TGs Closing Report Date: Authors: January 2006 January 2006

Slides:



Advertisements
Similar presentations
Doc.: IEEE P /823r0 Submission May 2007 Donald Eastlake 3rd, MotorolaSlide 1 TGs Montreal Closing Report Notice: This document has been prepared.
Advertisements

LB84 General AdHoc Group Sept. Closing TGn Motions
[ Interim Meetings 2006] Date: Authors: July 2005
VTS SG Montréal Closing Report
LB73 Noise and Location Categories
LB73 Noise and Location Categories
TGs Process Date: Authors: November 2005 November 2005
Waveform Generator Source Code
TGu Closing Report Date: Authors: November 2005
TGs Montreal Closing Report
March 2014 Election Results
TGs September 2005 Mid-week Report
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
TGs London Closing Report
TGs London Closing Report
Motion to accept Draft p 2.0
TGs January Final Report
[place presentation subject title text here]
[place presentation subject title text here]
TGp Closing Report Date: Authors: March 2006 Month Year
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
[place presentation subject title text here]
TGs Melbourne Closing Report
TGp Closing Report Date: Authors: March 2006 Month Year
SEE-Mesh / Wi-Mesh Proposals Merger Report
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGv Redline D0.06 Insert and Deletion
TGs San Diego Closing Report
TGs July Closing Report
ADS Study Group Mid-week Report
Selection Procedure Recommendation
Spectrum Sensing Tiger Team
TGu-changes-from-d0-01-to-d0-02
September Opening Report
LB73 Noise and Location Categories
EC Summary of PAR Development
TGs Process, July Date: Authors: July 2006 July 2006
TGy draft 2.0 with changebars from draft 1.0
TGs January Final Report
TGv Redline D0.10 Insert and Deletion
TGs Dallas Closing Report
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
TGp Closing Report Date: Authors: March 2007 Month Year
TGr Proposed Draft Revision Notice
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
March Opening Report Date: Authors: March 2011
May 2005 CAPWAP AHC Closing Report
TGs Denver Closing Report
[ Policies and Procedure Summary]
TGs Denver Closing Report
TGu Closing Report Date: Authors: January 2006 January 2006
Draft P802.11s D1.03 WordConversion
January Opening Report
TGu-changes-from-d0-04-to-d0-05
TGu-changes-from-d0-03-to-d0-04
TGu Motions Date: Authors: May 2006 May 2006
TGs September Closing Report
TGs November Closing Report
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGr Proposed Draft Revision Notice
TGs March Mid-Week Report
Selection Procedure Recommendation
TGp Motions Date: Authors: January 2006 Month Year
Presentation transcript:

TGs Closing Report Date: 2006-01-19 Authors: January 2006 January 2006 doc.: IEEE 802.11-06/198r0 January 2006 TGs Closing Report Date: 2006-01-19 Authors: Notice: This document has been prepared to assist IEEE 802.11. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.11. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair <stuart.kerry@philips.com> as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.11 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

January 2006 doc.: IEEE 802.11-06/198r0 January 2006 Abstract Report of TGs, ESS Mesh Networking Task Group, to the January, 2006 (Waikoloa, Hawaii) closing 802.11 Plenary. TGs Motto: Perfection is achieved not when there is nothing left to add but when there is nothing left to take away. Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

TGs Closing Plenary Report January 2006 doc.: IEEE 802.11-06/198r0 January 2006 TGs Closing Plenary Report An annotated agenda is available in 11-05/1265r6. The minutes are or will be uploaded as 11-06/77r0. Due to progress towards merger and substantial agreement between the “SEE Mesh” and “Wi-Mesh Alliance” proposals, TGs voted to suspend its down selection process until the March meeting. At that meeting it is expected that a Confiramtion vote will be held on the merged proposal. See 11-05/597r19 and “SEE-Mesh / Wi-Mesh Proposals Merger Report”, 11-06/192r0 One technical presentations not related to a proposal were received: “The Mesh Security Problem”, 11-06/188r0 Donald Eastlake 3rd, Motorola Donald Eastlake 3rd, Motorola

TGs Closing Plenary Report (continued) January 2006 TGs Closing Plenary Report (continued) One TGs teleconference has been scheduled between the January and March meetings to discuss the March agenda: 11:00am Eastern US time, Wednesday, 22 February 2006 Goals for the March meeting in Denver, CO: A confirmation vote on the merger proposal. Adoption of a D0.01 Draft. Refinement of that Draft. Donald Eastlake 3rd, Motorola