Coldex disinstallation

Slides:



Advertisements
Similar presentations
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
Advertisements

19th – 20th of September 2007Cryogenic Expert Meeting at GSI, Jan Patrick Meier1/11 Cryogenic Experts Meeting at GSI, 2007 The SIS 100 Cryogenic Jumper.
Sept. 30, 2004 NIKHEF-1 Hans de Vries Status NIKHEF Mechanics Secondary vacuum box Bellows Vacuum system CO 2 cooling: Bart Verlaat.
Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
M. Jimenez AT/VAC Room Temperature (LSS) Vacuum Systems M. Jimenez.
TOTEM Collaboration Meeting, Feb. 2005, F. Haug, CERN Cooling System for TOTEM Friedrich Haug and Jihao Wu Cryogenics for Experiments CERN TOTEM Collaboration.
PSB H 0 -H - Injection: Sectorisation Analysis C.Pasquino, J. Hansen, P.Chiggiato LIU - PSB Ho-H- Injection Meeting 1.
Fcal upgrade for sLHC: Cryogenics modifications – TE-CRG/ C.Fabre 1 ATLAS FCal Upgrade for sLHC: Modifications to the Calorimeter Cryogenic.
LTC Extended days, 03 March’08 J.M. Jimenez, AT Vacuum Group LHC Vacuum commissioning J.M. Jimenez On behalf of AT-VAC.
Large-capacity Helium refrigeration : from state-of-the-art towards FCC reference solutions Francois Millet – March 2015.
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
SPS vacuum modification G.Vandoni SPS vacuum modification, 1.
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
July LEReC Review July 2014 Low Energy RHIC electron Cooling Roberto Than CRYOGENICS SYSTEM.
Workshop 12/04/2006AT/MTM SM18 Test Facility A. Siemko "Workshop on Test Facilities and measurement equipment needed for the LHC exploitation"
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Cryogenic update before Fermilab meeting (and after the helium tank review) Coordination meeting 6 th May 2015 K. Brodzinski HiLumi-LHC-CC-Cryo-PPT-18_v1.
ALICE-TRD gas system 1/4/2015R. Guida PH-DT-DI1. TRD gas system Few numbers:  Total number of modules/racks: 20 (max leak rate certified at construction.
Experimental Sectors Ray Veness / AT-VAC With many thanks to G.Foffano + W.Cameron TS/MME Patrick Lepeule / AT-VAC.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
Plan for test station Marta Bajko For the Technical Review of FReSCa2 June 2015 Saclay Paris.
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
ANKA Synchrotron Radiation Facility 1 S.Casalbuoni, E. Huttel, WP4 Coordination Meeting , CERN, Geneva, Switzerland EuroCirCol Kickoff Meeting,
A. Baldini PSI July 05 Overview of the experiment MEG is being built (Beam line, Magnet, LXe, DC, TC, Elect., Software) Delays in some items: O(months)
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
TE-CRG Activities D. Delikaris, TE-CRG.
17-18 December 2013 LARP VTF Workshop BNL Proposal 1 A.Marone
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Bruno Vullierme Sept LHC-CC09 - 3rd LHC Crab Cavity Workshop Slide 1 CRAB CAVITY INTEGRATION CRYOGENICS INSTALLATION.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
SPS High Energy LSS5 Thermal contact & cooling aspects
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
Status of the FAIR CCC and Cryostat
Vacuum System P. Chiggiato TE-VSC
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
ILC Cryogenics: Study of Emergency Action and Recovery - in progress -
Teleconf ACS – FREIA 28th March 2017
High energy beam transport.
St. George Infrastructure
IT-4189 Supply and installation of a cryogenic distribution system
Brief Status SPS Prototype PSB Prototype Installed in LS1
BA6 – crab cavity activities in EYETS
Installation of an Instrument on a CERN machine
Gas System Commissioning
AD consolidation activities in LS2
SPS - EYETS 2016/17 Vacuum systems planning
SPS cryogenic proximity equipment and SM18 validation
S. Claudet, Daniel Berkowitz & A. Perin (TE-CRG)
Development of the pellet target in ITEP
Renovation of the 45-year old PS magnets
From Design to Installation courtesy R. Folch S. Atieh TS / MME
SPS East Extraction bump inhibit during COLDEX operation
Question 1) Are two ports current leads?
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
TEST PLANS for HL LHC IT STRING
CONSOLIDATION CPS-BL SYSTEM
XFEL Bunch Compressor BC1 and BC2 Vacuum Issues
MERIT Review Meeting Cryogenics BNL, NY Dec. 12, 2005 Friedrich Haug
BLM internal review M.Hodgson
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
Conceptual design of the Cryogenic System of Comprehensive Research Facility for Key Fusion Reactor Core Systems Liangbing Hu Sep.4.
Cryogenic upgrade of B165 CRG Status Meeting 16th may 2019
Presentation transcript:

Coldex disinstallation 4/12/2009 G.Vandoni@CCinS

COLDEX – the history Designed in 1994 as simulation of a LHC vacuum chamber. Constructed at NIKHEF and delivered in 1997 after acceptance tests. Installed successively in EPA, in 2 different lines, in synchrotron radiation then positron and electron beams, between 1999 and 2001 Installed in b.113 for cryosorber studies with gas injection, 2001. Installed in SPS in 2002 close to the WAMPAC calorimeter, to measure heat loads and pressure dynamics induced by electron cloud in LHC type beams A modular, versatile test-bench, simulating an extended vacuum chamber at cold. Operated with 20,000l dewar or refrigerator. Recuperation for further studies (LHC related) is highly attractive, if not yet necessary If CC is NOT installed in BA4, COLDEX should stay in place 4/12/2009 G.Vandoni@CCinS

Coldex in BA4 Drift bypass WAMPAC Y-chambers Translation tables 4/12/2009 G.Vandoni@CCinS

Coldex schematic layout Coldex cryostat Phase separator 50l Gas injection system Reference chamber with vacuum equipment Vacuum and helium pumps 4/12/2009 G.Vandoni@CCinS

Coldex mechanical layout Vacuum sector valves 4/12/2009 G.Vandoni@CCinS

Disinstallation steps Uncabling Removal of ancillary equipment (helium pumping, primary vacuum pumps, bakeout racks, local power supplies, cable trays) → see 7 Removal of flexible transfer lines Stripping of experiment core: bellows, etc Removal of adjustment tables, substitution by temporary supports Disconnection of Coldex (4m) from Y-chambers Removal of Coldex Removal of Y-chambers Removal of Wampac Preliminary time estimation: >2 weeks 4/12/2009 G.Vandoni@CCinS

Environment 4/12/2009 G.Vandoni@CCinS

Re-installation steps Installation of replacement drift section Recuperation of 2 VVSB sector valve (make 1 sector out of two, install a VVSA) → Spares 30kCHF to HiRadMat budget Modification of controls, PVSS supervision or Leave vacuum sectorization as, it is, blocking 2 expensive VVSB valves, but nothing to be done on vacuum controls Recuperation for CC Refrigerator Transfer lines? To negociate with Coldex owners… Translation tables? 0.5 tons versus 5 tons 4/12/2009 G.Vandoni@CCinS

To conclude… Removing Coldex and substituting it with a drift section is possible However, LHC has not delivered all possible problems yet, so if CC is not installed in BA4 Coldex should remain in place Disinstallation should take recuperation into account: quite long disintallation project with respect to shutdown times (2-3 weeks, to be better evaluated with Coldex experts) 4/12/2009 G.Vandoni@CCinS