baker Hughes
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2008.
ΙI. System Analysis Data Flow Diagrams
GLAST Large Area Telescope
1. Introduction and Overview
Digits-2-Digits.
CRaTER Pre-Environmental Review (I-PER) Spacecraft Interfaces Bob Goeke September 10-11, 2007.
ΙI. System Analysis Data Flow Diagrams
BRIAN KLATT MISSION ASSURANCE MANAGER
Enhancement Notification Release 5.4
Systems Engineering Bob Goeke.
IPv6 Subsequent Allocation
Systems Engineering Bob Goeke.
R101 amendment Proposal from German
Homework #5 1. a) What are the EPA standards dealing with air quality in terms of particulate matter? b) How are they being revised? c) Give the rationale.
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2007.
CRaTER Pre-Environmental Review (I-PER) Engineering Requirements/Design Updates Bob Goeke September 10-11, 2008.
Systems Engineering (plus Data, Digital, Power)
Back-End Payor Sub-Group
Closing IEEE 802 EC Friday 15th March 2019
Workshop 1: Processing Facility Configuration Information
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 4/9/2019.
GLAST Large Area Telescope:
Status of the PM NAAQS Review
DER Growth Scenarios and Load Forecasts Working Group
CRaTER Pre-Environmental Review (I-PER) Spacecraft Interfaces Bob Goeke September 10-11, 2008.
Contestable Works Consultative Committee
Presentation transcript:

Systems Engineering Bob Goeke 27 June 2005 System Engineering

System Block Diagram 27 June 2005 System Engineering

Configuration Management and Peer Review Process Process documented in 32-01201 Rev A We maintain reference, Bookmark, and Controlled documentation Reference: GSFC project documents, vendor data sheets Bookmark: what most folks call DRAFT Controlled: must go through Configuration Management Board All revisions of all documentation are maintained on public web site http://snebulos.mit.edu/projects/crater/ Peer reviews are an incremental process run in parallel with the ECO process Peer review validate the proposed initial or changed design ECO process controls the documentation Review board meets in public every Wednesday 27 June 2005 System Engineering

ICD Status Data ICD At Rev. B awaiting GSFC Sign-off Electrical ICD Draft returned to GSFC with comments Mechanical ICD Draft 2 returned to GSFC with comments Thermal ICD Draft returned to GSFC with comments (We owe s/c model inputs) 27 June 2005 System Engineering

Miscellaneous Requirements Contamination Control (32-01203 Rev 06) Our internal requirements are modest; waiting to see Project requirements Detectors could develop surface leakage if particulates accumulate on surface Exposed electrical connections to detectors could lose conductivity if attacked by (primarily) salt atmosphere Purge This is a precaution against air borne contamination, esp. during I&T Handling At 5Kg total mass, we are in the “pick up and carry” class 27 June 2005 System Engineering

System Resources Mass Power Data Rate Proposal 4.3 Kg 4.6 watts 200/2K/200Kbps Peak 6 Kg 12 watts 1K/100Kbps CBE 5.0 Kg 5.1 watts 515/86.6Kbps Allocation 5.6 Kg 6.0/9.0 watts 86.6Kbps Margin 12% 18%/76% n/a Request add. Allocation 0.4 Kg 27 June 2005 System Engineering

27 June 2005 System Engineering