IMP Cryomodule Assembly and Alignment

Slides:



Advertisements
Similar presentations
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Advertisements

Progress and Plan for Superconducting RF Cavity RF Group.
Spectrometer Solenoid Fabrication Update Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 14, 2009.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
ANL HWR Cryomodule Status Update 27 January 2015 Zachary Conway On behalf of the ANL Linac Development Group Argonne National Laboratory Physics Division.
LCLS-II Cryomodules Production Plans at Fermilab
FNAL-SCRF 会議報告 1. Cryomodule, Plug-compatible Interface ( 大 内) 2. High Pressure Code, 5K Shield (Tom Peterson)
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe MLC external review October 03, 2012.
Assembly, Installation and Interfaces Steve Virostek Lawrence Berkeley National Lab RFCC Module Design Review October 21, 2008.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MAP Winter Collaboration Meeting at JLab, Virginia February 28, 2011.
S1 Global Module Cavity String Assembly Workflow Tug Arkan January 15, 2010.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
LCLS-II cryomodule alignment. 2 Wednesday meeting, 6/17/2015 Topics Alignment of Components inside the CM Tunnel Network Tolerances LCLS-II cryomodule.
Americas Region: T4CM Status and Plans H. Carter TD SRF Dev. Dept. July 14, 2006.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Laboratory MICE CM29 at RAL, UK February 17, 2011.
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
Test plan for SPL short cryomodule O. Brunner, W. Weingarten WW 1SPL cryo-module meeting 19 October 2010.
56 MHz SRF Cavity Thermal Analysis and Vacuum Chamber Strength C. Pai
Summary ( Cryomodule, Plug-compatible Interface) Norihito Ohuchi.
Americas Cavity Specification C.M. Ginsburg (Fermilab) On behalf of the Fermilab cavity crew October 20, 2010.
Xx-xx-2010, tanks arrive from Snezhinsk to Novosibirsk A.Tribendis, July 19-21, 2010, Snezhinsk 1. Check cavity dimensions on a CMM 2. Assemble and measure.
 =1 cavity: parameters Dimensions for cavity fabrication before any chemical polishing and at room Temp. outer ½ cell pick-up side inner ½ cells outer.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
CM2 Repair Status 8/13/2012 Tug Arkan 1. Latest Status After the warm end couplers were disassembled, it was decided to disassemble all the lower aluminum.
MHI#16 号機の2回目の EP2  Process log  Status of working  Monitor data during EP & Rinsing process  Comparison of EP2 Period : 2011/5/10 ~ 5/16 Process :
Cryomodule Assembly Facility (CAF) at Fermilab Tug Arkan (FNAL) FNAL-LBNL joint meeting on SRF Cavities and Cryomodules March 15, 2012.
Preparation procedure and RF processining of cERL-ML power coupler at KEK Hiroshi Sakai, Takaaki Furuya, Masato Sato, Kenji Shinoe, Kensei Umemori, Kazuhiro.
CM2 Helium Circuit Vacuum Leak & Repair Tug Arkan, 6/18/
CW Cryomodules for Project X Yuriy Orlov, Tom Nicol, and Tom Peterson Cryomodules for Project X, 14 June 2013Page 1.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe.
Ralf Eichhorn CLASSE, Cornell University. I will not talk about: Cavities (Nick and Sam did this) HOM absorbers (did that yesterday) Power couplers (see.
RF Module Update MICE Collaboration Meeting 44 Andrew Lambert Lawrence Berkeley National Laboratory March 30 th, 2016.
Cryomodule Assembly Facility (CAF) at Fermilab: Feasibility Overview for Project X & future SRF Cryomodules Assemblies Tug Arkan February 21, 2012.
Hao Guo LINAC Department Institute of Modern Physics.
Cryomodule Assembly Facility Fermilab Cleanroom: Assembly/Disassembly Tools Tug Arkan 1.
All Metal Gate Valve from VAT
FNAL Cryomodule Assembly and Installation Plans Tug Arkan May 22, 2015.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Vacuum Related Procedures and Tools of IHEP ILC Test Cryomodule Assembly Jiyuan Zhai (IHEP) TTC Topical Workshop on SRF Cryomodule Clean Room Assembly.
JLAB Cryomodule Assembly Facilities Visit Report Tug Arkan, Yuriy Orlov March 26, 2012.
Status Report of the Review of Vacuum Systems and Procedures Tug Arkan, Allan Rowe 3/7/
Philippe Goudket ASTeC, STFC Daresbury Laboratory TTC –TOPICAL WORKSHOP SRF CLEANROOM ASSEMBLY.
Adjustable tuner HENRY PRZYBILSKI / PIERRE-ALAIN LEROY.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Cleanrooms Keith Middleman. Particulates and Clean rooms What is a particulate? Small discrete mass of solid or liquid. Human hair is microns in.
Guillaume Olry on behalf the IPN Orsay SPIRAL2 team TTC Meeting – Milan, 28 Feb-3 March 2011.
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
PIP-II SSR1 Cryomodule Technical Issues Leonardo Ristori TTC Meeting
Field Emission Minimization for LCLS-II
Assembly of Crab Cavities couplers in SM18 clean room
DESY Experiences on Use of Gas overlay during Assemblies
TTC Topical Workshop on SRF Cryomodule Clean Room Assembly
Definition of work flow for string DESY Example on critical operation
SC spoke cavity for China-ADS 3~10MeV injector
C50 Cavity pair Assembly Changes
HWR Cavities for China ADS
WP 3 coordination meeting Saclay May 2008
CEPC Input Coupler Discuss 6th IHEP-KEK SCRF Collaboration Meeting
INSTITUTE OF HIGH ENERGY PHYSICS
Cryomodule Assembly Plan
CRYOMODULE FINAL ASSEMBLY
System tests at CEA O. Piquet 19/03/2019
V. Veshcherevich Cornell University
CRYOMODULE FINAL ASSEMBLY
SNS PPU CRYOMODULE PDR Cleanroom Assembly Katherine Wilson
HWR and Test Cryomodule for China ADS
Presentation transcript:

IMP Cryomodule Assembly and Alignment Hao Guo LINAC Department Institute of Modern Physics Good morning, everyone! I will introduce the strings assembly of superconductor cavity.

Cryomodule components-CM6 6 HWR, 6 tuner, 6 coupler, 6 SC solenoid, 5 BPM. Thermal radiation shield Aluminum plate and Muti-layer insulation 80K LN2 cooling insulating vacuum: 10-4Pa Clean room assembly - dimension: 4.2m×1.2m×1.6m - beamline vacuum: 10-7Pa 11/28/2018 IMP

Fixture for strings assembly This is the second vision of strings fixture. The main advantage of this fixture is that it could be divided into six parts. Each parts could support on cavity, on solenoid and one coupler. The second vision of CM6 strings fixture. This fixture could be divided into six parts, and each parts could support one cavity, one solenoid and one coupler.

Fixture for strings assembly The second vision of CM6 strings fixture

Assembly environment Class 100 clean room Length: 6m Width: 3m Width of the door: 2m Assembly operators: 4 persons

Assembly procedure Put parts on assembly fixture Blow screws, bolts, nuts, washer , gasket or flange with high purity nitrogen Tight all screws to 30Nm Pre-alignment Connect parts by bolts without fastening This is our assembly procedure. First we put the parts on assembly fixture, than blow the fasteners by nitrogen. After that we adjust the position of the parts, remove plastic film and connect parts. At last we tight all bolts and screws to 30Nm

The counter of particles less than 40 per minutes Assembly procedure The final test of every assemblies without SC cavities before strings assembly Leak check cleanliness Less than 5E-10mbarL/s The counter of particles less than 40 per minutes Before the strings assembly, we had a final test of every parts about leak check and cleanliness.

Challenges for cleaning RF components Welded bellows: the particles will hide in bellows and hard to remove. BPM: the particles will hide in buttons and hard to remove. (assembled and calibration in unclean room) couplers: the particles will hide inside and hard to remove. (Power condition in unclean room) The particle counter of bellows and BPM cleaned by ultrasonic (0.3μm) bellows BPM coupler >300 per 10s >10000per 10s >400 per 10s The main change of structure, we add a needle bearing to let the solenoid could sliding at a certain range. It could let us assemble easier between cavity and solenoid and it easier to protect the cleanliness.

Challenges for cleaning RF components Test area Solution: assembled in cleanroom and cleaned by HPR Parameter of HPR and particle counter (0.3μm) parts bellows BPM Coupler Pressure 60bar 40bar Rotate speed 20rpm Rinsing time 8min 15min 22min for outer conductor, 5min for inner conductor Without clean >12000 per 10s Ultrasonic clean >300 per 10s >17000 per 10s >400 per 10 s HPR 0 per 10s >900 per 10s N2 blow area The main change of structure, we add a needle bearing to let the solenoid could sliding at a certain range. It could let us assemble easier between cavity and solenoid and it easier to protect the cleanliness. Particle counter of BPM after ultrasonic cleaning and drying

Improvement for cleaning RF components We have done already HPR for bellows HPR for solenoids We plan to do The main change of structure, we add a needle bearing to let the solenoid could sliding at a certain range. It could let us assemble easier between cavity and solenoid and it easier to protect the cleanliness. HPR for BPM HPR for coupler

Pre-alignment in cleanroom The purpose of pre-alignment in cleanroom To prevent the abnormal twist of bellow in the cryomodule assembly. At this I will show the sequence of strings assembly. At first step, we join every cavity, solenoid and coupler. Then we adjust level of cavity and solenoid. At last, we tight bolts.

Fixture for strings assembly The detail structure of solenoids supporter Needle bearing The main change of structure, we add a needle bearing to let the solenoid could sliding at a certain range. It could let us assemble easier between cavity and solenoid and it easier to protect the cleanliness. 功能描述 The solenoid supporters could adjust the position of solenoid.

Pre-alignment in cleanroom First step: join the flanges of cavity and solenoid then fix screws without fastening. Second step: adjust levelness of cavity and solenoid by frame level meter. Third step: fasten screws to 30Nm At this I will show the sequence of strings assembly. At first step, we join every cavity, solenoid and coupler. Then we adjust level of cavity and solenoid. At last, we tight bolts.

The improvement for strings assembly All parts could slide on linear guide The structure of supporter have be designed to adjust parts easier. 12 bolts could be used for adjusting the position of every parts. The main change of structure, we add a needle bearing to let the solenoid could sliding at a certain range. It could let us assemble easier between cavity and solenoid and it easier to protect the cleanliness. 功能描述

Low speed vacuum The vacuum pumping rate is limited by mass flowmeter. The rate is 0.1 slm. Mass flow meter for vacuum pumping Mass flow meter for venting N2 The last step, we vacuum the strings and the vacuum pumping rate is limited by mass flowmeter. The rate is 0.1 standard liter per minutes. For our strings, we need 30 hours for vacuum. I had a questions about vacuum leak. If we found the strings is leak, how to solve it? Is that necessary to disassemble all the parts, clean and assemble again. Question: If the vacuum of strings leak, how to solve it?

Alignment process chart Single component’s calibration Bundle calibration BPM+Solenoid Location and measurement of offline network Offline alignment and monitoring Online alignment

Offline alignment and monitoring Portable CMM and Laser Tracker are cooperative used The least alignment time only used laser tracker is about 1-2 weeks; The cooperative alignment time is reduced to 1-2 days

Displacement and deformation of 78K Transverse Vertical Measure range±1.2mm

summary TCM6 passed the beam of 4mA 5Mev CW. So the entire process of cryomodule process is feasible. But the detail should been improved. The improved cleaning process of BPM and coupler could been testing on next cryomodule. The measure range of offline alignment is ±1.2mm.

Thanks for your attention!