L1Calo Joint Meeting Introduction

Slides:



Advertisements
Similar presentations
Uli Schäfer Trigger Status JEP (JET/ENERGY PROCESSOR) Komponenten JEM0 (JET/ENERGY MODULE) -Hardware -Firmware JEM1 nächste Tests / Termine Production.
Advertisements

Digital Filtering Performance in the ATLAS Level-1 Calorimeter Trigger David Hadley on behalf of the ATLAS Collaboration.
8 th Workshop on Electronics for LHC experiments - Colmar- September 9 th -13 th 2002Gilles MAHOUT Prototype Cluster Processor Module for the ATLAS Level-1.
L1Calo – towards phase II Mainz upgraders : B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz, U.Schäfer, C.Schröder, E.Simioni, S.Tapprogge.
High-speed optical links and processors for the ATLAS Level-1 Calorimeter Trigger upgrade B.Bauss, V.Büscher, R.Degele, A.Ebling, W.Ji, C.Meyer, S.Moritz,
ATLAS L1 Calorimeter Trigger Upgrade - Uli Schäfer, MZ -
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
JEM upgrades and optical data transmission to FEX for Phase 1 Andi E. & Uli S. Uli Schäfer 1.
Uli Schäfer, Mainz Univ. / ATLAS L1 Calorimeter Trigger ATLAS L1 Calorimeter Trigger / DCS ATLAS L1 Calorimeter Trigger Overview Signals monitored by DCS.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
Samuel Silverstein Stockholm University L1Calo upgrade hardware planning + Overview of current concept + Recent work, results.
Uli Schäfer 1 JEM: Status and plans Pre-Production modules Status Plans.
Samuel Silverstein Stockholm University L1Calo upgrade discussion Overview Issues  Latency  Rates  Schedule Proposed upgrade strategy R&D.
Tony Gillman ASSO - 16 October 2001 ASSO - Level-1 Calorimeter Trigger Cluster and Jet/Energy Processors l Overview l Deliverables l Programme organisation.
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
CMX (Common Merger eXtension module) Y. Ermoline for CMX collaboration Preliminary Design Review, Stockholm, 29 June 2011.
Atlas L1Calo CMX Card CMX is upgrade of CMM with higher capacity 1)Inputs from JEM or CPM modules – 40 → 160Mbps (400 signals) 2)Crate CMX to System CMX.
1 1 Rapid recent developments in Phase I L1Calo Weakly 25 Jul 2011 Norman Gee.
L1Calo Intro Cambridge Group, Dec 2008 Norman Gee.
April CMS Trigger Upgrade Workshop - Paris1 Christian Bohm, Stockholm University for the L1 calorimeter collaboration The ATLAS Trigger Upgrade.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
CMX status Yuri Ermoline for the MSU group Mini-TDAQ week, CERN, 9-11 July 2012,
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
CMX Hardware Overview Chip Brock, Dan Edmunds, Philippe Yuri Wojciech Michigan State University 19-May-2014.
The ATLAS Global Trigger Processor U. Schäfer Phase-2 Upgrade Uli Schäfer 1.
5 February 2003Paul Dauncey - Calice Status1 CALICE Status Paul Dauncey Imperial College London For the CALICE-UK groups: Birmingham, Cambridge, Imperial,
Mark Thomson University of Cambridge WP6: L1Calo Upgrade.
New L2cal hardware and CPU timing Laura Sartori. - System overview - Hardware Configuration: a set of Pulsar boards receives, preprocess and merges the.
12 th Workshop on Electronics for LHC experiments - Valencia- 25 th - 29 th Sept. 2006Gilles MAHOUT Production Test Rig for the ATLAS Level-1 Calorimeter.
Calorimeter Digitisation Prototype (Material from A Straessner, C Bohm et al) L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment is one of the four major experiments operating at the Large Hadron Collider.
ALIBAVA system upgrade Ricardo Marco-Hernández IFIC(CSIC-Universidad de Valencia) 1 ALIBAVA system upgrade 16th RD50 Workshop, 31 May-2 June 2010, Barcelona.
Hardeep Bansil (University of Birmingham) on behalf of L1Calo collaboration ATLAS UK Meeting, Royal Holloway January 2011 Argonne Birmingham Cambridge.
L1Calo Installation Status Murrough Landon, QMUL Level-1 Calorimeter Trigger (University of Birmingham, University of Heidelberg, University of Mainz,
ATLAS and the Trigger System The ATLAS (A Toroidal LHC ApparatuS) Experiment [1] is one of the four major experiments operating at the Large Hadron Collider.
L1Calo News Activity Summary, Run coordination and Operation Planning Bruce M. Barnett Rutherford Appleton Laboratory.
Samuel Silverstein, SYSF ATLAS calorimeter trigger upgrade work Overview Upgrade to PreProcessor MCM Topological trigger.
Samuel Silverstein, Stockholm University For the ATLAS TDAQ collaboration The Digital Algorithm Processors for the ATLAS Level-1 Calorimeter Trigger.
L1Calo Databases ● Overview ● Trigger Configuration DB ● L1Calo OKS Database ● L1Calo COOL Database ● ACE Murrough Landon 16 June 2008.
L1 Technical Proposal: Phase 2 ● Slow progress on writing TP phase 2 – Distractions with beam and calibration – Also some things are still unclear ● Hence.
Phase2 Level-0 Calo Trigger ● Phase 2 Overview: L0 and L1 ● L0Calo Functionality ● Interfaces to calo RODs ● Interfaces to L0Topo Murrough Landon 27 June.
Multi-step Runs – an L1Calo Perspective
Rainer Stamen, Norman Gee
Online Database Work Overview Work needed for OKS database
ATLAS calorimeter and topological trigger upgrades for Phase 1
L1Calo Joint Meeting Introduction
L1Calo Joint Meeting The beginning…
Present System Back-end Front End PMT ROS Optical links ADC Pipeline
Demonstrator Slice Possibilities and Timetable
L1Calo Phase-1 architechure
J. R. A Booth, D. G. Charlton, C. J. Curtis, P. J. W. Faulkner, S
L1Calo upgrade discussion
ATLAS L1Calo Phase2 Upgrade
Online Software Status
Remaining Online SW Tasks
Test-rigs outside CERN
Online Software “To Do” List
Possibilities for CPM firmware upgrade
Run-2  Phase-1  Phase-2 Uli / Mainz
Testing the PPrASIC Karsten Penno KIP, University of Heidelberg
Level-1 Calo Monitoring
ATLAS: Level-1 Calorimeter Trigger
Joint Meeting Wrap-up I’ve cheated Partially justified?
The ATLAS First Level Calorimeter Trigger
TDAQ commissioning and status Stephen Hillier, on behalf of TDAQ
Commissioning of the ALICE-PHOS trigger
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
(Not just) Backplane transmission options
Presentation transcript:

L1Calo Joint Meeting Introduction Several Views of L1Calo 25/03/2009 L1Calo Joint Meeting 25th-27th March 2009

L1Calo Joint Meeting 25th-27th March 2009 L1Calo: Architecture Digitized Energies Cluster Processor 56 modules Merging 8 modules Features: Realtime Path: Fixed Latency Pipelined Many stage processing Massive parallelism Dual purpose modules Heavily FPGA based Merged Results To CTP Calorimeter Signals Readout Driver (ROD) 14 modules Data Region of Interest ROD 6 modules Interest Data Preprocessor 124 modules Jet/Energy Processor 32 modules Merging 4 modules Real-time Data Path Five Types of Custom 9U Modules PPM CPM JEM CMM ROD 25/03/2009 L1Calo Joint Meeting 25th-27th March 2009

L1Calo: Hardware It’s not just about modules cables, fibres, racks, power supplies, PCs, firmware… 25/03/2009 L1Calo Joint Meeting 25th-27th March 2009

L1Calo Joint Meeting 25th-27th March 2009 L1Calo: Operation September 10th around 10:30 The night before around 05:00 Last Saturday, around 21:00 25/03/2009 L1Calo Joint Meeting 25th-27th March 2009

L1Calo Joint Meeting 25th-27th March 2009 L1Calo: Trigger 25/03/2009 L1Calo Joint Meeting 25th-27th March 2009

L1Calo: Status The system is already working very well But much tuning is still needed Last few hardware/firmware bugs Software improvements Timing calibration Energy calibration Trigger operation and monitoring Physics performance Upgrade work becoming urgent Slide almost identical to last time… Lots of progress, but not finished yet 25/03/2009 L1Calo Joint Meeting 25th-27th March 2009

L1Calo Joint Meeting 25th-27th March 2009 L1Calo: Collaboration Argonne National Laboratory, USA Cambridge, UK Michigan State University, USA 9 L1Calo consists of six institutes Birmingham, UK Heidelberg, Germany Mainz, Germany Queen Mary, UL, UK RAL, UK Stockholm, Sweden 25/03/2009 L1Calo Joint Meeting 25th-27th March 2009

L1Calo Joint Meeting 25th-27th March 2009 L1Calo: People That’s you 25/03/2009 L1Calo Joint Meeting 25th-27th March 2009

L1Calo Joint Meeting 25th-27th March 2009 L1Calo: Meeting Wednesday AM: Current Hardware Review PM: Current Activities Review Management Meeting Group meal (at Cosener’s) Thursday and Friday (Norman) Upgrade and Discussions Upgrade Management Meeting Note to speakers: Make sure work background is clear Try to avoid L1Calo jargon All sessions in this room (and on EVO) Meeting Logistics Fees Transport Ask David Sankey 25/03/2009 L1Calo Joint Meeting 25th-27th March 2009