Severn Tidal Power Feasibility Study

Slides:



Advertisements
Similar presentations
Severn Estuary Tidal Energy 1.Call for Proposals 2.Initial Assessment of Options 3.Next Steps 19 September 2008 – Severn Estuary Partnership, Penarth Peter.
Advertisements

Commission on Sustainable Development in the South East Managing Floods and Droughts: Water in the South East 30 th November 2004 University of Westminster.
Dr Chris Boomer Development Plans Manager (DoE Northern Ireland)
BWEA OFFSHORE CONFERENCE 17 – 18 APRIL 2002 Offshore Consents Planning for the Future Nigel Peace Director, Energy Regulation Department of Trade & Industry.
Barrage or What? Engineering Options Prof Colin Taylor CEng FICE Professor of Earthquake Engineering Head, Department of Civil Engineering
Severn Tidal Energy The Cardiff/Weston Barrage – Context and Implications Peter K Jones – Environmental Policy Officer.
Patrick Kearon The Bristol Port Company
Managing Marine Conservation Zones Dr Angela Moffat Marine Bill Project Manager Natural England
UNCLASSIFIED Department of Economic Development, Jobs, Transport and Resources Victorian Energy Efficiency Target Forum 16 April 2015 Village Roadshow.
Somerset County Council Climate Change Strategy Abigail Stretch Sustainable Development Officer.
Low Carbon Energy Futures workshop Alison Lax Project Manager – Low Carbon Communities.
Severn Tidal Power – a proposal A Barrage of Issues.
Severn Tidal Power Feasibility Study Background to the study Terms of reference announced in January 08 Aim of the study: To enable Government to decide.
COastal REsearch & POlicy INTegration Working Together for Coastal Planning around the Severn Estuary Dr Tim Stojanovic, Cardiff University/COREPOINT project.
Regional Flood Plain Management Council April 15, 2015 H-GAC December 2nd.
Severn Estuary Tidal Energy Sustainable Development and Severn Tidal Power 7 March 2009 Peter Kydd Director of Strategic Consulting Parsons Brinckerhoff.
Natural England State of the Natural Environment, Strategic Direction refresh, and Manifesto Dr Helen Phillips, Chief Executive, Natural England.
Marine Planning: The role of the MMO and Partnerships Steve Brooker Head of Marine Planning.
Severn Tidal Power Feasibility Study Severn Estuary Forum 2009 Juliet Austin – Environmental workstream lead, STP study, Department of Energy & Climate.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
Hannah Burke & Steven Payne. The Severn Estuary The Severn estuary has a lot of potential for harnessing a large quantity of energy, it is one of the.
Philip Wright Head of Climate Change and Air, ERAD Changing our Ways Executive action on climate change.
The Severn Barrage Presentation to Severn Estuary Forum 8th June 2006
Environment SPC 24 th June 2015 New Climate Change Strategy.
EEC3 – The Way Forward Presentation to NIA Annual Conference 12 December 2006 By Iris Rooney, Defra.
Investing in our common future Co-financed with the support of the European Union ERDF – Atlantic Area Programme Comparison of Hydro-environmental Impacts.
Planning Scotland’s Seas consultation Seas Consultation 2013.
Marine Planning since 2011 Linda Rosborough – Director of Marine Scotland.
Nigel Hannam and David Phillips Parish Conference – 11th September 2013 Balancing Development.
Strategic Environmental Assessment (SEA) A Scottish replacement to Air Passenger Duty (APD) Elaine McCall Environmental Assessment Team The Scottish Government.
COLLABORATION IN CLIMATE POLICY ASSESSMENT:IRELAND AT RISK(Homework 6)
Policy workstreams Craig Mallett Miriam Eagle.
Allington Waste Management Facility
The JMWP Consultation Visit frackfreeyork.org.uk for a link to the consultation page Download parts A and B of the publication response form if you plan.
Equality and Human Rights Exchange Network
EWG Study Tour, Galway, 18/09/2006
Somewhereville town centre regeneration - EXAMPLE
Toronto Waterfront Scan and Environmental Improvement Strategy Project - Economic Opportunity in a Sustainable Waterfront Presentation to the Federation.
BESTF Webinar Wednesday, 12th December, 2012 Merlin Goldman, High Value Manufacturing team Graham Mobbs, International team Ewa Bloch, National Contact.
Affordable Energy Production from Renewable Fuel
More power to the Northern Powerhouse
Energy and Climate Policy Scotland’s Energy Strategy and Climate Change Plan Neal Rafferty Energy and Climate Change Directorate.
The Vision for Sport in Wales
Conducting business the right way
Local Asset Management Pilots Scheme
CP3 GP6 Regional Planning Guidelines PP3 – Mid-West Regional Authority
Species at Risk (SAR) Legislation & Program Renewal Project
Strategies Achieving our Goals
NEPAL ADMINISTRATIVE STAFF COLLEGE Project Appraisal: Group Works
SEVERN TIDAL ENERGY SCHEMES IMPLICATIONS FOR WILDLIFE
Slaughden SMP Policy Review
Progress of the preparations for a White Paper on Adaptation to Climate Change Water Directors’ meeting Slovenia June 2008 Marieke van Nood, Unit.
GCF business model.
Work Programme 2012 COOPERATION Theme 6 Environment (including climate change) Challenge 6.1 Coping with climate change European Commission Research.
VENUE: COMMITTEE ROOM 3 DATE: 27 MAY 2015 TIME: 09:00-13:00
DG Environment, Nature Protection Unit (D3)
Social & Economic Impacts
Severn Tidal Power Sustainable Development and Severn Tidal Power
A Blueprint to safeguard Europe’s waters
Addressing the challenge of water scarcity and droughts
Strategic Appropriate Assessment of Spatial Plans
Wind energy & EU legislation for Nature conservation
Jacques Delsalle, DG Environment, Unit D.1
Independent Practitioner Chartered Society of Physiotherapy Council
Water scarcity and droughts
The EU Strategy for Adaptation to climate change
Stakeholder Engagement
UK experience of Programmes of Measures
Industrial Value Chain: A Bridge Towards a Carbon Neutral Europe
Philip Nugent Marine Spatial Planning
Presentation transcript:

Severn Tidal Power Feasibility Study

Background to the study Terms of reference announced in January 08 Aim of the study: To enable Government to decide whether it could support a tidal power scheme in the Severn Estuary and if so on what terms? Focus is on tidal range technologies as this is where the main resource of the Estuary lies Study expected to last 2 years with public consultation after each phase: Phase 1 (2008): high level issues, scheme options appraisal, and scope of Strategic Environmental Assessment and other work Phase 2 (2009-10): Strategic Environmental Assessment, and analysis of costs, risks, benefits and overall impact assessment Severn tidal power is being considered against the alternative options for meeting UK goals including energy saving, nuclear and other renewable sources

Why do the study? Two key energy imperatives: tackling climate change, and ensuring a secure supply of energy In helping to meet these challenges, Government has committed to: Reduce UK greenhouse gas emissions by 80% by 2050 Produce 15% of our UK energy from renewable resources by 2020 The huge tidal resources of the Severn Estuary could make a significant contribution Providing long term access to a renewable, indigenous energy resource Significant CO2 savings annually and contributing to UK’s renewable energy targets Helping to reduce UK’s dependency on imports of gas Generating positive economic and employment benefits But it has costs, risks and disadvantages as well that must be factored in to any decision

Feasibility Study Workstreams Environment: impacts on biodiversity and wildlife, flood management, geomorphology, water quality, landscape, compliance with environmental legislation Engineering and Technical: options appraisal, costs, design and construction, grid linkage, supply chain Economic: financing, ownership, energy market impacts Regional: impact on economy and society Planning and consents: regulatory compliance Stakeholder engagement and communication

Map of proposed options

Environmental Impacts Progress so far… Environmental Impacts Scheme would slow the tides: high tides behind it would fall by approx. 1 metre, and low tides would be higher. Scheme would reduce designated inter-tidal areas, displacing protected bird species and threatening migratory fish. Scale of impact varies between the different schemes. Work is underway to assess these impacts and how far they could be mitigated. Otherwise, they must be compensated for under environmental legislation. A scheme is not likely to affect upstream fluvial flooding (such as those in Tewkesbury in 2007). Some schemes could help protect against storm surge flooding from the sea. Further work is considering the impact of reduced tides on the suspended sediment in the water and on water quality.

Regional Economic Impacts Progress so far… Regional Economic Impacts Initial assessment completed, focussing on whether schemes could result in significant impacts on South West England and Wales Considered direct and indirect impact of construction and operation on jobs and regional economy Sectors considered include construction, transport, fishing, tourism, accommodation, residential and population, land use and planning Study concluded that there will be gains and losses for South West England and Wales, but on balance the picture is likely to be positive Net benefits are proportionate to scale of the scheme Currently scoping the further work that needs to be done in phase 2

Proposed shortlist of 5 schemes Beachley Barrage Bridgwater Bay Lagoon Cardiff-Weston Barrage Fleming Lagoon Shoots Barrage

Map of proposed shortlist

Embryonic technologies Schemes proposed for the shortlist are those we believe could be feasible Some schemes, such as a tidal reef and tidal fence, are not sufficiently developed for more detailed analysis, but may be less environmentally damaging than proven technologies New £500k fund has been launched by Defra, Welsh Assembly Government and South West RDA to support the development of embryonic technologies Details of scope, funding criteria and timescale being worked up with partners Embryonic technologies supported by this innovative technologies fund will be taken into account before decisions are taken on whether to go ahead with a Severn tidal power scheme

What we’re doing now… The consultation Before any decision can be taken on whether or not to support a Severn tidal power scheme, there is much more work and evidence gathering to be done To help inform this further work, a public consultation was launched on 26 January in Bristol to seek views on: - the process by which the long-list of schemes have been short listed - the proposed short list of schemes for further investigation - the issues for further study, including the scope of the Strategic Environmental Assessment Public consultation period is 12 weeks, with the closing date on 23 April 2009

What’s next? Phase 2 (now – 2010): Further studies on the impact of the various shortlisted schemes, including work on supply chain, impact on energy markets and grid studies, costs and engineering aspects, financing options, impact on regional economies, and an SEA on the environment and social impacts. Examine shortlisted schemes compliance with environmental legislation and suggest ways in which adverse environmental effects could be mitigated or compensated for. 2010 Second public consultation on the evidence gathered and analysis done, in order to inform the decision to proceed, the terms of proceeding, and a single preferred option. Embryonic technologies supported by the innovative technologies fund will be considered again at this stage.

Further Information General information on the study can be found at: www.decc.gov.uk/severntidalpower To read and download the evidence gathered in phase 1 and to take part in the consultation: http://severntidalpowerconsultation.decc.gov.uk To contact the central team within DECC: severntidalpowerunit@decc.gsi.gov.uk