Temporary Capacity Restrictions: TCR WG & TCR tool

Slides:



Advertisements
Similar presentations
A Proposal for TEIN Organization (draft v2.0) 22 nd Jan 2007 Dr. ByungKyu Kim TEIN Org Task Force TEIN2 Technical Committee.
Advertisements

The HITCH project: Cooperation between EuroRec and IHE Pascal Coorevits EuroRec 2010 Annual Conference June 18 th 2010.
The Preparatory Phase Proposal a first draft to be discussed.
APPLICATION FORM OF ROBINWOOD SUBPROJECT SECOND STEP 1. The short listed Local Beneficiaries work together to create international partnerships and prepare.
Towards a European network for digital preservation Ideas for a proposal Mariella Guercio, University of Urbino.
Pilot project – Energy Trade Data Reporting Scheme 1 st Steering Committee Meeting Brussels, 5 October 2010.
Processus de Rabat / Rabat Process AURÉLIE SGRO PROJECT OFFICER ICMPD BRUSSELS MEETING ON “STRENGTHENING EVIDENCE-BASED POLICY MAKING IN THE FIELD OF MIGRATION”
Concept of Transparency Platform Martin Reisner Junior Adviser, Transparency ENTSOG’s Transparency Workshop Brussels – 11 September 2012.
NATO CCMS Pilot Study Meeting, Athens 2006 | Slide 1 Applying Innovative Land Remediation Johan van Veen (TNO) NATO CCMS Pilot Study Meeting Athens, June.
Status report on CJK NGN Working Group April 9, th CJK Standard Meeting Taesang Choi Chairman of CJK NGN Working Group.
Council of Europe workshop on the certification of e-voting systems Strasbourg, November 2009.
Progress report of the Working Group on the Value and Benefits of SAIs (WGVBS) 5 th meeting of the INTOSAI KSC Steering Committee 16 September 2013.
Results of the Working Group Meetings Civil Society (WG 2) & Regional Cooperation (WG 3) 2 nd Steering Group Meeting 28 th and 29 th March 2012.
Support to the Ministry of Education of the Republic of Azerbaijan for Further Adherence of the Higher Education System to the European Higher Education.
REWG activities in LILIIA MALON REWG Chair Prague
REPORTING SDG INDICATORS USING NATIONAL REPORTING PLATFORMS
TRANSFORMING OUR WORLD: THE 2030 AGENDA FOR SUSTAINABLE DEVELOPMENT
EU Implementation Programme
GEOSS Data Sharing Principles
Redesign of the International Timetabling Process (TTR)
S&TT structure 13 September 2017.
MAES Working Group Meeting Brussels
TAF/TAP workshop Brussels, September 2017.
TTR IT Implementation Capacity Offer/Request/Allocation
DIME ITDG, Luxembourg 28 June 2016
WG 2.B Integrated River Basin Management
Content Management System
Redesign of the International Timetabling Process (TTR)
INSPIRE Maintenance and Implementation expert Group
Status report / Activity Plan of OBD Task Force
Guidelines on the management of farmland in Natura 2000
Overview of working draft v. 29 January 2018
QUALITY ASSURANCE NATIONAL REFERENCE POINT – the Romanian experience
Presenter: Marlize Pistorius/Gwen Lehloenya
Redesign of the International Timetabling Process (TTR)
Global Gender Statistics Programme
PCS Outlook PCS User Group 12th September 2018, Vienna.
Introduction to the training
PCS CCB Group 22nd February, 2017.
The role of the ECCP (1) The involvement of all relevant stakeholders – public authorities, economic and social partners and civil society bodies – at.
Redesign of the International Timetabling Process (TTR)
Performance Audit Subcommittee Project for ISSAI Level 4 review 66th INTOSAI Governing Board Meeting Vienna, November 5-7, 2014.
ICAO Aviation English Language Test Endorsement
PCS Day - Feedback 23th November 2016, Vienna.
ESS Standardisation State of play
AIM Global Strategy Air Navigation Procedures for AIM Seminar
CEF e-Invoicing Readiness Checker
PCS User Group 15th February, 2017.
Giuliano Amerini Unit E6 (Transport)
Retrospective report of the past year
Dissemination Working Group (DWG)
WP4 Proposed Structure of the Outcome “Tool Kit and Recommendations”
PCS Groups and Boards PCS Day 2016
TTR IT Landscape PCS-TTR Day Vienna, 21 November 2018.
PaP Product Definition
Work plan and next steps – RDE-LDV working group
The mandate to develop crime statistics
WISE & INSPIRE FloodsDirective
Natural water Retention Measures
ETS WG role and working methods
CAPACITY strategy & MODEL atlantic 2020 PILOT
Reportnet 3.0 Requirements Catalogue
PCS Team Introduction 22 November 2017.
Meeting of Water Directors Progress on Reporting and WISE
9th meeting of the Expert Group on Reporting (22 March 2011)
WG standards for data access/exchange
Marine Strategy Framework Directive reporting: progress and next steps
Document CWG-SFP-2/7-E 4 August 2017 Original: English
From the NDPHS Evaluation Team October 16th, 2013 Reykjavik
Presentation transcript:

Temporary Capacity Restrictions: TCR WG & TCR tool November 2017

23 12 8 10 today Main tasks: Projects: TCR Working Group TCR experts of all RNE members TTR WG 3 “Works” members RFC TCR Coordinators Main tasks: Provide a clear message about the fact that the only process that should exist is the one which is now in the set up process by RNE (and TTR) Create processes to coordinate TCRs (Suggestions for) Improvements of processes Establish European TCR network Ensure cooperation between TCR and TT groups Define measures in case of detected short term problems Projects: Organisation of project “TCR: workflow implementation” Development of web-based TCR tool Acts in the first stage of the TCR tool roll-out as the Change control board of the TCR tool. Agrees to a TCR workflow to harmonize all respective guidelines and involve all relevant stakeholders. Evaluation of the complete framework (e.g. Existing guidelines, legal framework (Annex VII), TTR process) Definition of required workflow steps Definition of involvement of the various stakeholders in the decision making process for the TCR process and tool Setup of meetings with efficient use of capacities (e.g. Using existing meetings) 2017 2017 2017 2018 2018 March September March October 23 12 8 10 today Constitutional Meeting 1st WG Meeting 2nd WG Meeting 3rd WG Meeting

TCR tool: Features & Strategy Notifications Filtering functions Coordination between IMs Geographical overview Information exchange Further developments: Technical Specs Jun `19 Pilots Dec `19 Roll-out finalized Nov `20 Roll-out European-wide network Specifications of interfaces to national systems Pilots successfully tested Pilots on RFC 1, 2, 3 5 basic requirements Dec 2018 Nov 2018 May 2018 Jan 2018 Dec 2017

TCR tool: View and Filtering Functions User can set their personal views, double-click on the TCR to get more details All available details are visible for every single TCR Actual process step of the TCR

TCR tool: Display TCRs on a Map User settings (different layers, maps, content, …) TCR Legend