Deep Crack Sealing with Chipseal

Slides:



Advertisements
Similar presentations
Aplikasi po wer point Mata kuliah aplikasi komputer.
Advertisements

Team Cleaning Made Easy. Why Team Cleaning Higher quality due to consistency of movement Increased predictability of results Less equipment Clear accountability.
Comparative Analysis of Emulsion and Hot Asphalt Cement Chip Seal Performance Douglas D. Gransberg, P.E., C.C.E. University of Oklahoma.
Module 4-2 : Joint Sealing
Chipseal Construction Section 37.2 Seal Coats.  Proper surface preparation  Use of right asphalt binder, asphaltic/polymer modified emulsion and clean.
Chapter 6 Chip Seals From… Maintenance Technical Advisory Guide (MTAG)
Your Roads The Future, Some History, and Alternatives For Wasco County April 23, 2013.
PAVEMENT MAINTENANCE II Part 1b: Chip Seal Construction Idaho Roads Scholar Program.
Pavement Maintenance II Part 1a: SurfaceTreatments Idaho Roads Scholar Program.
CE 515x Train Acceleration, Deceleration, and Impact on Capacity Initial Instructions Work in teams of 2 - Get a new team mate (i.e., one who is not your.
Success with Alternatives to Paving Mr. Chuck Fromelt Day County Highway Superintendent Webster, South Dakota.
Brainstorming & Project Management
Asphalt Rubber Seal Coats. How many cracks can you fill in one day?
Washington County Chip Seal Program Review Fall, 2011.
Travel Website Enhancement Project Project Update First Name Last Name.
Project Status Report Presenter Name Presentation Date.
Surface Treatment Multi Agencies Collaboration. Participating Agencies Oregon Department of Transportation Ona Beach Maintenance Section Rose Lodge Maintenance.
“resurfacing hotline” (512)
Multi-Layer Systems By Vadim Kravtsov Intermountain Slurry Seal, Inc 1.
WORKING TOGETHER TO ACHIEVE A COMMON GOAL 2013 CHIP SEAL PROJECT COOPERATION THE KEY TO SUCCESS.
Brainstorming & Project Management ENGR Brainstorming  Proposing new ideas  Free flowing exchange of ideas  No judgment  No decisions  Build.
Pavement Preservation Program Emily McGraw, PE February 23 and 24, 2015 – NCDOT & CAPA Workshop.
Chip Seal Best Practices by: Larry Galehouse, P.E., P.S., Director National Center for Pavement Preservation.
MICE HPRF Up-date Tim Stanley RAL – Testing 212 kW achieved from driver stage 4616 #1 at DL, ready for endstage 116 #2. Good experience, in tuning.
PHYS 101, Chapter 2 Homework 1.The graph shows the motion of a car stuck in stop-and-go freeway traffic. (a) If you only knew how far the car had gone.
Deschutes county road department otta seal gravel road conversion pilot project December 7, 2016 oaces chip seal workshop.
Houston Renewable Energy Group (HREG) Website Refresh Project Report
Town Road Survey - What You Should Know 1_24_17
Tara Burton Daniel Rothery Nick Billcliffe
Pierce County Pavement Preservation Program
City of Abilene Pavement Condition Survey 2017 Results and Discussion
EXPRESSWAY.
Project Plan <Publish Date>
Disaster Relief Distribution
Boulder Junction Town Road Improvement Project
Presenter Name Presentation Date
CONSTRUCTING STRAIGHT LONGITUDINAL JOINTS
Presenter Name Presentation Date
Project Name Company Name Presenter Name
Project Name Company Name Presenter Name
1. Welcome to Software Construction
Presenter Name Presentation Date
2018 Pavement Workshop May 23-24, 2018
JACKSON COUNTY Chip Seal Program
[Project Name] STEERING COMMITTEE UPDATE [Date]
WORKING TOGETHER TO ACHIEVE A COMMON GOAL 2013 CHIP SEAL PROJECT
Insert subhead here Project Status.
IS&T Project Reviews September 9, 2004.
Presenter Name Presentation Date
Surface Treatments #2.
Software Engineering I Fall 2017
UTILIZING GRINDINGS ON RURAL ROADS:
Software Engineering I Fall 2017
<Project Name> Milestone Summary Report
introducing MICHELLE SLY
Telling the time Half past.
Best Strategies For Tennis Game By Amedeo Macchiavelli.
Determine the Root Cause
Telling the time Half past.
Issue Logs I want to implement a project
Walker Street Reconstruction Project 25% Design Public Hearing
Presenter Name Presentation Date
Trillo Apparel Company Revised Delivery Plan
NRRA Pavement Workshop 2019
Project Name Company Name Presenter Name
Presenter Name Presentation Date
Project Overview.
Native American Webquest
PROJECT NAME YOUR LOGO PROJECT CODE: PROJECT MANAGER: DATE OF REPORT:
Key Activities/ Milestones
Presentation transcript:

Deep Crack Sealing with Chipseal Duane Myers 2013 Deep Crack Sealing with Chipseal

Project Overview Help this road survive without fresh asphalt for a few years while the overlay budget bounces back. What is the project about? We are trying to keep the road together for a few more years while the paving budget rebounds. This is a high traffic road with a 35 MPH speed limit. Postponing an overlay on this road will help get the road synchronized with the paving schedule for the surrounding area.

Various cracks throughout the 920’ section we sealed.

Here is a cut in the road for a basin.

Old utility cuts.

Current Status What progress has been made since the previous milestone? Which tasks have been completed? What issues have been resolved? What new issues have risen? * Is the project currently ahead of schedule, on track, or delayed? If delayed, what is the mitigation plan? We started out with the distributor spraying the alligatored section.

Here is the distributor applying oil on the alligator section. Press play

Here is the truck dropping rock for the cracks and it getting swept in. Click to play the movie

Issues and Resolutions Description of the issue How was it resolved? What and how did it impact the project? Time Cost Other We dribbled some of our ¼” out of a dump truck and swept the rock into the cracks.

Timeline Milestone 1 Date 1 Milestone 2 Date 2 Milestone 3 Date 3 This is right before the roller pressed the rock in.

Here goes the roller.

Dependencies and Resources Project Vendors Manufacturing Sales Engineering Remote Teams Here we sealed the deeper cracks and the rest will be sealed with the conventional top coat.

Here they are spraying oil on the cracks of an old utility cut.

More of the same around a Basin More of the same around a Basin. The crew used squeegee’s to move the oil where it needed to go.

There is rock and felt covering the basin lid to keep the oil out

Rolling.

This is the first lane of the final coat This is the first lane of the final coat. 3/8 chips are the typical size we use.

We had some bleed through everywhere we pre-sealed the cracks.

The heavy traffic cause some bleed through as well.

Here is the basin after the final coat.

Here is the utility cut after shot.

If we did this treatment again we would probably adjust the shot rate for the oil down.

This is after the final coat in an area with some cracking.

This is the after shot of the alligatored area.

Details The test area we did was 920’ long and 24’ wide counting both lanes. It took 3 hours for the crew to seal it. Total cost of the work including materials was $8500. A year and a half later the alligator section is still sealed up and keeping water out. Cosmetically the road isn’t as pretty but, the road will likely hold up for another 4 or 5 years in the worst sections.

Conclusion We will consider this treatment again for roads that are too far gone for a conventional chip seal to work. The biggest challenge to making this work is figuring out how to work it into the program so we don’t lose mileage for the rest of the program. The crew is already maintaining 80+ miles a year with chip sealing. It will be hard to keep doing that and work this type of treatment into the program without losing some miles.