Paul Dauncey, Imperial College London

Slides:



Advertisements
Similar presentations
STAR Pixel Detector Phase-1 testing. 22 Testing interrupted LBNL-IPHC 06/ LG Lena Weronika Szelezniak born on May 30, 2009 at 10:04 am weighing.
Advertisements

6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
WORK AND ENERGY. The work done by a force is the product of the magnitude of the force and the distance moved in the direction of the force Recall the.
Bulk Micromegas Our Micromegas detectors are fabricated using the Bulk technology The fabrication consists in the lamination of a steel woven mesh and.
24 September 2002Paul Dauncey1 Trigger issues for the CALICE beam test Paul Dauncey Imperial College London, UK.
Recent activities Jamie C 23 rd April Threshold scans in reset Concept –Perform a threshold scan while holding different parts of pixel in reset.
29 June 2004Paul Dauncey1 ECAL Readout Tests Paul Dauncey For the CALICE-UK electronics group A. Baird, D. Bowerman, P. Dauncey, C. Fry, R. Halsall, M.
28 Feb 2006Digi - Paul Dauncey1 In principle change from simulation output to “raw” information equivalent to that seen in real data Not “reconstruction”,
20 Feb 2002Readout electronics1 Status of the readout design Paul Dauncey Imperial College Outline: Basic concept Features of proposal VFE interface issues.
Thursday, May 10th, 2007 Calice Collaboration meeting --- A.-M. Magnan --- IC London 1 Progress Report on the MAPS ECAL R&D on behalf of the MAPS group:
ARA Testbed Efficiency (Rough Cut) November 29 th Ben Rotter.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Recent progress Jamie C 31 st March 08. TRIMS Were looking odd… Step size too large! Tested some new values… R73=180k R75=180k Need to check this.
Tera-Pixel APS for CALICE Progress meeting, 17 th September 2007 Jamie Crooks, Microelectronics/RAL.
TPAC1.1 Jamie Crooks. TPAC1.1 (honest) First Batch Four boards – Received 10 at last meeting from Paul – Tested before bonding 9 boards operated correctly,
ASIC1 progress Jamie Crooks, Feb 08. Bonding Problems: Resolved Smaller bonding wedge + revised programShorts to seal ring discovered under bonds.
Physics 434 Module 3 - T. Burnett 1 Physics 434 Module 3 Acoustic excitation of a physical system.
1 Sept 2005Paul Dauncey1 MAPS award and issues Paul Dauncey Imperial College London.
1 Beetle xtalk measurements with test pulse at NIKHEF, B1.4 and B1.5 Aras Papadelis.
Gauge Operation and Software by Scott A. Ager. Computer Recommendations 750 MHz Pentium III 64 Meg SRAM 40 Gig Hard Drive 1024 x 768 graphics CD Writer.
Leo Greiner IPHC meeting HFT PIXEL DAQ Prototype Testing.
Performance David Monismith Jan. 16, 2015 Based on notes from Dr. Bill Siever and from the Patterson and Hennessy Text.
7 Nov 2007Paul Dauncey1 Test results from Imperial Basic tests Source tests Firmware status Jamie Ballin, Paul Dauncey, Anne-Marie Magnan, Matt Noy Imperial.
1 CPC2-CPR2 Assemblies Testing Status Tim Woolliscroft.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
Analysis of Algorithms CSCI Previous Evaluations of Programs Correctness – does the algorithm do what it is supposed to do? Generality – does it.
23 Apr 2008Paul Dauncey1 Future proposal possibilities Paul Dauncey.
11 Sep 2009Paul Dauncey1 TPAC test beam analysis tasks Paul Dauncey.
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 1 Paul Dauncey Imperial College London.
MPPC Measurements at LSU Brandon Hartfiel LSU Hardware Group Thomas Kutter, Jessica Brinson, Jason Goon, Jinmeng Liu, Jaroslaw Nowak Sam Reid January 2009.
NA62 Gigatracker Working Group Meeting 23 March 2010 Massimiliano Fiorini CERN.
TELL1 high rate Birmingham Karim Massri University of Birmingham CEDAR WG Meeting – CERN – 26/03/2012.
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 2 Paul Dauncey Imperial College London.
21 Sep 2009Paul Dauncey1 Status of Imperial tasks Paul Dauncey.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
26 Apr 2009Paul Dauncey1 Digital ECAL: Lecture 3 Paul Dauncey, Imperial College London.
Kevin Nash MaPSA-Light test system 1. The System 2.
Tera-Pixel APS for CALICE Progress 30 th November 2006.
FED V1 Pulse Shape Issues System Meeting, CERN 14 th -16 th October 2003 M. Noy Imperial College London Pulse Shape Issues for the Tracker FED M. Noy Imperial.
10 Nov 2005Paul Dauncey1 Target power level stated in requirement was 1  W/mm 2 This is averaged over whole period of operation with ILC bunch timing.
F Don Lincoln, Fermilab f Fermilab/Boeing Test Results for HiSTE-VI Don Lincoln Fermi National Accelerator Laboratory.
1 Oct 2009Paul Dauncey1 Status of 2D efficiency study Paul Dauncey.
FEE card validation M. Raggi, T. Spadaro. The problem Validate FEE production – threshold determination at < 1mV accuracy – comparator time effects: Overdrive.
5 May 2006Paul Dauncey1 The ILC, CALICE and the ECAL Paul Dauncey Imperial College London.
Density Curves Frequency histogram- uses counts of items in each class Relative frequency histogram- uses percent of observations in each class Density.
1M. Ellis - MICE Tracker PC - 1st October 2007 Station QA Analysis (G4MICE)  Looking at the same data as Hideyuki, but using G4MICE.  Have not yet had.
Improve Accuracy with Software: S 0 Calibration. Calibrating the System Plot Draw the best straight line fit for the above function –You can find the.
G.Villani Aug. 071 CALICE pixel Laser testing update Laser MIP equivalent calibration update Si detector coupled to low noise CA + differentiator (no shaper)
Plots of RPC performance G. Cattani, University of Rome “Tor Vergata” & INFN Roma 2 on behalf of ATLAS Muon Collaboration.
CdTe prototype detector testing Anja Schubert The University of Melbourne 9 May 2011 Updates.
MECH 373 Instrumentation and Measurements
Plans for this week Preparation of Master course ...
Light mixer proposal Arjan Heering, Anton Karneyeu
CALICE(-UK) Status Paul Dauncey 28 Apr 2004 Paul Dauncey.
Firmware Structure Alireza Kokabi Mohsen Khakzad Friday 9 October 2015
PCAL Cosmic Ray Tests Progress Report C. Smith μ U V W MODULE 2
UK ECAL Hardware Status
Image Processing, Leture #16
DECAL beam test at CERN Paul Dauncey for the CALICE-UK/SPiDeR groups:
Accidental Coincidence Rates
Test of Link and Control Boards with LHC like beam, CERN, May 2003
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
Stefan Ritt Paul Scherrer Institute, Switzerland
Image Compression Purposes Requirements Types
Trigger issues for the CALICE beam test
Pixel Non-Uniformity Study
Charge diffusion model (again)
Imperial laser system and analysis
Beam Beam electronics Block diagram disc gated disc gate disc gated
Paul Dauncey Imperial College London
Presentation transcript:

Paul Dauncey, Imperial College London A couple of test items Paul Dauncey, Imperial College London 18 Oct 2007 Paul Dauncey

Monostable lengths Hits above threshold should give fixed length output pulse Given by monostable, common design to shapers and samplers Length of output pulse controlled by bias settings from DACs on Vladimir’s PCB I12_MSOBIAS1 and I34_MSOBIAS1 for shapers and samplers respectively Samplers also have reset monostable, which needs to be longer than the hit monostable; I34_MSOBIAS2 Ideally monostable hit length ~1.1 of BX period; balance efficiency against memory use Looked into the monostables in the bulk Thought they might be the cause of some of oddities seen by Jamie B 18 Oct 2007 Paul Dauncey

Monostables on test structures Jamie C measured monostable hit output on test structure Controlled by separate DACs Can see the length directly on a scope Minimum pulse ~180ns Default DAC=2048 gives pulse ~500ns 18 Oct 2007 Paul Dauncey

Monostables on bulk pixels Cannot measure directly; can only see hits in memory Count consecutive timestamps to measure “BX length” of hit for every channel Current firmware BX frequency is 2.5MHz (i.e. 40MHz/16) so BX period is 400ns Length in BX units Looks similar to test structure  DAC 18 Oct 2007 Paul Dauncey

Characterise slope Do rough fit to exponential of profile histogram Not “good” fit but robust 18 Oct 2007 Paul Dauncey

Uniformity is not good Plot exponential slope vs pixel location: 168*x+y Shapers are < 14112, samplers the rest X=000, Y=002 18 Oct 2007 Paul Dauncey

Sampler: did not change reset length Other pixels Sampler: did not change reset length 18 Oct 2007 Paul Dauncey

Reproduce at Imperial? Rerun with lower threshold and changing sampler resets Currently cannot get same result Even for good pixel 18 Oct 2007 Paul Dauncey

Implies a rate of >100Hz if running normally ~200 words DAQ speed Limited by data rate from sensor Implies a rate of >100Hz if running normally ~200 words 18 Oct 2007 Paul Dauncey