FFM TC status Thinh Nguyenphu as FFM TC Chair NSN

Slides:



Advertisements
Similar presentations
Hierarchy of Documents for Earth Observation Summit III Overview for GEO-4 April 2004 GEO Co-Chairs.
Advertisements

PbD-SE Technical Committee First Meeting December 05, 2012.
OASIS OSLC CCM TC Inaugural Meeting 04 February /04/14OASIS Presentation to OSLC CCM TC.
Planning DITA 1.3 Kristen James Eberlein Eberlein Consulting.
April 19, 20003GPP2 report 3GPP2 Steering Committee TSG-A report DRAFT Seoul, Korea April 19, 2000.
OData Technical Committee Kick-off July 26, 2012.
TOSCA Technical Committee Kick-off December 12, 2011.
Proposed TOSCA TC Timeline March 1, TC Deliverables Standards Track Work Products – “…is a Work Product produced and approved by a TC in accordance.
For internal use only 1© Nokia Siemens Networks R 255 G 211 B 8 R 255 G 175 B 0 R 127 G 16 B 162 R 163 G 166 B 173 R 137 G 146 B 155 R 175 G 0 B 51 R 52.
IEEE Learning Technology Standards AICC MEETING – FEB 2004.
For internal use only 1© Nokia Siemens Networks R 255 G 211 B 8 R 255 G 175 B 0 R 127 G 16 B 162 R 163 G 166 B 173 R 137 G 146 B 155 R 175 G 0 B 51 R 52.
CMIS4DAM TC Inaugural Meeting 03 December /03/14OASIS Presentation to CMIS4DAM TC.
TOSCA Technical Committee Kick-off December 12, 2011.
Revised TOSCA TC Timeline Analysis and Candidate September 20, 2012.
SunSatFriThursWedTuesMon January
OASIS Odata Technical Committee First Face-To-Face Meeting, July 26/27, Redmond WA.
Remote Pet Feeder Project Status Update Team member1 Team member2 Team member3 Team member4 9 February 2016.
API 19 CI Chemical Injection Devices for Downhole Applications
API 19 CI Chemical Injection Devices for Downhole Applications
OASIS OSLC CCM TC Inaugural Meeting 04 February 2014
OASIS TC Process Overview
ETSI NFV: IFA & SOL specifications list
OASIS Electronic Trial Master File Standard Technical Committee Meeting Agenda June 20, :00 – 9:30 AM PDT.
OCPP TC Inaugural Meeting 07 September 2016
NANC Report Numbering Oversight Working Group (NOWG)
OASIS eTMF TC Inaugural Meeting 16 December 2013
Sub-1 GHz Study Group Closing Report Sept 2018
OASIS Overview TC Process
doc.: IEEE <doc#>
OASIS Overview TC Process
CSAF TC Inaugural Meeting 16 November 2016
API SC6 Valves and Wellhead Equipment
SARIF TC Timeline Proposed, approximate.
FFM TC status Thinh Nguyenphu as FFM TC Chair NSN
doc.: IEEE <doc#>
OASIS OSLC Core TC Inaugural Meeting 12 November 2013
doc.: IEEE <doc#>
OASIS Overview TC Process & Administration
Continuum of Care Metropolitan Homelessness Commission
TC Process Specification Flow
OSLC Domains TC Inaugural Meeting 30 September 2016
FFM TC status Thinh Nguyenphu as FFM TC Chair NSN
ARIP TC Inaugural Meeting 22 May 2015
OASIS Overview TC Process
CTI TC Inaugural Meeting 18 June 2015
doc.: IEEE <doc#>
Legal Citation Markup TC Inaugural Meeting 12 February 2014
Liaison Report Date: Author: Jan 2008 Month Year
AWG 20 April 2012 Candidate Topics
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
NANC Report Numbering Oversight Working Group (NOWG)
OSLC PROMCODE TC Inaugural Meeting 26 March 2014
doc.: IEEE <doc#>
OASIS Common Security Advisory Framework (CSAF) Technical Committee Monthly Call January 25, 2016.
IBOPS TC Inaugural Meeting 23 September 2014
doc.: IEEE <doc#>
OSLC Automation TC Inaugural Meeting 25 March 2014
COEL TC Inaugural Meeting 15 July 2015
BIOSERV TC Inaugural Meeting 08 July 2015
doc.: IEEE <doc#>
IEEE P Wireless RANs Date:
OASIS VIRTIO TC Inaugural Meeting 30 July 2013
IEEE Revision Timeline
November 2018 Opening Report
Review plan of the nature reporting – update 6
Motion – P Rev/D3 to RevCom
Attribute Definitions for Business Mission Specific Work Group (MSWG)
LegalRuleML F2F 2014.
IT Managed Services Transition Weekly Activity Report: June 11th, 2019
Nov 2018 Sub 1 GHz Study Group Date: Authors: Nov 2018
Presentation transcript:

FFM TC status Thinh Nguyenphu as FFM TC Chair NSN thinh.nguyenphu@nsn.com December 19, 2011 Presentation / Author / Date

TC Charter & Discussion of Contribution work Standard Track Lifecycle Field Force Management Integration Interface (FFMII) Specification Domain model, functional and interface descriptions, and Data Model. Protocol binding specification Related technical artifacts (e.g. data models and machine-readable API descriptions) Non-Standard Track Lifecycle Field Force Management Integration Interface Overview Business Driver, Use Cases, and Feature Requirements Presentation / Author / Date

Schedule: Field Force Management Integration Interface (FFMII) Specification Standard Track Deliverable #1: Field Force Management Integration Interface (FFMII) specification: Working Draft (WD) Start: Week 26, June 27, 2011 Status: 98% completion. Next Step: Creating all of XSD files in 6 weeks. Committee Specification Draft (CSD) Start: Week 07, Feb 13, 2012 Committee Specification Public Review Draft (CSPRD) Week 07, Feb 13, 2012 Committee Specification (CS): Week 15, April 9, 2012 Candidate OASIS Standard (COS): TBD OASIS Standard Approval Ballots: TBD Presentation / Author / Date

Schedule: FFM Overview Committee Note Non-Standard Track: Deliverable #2: FFMII Overview (business driver, design goals, use cases, model solutions): Add new use case New use case completed by 30 January 2012 meeting Revised Committee Note Draft (CND) Start: Start: Week 6, February 6, 2012 Revised Committee Note Public Review Draft (CNPRD) Start: Week 6, February 6, 2012 Ballot, week 12, Mar 19, 2012 (allows 6 weeks for Public review) Committee Note (CN): Week 13, Mar 26, 2012   Presentation / Author / Date