University of California Los Angeles

Slides:



Advertisements
Similar presentations
TMB-RAT Software Update USCMS Slice Test Rice University August 16, 2004 Martin Von der Mey / Yangheng Zheng* University of California, Los.
Advertisements

Endcap Muon meeting: Florida, January 9-10, 2004 J. Hauser UCLA 1 TMB, RAT, and ALCT Status Report Jay Hauser University of California Los Angeles ALCT/Mezzanine.
TMB and RAT Status Report Endcap Muon OSU April 16, 2004 Yangheng Zheng University of California, Los Angeles  TMB Status  RAT Status.
Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
Martin von der Mey, EMU at CMU, October ALCT and TMB Status Martin von der Mey University of California Los Angeles ALCT production statusALCT production.
Commissioning of CSCs and Peripheral Crates Task L M. Ignatenko UCLA October
Uli Schäfer 1 Production and QA issues Design Modules have been designed, with schematic capture and layout, in Mainz (B.Bauss) Cadence design tools, data.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
TMB and RAT Status Report Endcap Muon OSU June 6, 2004 Martin von der Mey University of California, Los Angeles  Previous Status (OSU, April)
Mathieu Goffe EUDET JRA1 meeting, DESY Wednesday 30 January 2008 IPHC, 23 rue du Loess BP 28, 67037, Strasbourg Cedex 02, France.
9th October 2008AIDA FEE progress report P.J.Coleman-Smith 1 AIDA Frontend Electronics progress report. Mezzanine to FEE64 connection. Mezzanine Layout.
Performance of SPIROC chips in SKIROC mode
PPIB and ODMB Status Report Rice University April 19, 2013.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
An Asynchronous Level-1 Tracking Trigger for Future LHC Detector Upgrades A. Madorsky, D. Acosta University of Florida/Physics, POB , Gainesville,
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
Status of the CSC Track-Finder Darin Acosta University of Florida.
LNL 1 SLOW CONTROLS FOR CMS DRIFT TUBE CHAMBERS M. Bellato, L. Castellani INFN Sezione di Padova.
Status of Global Trigger Global Muon Trigger Sept 2001 Vienna CMS-group presented by A.Taurok.
CSC EMU Muon Sorter (MS) Status Plans M.Matveev Rice University August 27, 2004.
UCLA Group Meeting May 01, 2014 Andrew Peck Shayan Rastegari 1 Updates from Lab Andrew Peck & Shayan Rastegari May 01, 2014.
CSC EMU/Track Finder Clock and Control Board (CCB’2004) Status Plans M.Matveev Rice University August 27, 2004.
CSC ME1/1 Upgrade Status of Electronics Design Mikhail Matveev Rice University March 28, 2012.
DAQMB Production Status S. Durkin The Ohio State University Florida EMU Meeting 2004.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Update on final LAV front-end M. Raggi, T. Spadaro, P. Valente & G. Corradi, C. Paglia, D. Tagnani.
1 07/10/07 Forward Vertex Detector Technical Design – Electronics DAQ Readout electronics split into two parts – Near the detector (ROC) – Compresses and.
US CMS DOE/NSF Review: June 2002, B.Paul Padley, Rice University1 CSC Muon Trigger On Detector Components B. Paul Padley Rice University June, 2002.
FEE Electronics progress Mezzanine layout progress FEE64 progress FEE64 initial testing Test mezzanine. A few of the remaining tasks 2nd October 2009.
UCLA Group Meeting March 20, 2014 Andrew Peck Shayan Rastegari 1 Updates from Lab Andrew Peck & Shayan Rastegari March 20, 2014.
W. Smith, U. Wisconsin, US CMS DOE/NSF Review, May, 2004 Trigger Report - 1 CSC on-detector peripheral crate SBS VME Controller Muon Port Card: Output.
CSC Ops/DPG meeting, 05-Oct-2011 Hauser1 ALCT boards for ME4/2 etc.
Week 22: Schematic Week 23-Week 27: Routing Gerber files have been available since 9th July 1st prototype: – PCB manufacturer: supervised by KIT – Cabling:
Results with the RPC system of OPERA and perspectives
University of Wisconsin
Initial check-out of Pulsar prototypes
ECAL front-end electronic status
Modifications to the DRS4’s code
Iwaki System Readout Board User’s Guide
Update on CSC Endcap Muon Port Card
CSC EMU Muon Port Card (MPC)
University of California Los Angeles
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
University of California Los Angeles
University of California, Los Angeles Endcap Muon Purdue
University of California Los Angeles
ALCT Production, Cable Tests, and TMB Status
University of California Los Angeles
University of California Los Angeles
Regional Cal. Trigger Milestone: Major Production Complete
Current Status of CSC Trigger Elements – Quick Summary
CSC Trigger Update Specific issues:
Darin Acosta University of Florida
8-layer PC Board, 2 Ball-Grid Array FPGA’s, 718 Components/Board
ALCT, TMB Status, Peripheral Crate Layout, CSC Event Display
Status of n-XYTER read-out chain at GSI
TMB, RAT, and ALCT Status Report
Analysis of Oct. 04 Test Beam RPC Data
CSC Trigger Muon Port Card & Sector Processor in production
University of California Los Angeles
TMB and RAT Status Report
Effect of an ALCT SEU Much-overlooked good stuff
Jason Gilmore Vadim Khotilovich Alexei Safonov Indara Suarez
University of California Los Angeles
Sector Processor Status Report
The Ohio State University USCMS EMU Meeting, FNAL, Oct. 29, 2004
CSC Muon Sorter Status Tests Plans M.Matveev August 21, 2003.
Plans for the 2004 CSC Beam Test
Presentation transcript:

University of California Los Angeles ALCT Technical Status Martin von der Mey University of California Los Angeles ALCT2001 status Test stand TMB-ALCT-CFEB test Conclusion

Power, computer connectors ALCT2001 Boards Power, computer connectors 80 MHz SCSI outputs (to Trigger Motherboard) Xilinx mezzanine card Main board for 384-ch type Delay/ buffer ASICs, 2:1 bus multiplexors (other side) Input signal connectors Analog section: test pulse generator, AFEB power, ADCs, DACs (other side)

ALCT Functions Inputs discriminated signals from AFEB front-end boards, provides AFEB support: Distributes power, shut-down, test pulse signals. Sets and reads back discriminator thresholds. Monitors board currents, voltages, and temperature. Delay/translator ASIC on input does time alignment with bunch crossings. Searches for muon patterns in anode signals. If found, sends information to trigger motherboard. Records input and output signals at 40 MHz in case of level 1 trigger.

ALCT Status ALCT is the CSC anode trigger and readout board (anode local charged track). ALCT2001 is in pre-production. Minor modifications to ALCT2001. Have 288- and 672-channel board. 6 672-channel boards send out for assembly end of this week. Layout for mezz board for Virtex 2 chip finished. (maybe used by TMB. Additional inputs and outputs) ALCTs: 30 Mezz: 40

ALCT Status Small mistakes in layout to fix (1 wrong capacitor and 1 missing connection) 6 delay chips replaced Replaced 1 multiplexer Some shorts between inputs and outputs 3 mezz boards broken. (Missing connections) For assembly of more ALCT and mezz boards still two components missing. (voltage reference 1.2 V, Xilinx EPROM).

ALCT status Tried out diverse manufacture companies (Problem with bubbles for mezz board) Found problem with company. Different production company. Problems with assembly. First 10 boards had a lot of problems. Next 20 much better. Try another assembly company. Send the 6 672-channel boards there. Iatsura finished files for all types of boards and sent them to the assembly companies for quotations.

ALCT Test Procedure Complete test of the ALCT board and mezz board. (Documented and on the web) It tests complete functionality of ALCT and mezz board. Includes manual test of the delay chips.(To improve). This test step itself could damage the delay chips. Burn-in ALCT board and mezz board for two days at 70 C with power on.Repeat all tests after burning. Use students to help with the testing. At moment 2, thinking of hiring 2 more. It takes 5 days to test 8 boards if not too many problems occur. Could be much faster if manual testing could be reduced or replaced.

Problems encountered Change 1 multiplexer. Not working. The main problem found was related to the delays chips. After testing the last 8 ALCT boards 6 delay chips had to be replaced and several connections re-soldered : Shorts between two inputs. (1 delay chip) Wrong input resistance for inputs (2 delay chips) 1 broken delay chip. Delays too small (2 delay chips) compared to setting To investigate delay chip failure three boards were powered for 9 days at room temperature. No additional failures were seen.

Test stand

Testing Delay ASICs

Test firmware Use firmware developed by Zhmakin. Depending on the test 3 different test firmware have to be downloaded. Presently the delay chips have to be tested manually. Cycle minimum and maximum delay and check with oscilloscope for 24 chips times 16 channels. Zhmakin working on automatic procedure for testing delay chips. Would improve test. Having help in Florida from other two PNPI engineers and Madorsky. Zhmakin is working on combining the diverse test firmware into one. The firmware needs to be modified to also test the 288- and 672-channel boards. In moment it takes 2 hours of hard work to test completely one board.

ALCT programs Barashko wrote testing program. It uses JTAG to communicate with the firmware developed by Zhmakin. It controls the Virtex and Spartan functions. Supplied the required libraries for the slow control functions to Stasko. (Implemented into DAQ code). Madorsky supplied the library for the Virtex functions. Still to implement fully automatic delay test (?) and speed up other tests.

ALCT Test Program

ALCT Test Program

ALCT Test Program

ALCT-TMB Testing Standalone bench tests Radiation tests Cosmic ray tests ALCT-TMB test

TMB-ALCT-CFEB Test

LVDB-ALCT-CFEB

ALCT-TMB-CFEB Test Using DYNATEM to communicate from a Linux PC to the VME crate. New software has been written to control TMB functions using socket connections. Needs to be improved.(OSU) Maybe it is necessary to agree to one protocol (?) Injected patterns into the delay lines of the ALCT using self triggering. Injected patterns into the CFEBs. Found maybe problems with the PHOS4-chips again. CCB uses them for delaying the clocks. Looked at the results on TMB side. It depended on how the CCB PHOS4-chips powered up in respect to the TMB PHOS4-chips. Next step is to write the software to decode the data coming to the TMB from ALCT and CFEB and check the data.(OSU?)

Conclusions ALCT2001 in pre-production. Test is running well. Hiring more students to perform testing. Waiting for improvements in test procedure including test of delay chips. Reduce manual testing. Sent 4 ALCT boards to Florida. 8 ALCT boards and 5 mezz boards ready to ship. 5 ALCT boards and 5 mezz boards ready for burning. (pre-test) Test including TMB/ALCT/CFEB works well. Found small problems. For start of full production ALCTs we are waiting for feedback from FAST sites.