Improve Phase Wrap Up and Action Items

Slides:



Advertisements
Similar presentations
Summer Internship Program Outline
Advertisements

Roadmap for Sourcing Decision Review Board (DRB)
Six Sigma Green Belt Tools and Applications (3 Days Workshop) Prepared for: In-house Training
CSUN Engineering Management Six Sigma Quality Engineering Week 11 Improve Phase.
Presentation Template: Instructor Comments u The following template presents a guideline for preparing a Six Sigma presentation. An effective presentation.
Six Sigma Green Belt: Overview Robert Setaputra. What is Six Sigma? Six Sigma is the relentless and rigorous pursuit of the reduction of variation in.
QBASE Engineering © QBASE Engineering Sdn Bhd SIXSIGMA AWARENESS Overview Six Sigma is a management philosophy that is sweeping the world by storm and.
QMS, ISO and Six Sigma It’s all related….. QMS Any Quality Management System must satisfy four requirements: Processes must be defined and their procedures.
Overview of Lean Six Sigma
1. 2 What is Six Sigma? What: Data driven method of identifying and resolving variations in processes. How: Driven by close understanding of customer.
Writing a Research Proposal
Six Sigma By: Tim Bauman April 2, Overview What is Six Sigma? Key Concepts Methodologies Roles Examples of Six Sigma Benefits Criticisms.
Program Participants: Department Managers, Project Leaders, Senior officers, Black Belt candidates and anyone who desires an understanding of Lean Six.
1 Industrial Design of Experiments STAT 321 Winona State University.
“Safety is a Measure of Success”
Black Belt Level DMAIC Certification Checklist
1 Russ Albright, Director. 2 Overview Vision and motivation What is Six Sigma?
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Team Chartering Six Sigma Foundations Continuous Improvement Training Six Sigma Foundations Continuous Improvement Training free six sigma site.
Welcome to Lean Six Sigma Green Belt Training
Black Belt Project Storyboard Template
 Name  Work experience  Background in continuous improvement activities  Expectations 1.
Items Required for Process Hand-off
© BMGI. You may freely modify, distribute and/or reproduce this only if BMGI's logo is not altered or removed. Finance Process 22 May 2006.
Copyright © Six Sigma Academy International LLC All Rights Reserved Introduction To Measure.
1 66 1 Six Sigma – Basic overview. 2 66 2 WHAT IS THIS SIX SIGMA ? A Philosophy A Statistical Measurement A Metric A Business Strategy make fewer.
© 2002 Six Sigma Academy Eliminate Waste Reduce Variability Growth Six Sigma Elements Designing products, services, and processes that satisfy both client.
Kaizen Event Flow Kaizen Facilitation Project Management.
Rapid - Lean Six Sigma: Executive Overview Leading in a Lean Six Sigma Environment University of Washington – Tacoma Key Bank Professional Development.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Info-Tech Research Group1 Info-Tech Research Group, Inc. Is a global leader in providing IT research and advice. Info-Tech’s products and services combine.
Phase-1: Prepare for the Change Why stepping back and preparing for the change is so important to successful adoption: Uniform and effective change adoption.
Measure Phase Welcome to Measure. Welcome to Measure Phase 2 Wrap Up & Action Items Process Capability Measurement System Analysis Six Sigma Statistics.
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
Define Phase Wrap Up and Action Items. Define Phase Overview—The Goal The goal of the Define Phase is to: Identify a process to improve and develop a.
1 Chapter 9 Implementing Six Sigma. Top 8 Reasons for Six Sigma Project Failure 8. The training was not practical. 7. The project was too small for DMAIC.
Analyze Wrap Up and Action Items
Practical Assessment Project Template – DMADV
Continuous Improvement Project (A Guideline For Sponsors)
TM 720: Statistical Process Control DMAIC Problem Solving
Practical Assessment Project Template
Six Sigma.
Control Phase Wrap Up and Action Items
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Six-Sigma : DMAIC Cycle & Application
Lean Six Sigma DMAIC Improvement Story
Problem Solving Process.
Improve Phase Welcome to Improve
Measure Phase Welcome to Measure
Control Phase Wrap Up and Action Items
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Define Phase Wrap Up and Action Items
What Is Six Sigma? Sigma is a letter in the Greek Alphabet
Lean Six Sigma DMAIC Improvement Story
OPS/571 Operations Management
Lean Six Sigma DMAIC Improvement Story
Quality Management Six Sigma
Six Sigma Green Belt Training
Control Phase Welcome to Control
Chicago Public Schools
Control Phase Welcome to Control
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Analyze Phase Welcome to Analyze
Measure Phase Wrap Up and Action Items
QMS, ISO and Six Sigma It’s all related…..
Six Sigma Introduction 1 1.
Lean-Green belt six sigma program
Practical Assessment Project Template – DMADV
Presentation transcript:

Improve Phase Wrap Up and Action Items Congratulations on completing the training portion of the Improve Phase. Now comes the exciting and challenging part…Enjoying the improvements to your process and keeping them under Control.

Improve Phase Overview - The Goal The goal of the Improve Phase is to: Determine the optimal levels of the variables which are significantly impacting your Primary Metric. Demonstrate a working knowledge of modeling as a means of process optimization. This is a summary of the purpose for the Improve Phase. Avoid getting into analysis paralysis, only use DOE’s as necessary. Most problems will NOT require the use of Designed Experiments however to qualify as a Black Belt you at least need to have an understanding of DOE as described in this course.

Improve Action Items Listed here are the Improve Phase deliverables each candidate will present in a Power Point presentation at the beginning of the Control Phase training. At this point you should understand what is necessary to provide these deliverables in your presentation. Team Members (Team Meeting Attendance) Primary Metric Secondary Metric(s) Experiment Justification Experiment Plan / Objective Experiment Results Project Plan Issues and Barriers It’s your show! Before beginning the Control Phase you should prepare a clear presentation that addresses each topic shown here.

Lean Six Sigma Behaviors Being tenacious, courageous Being rigorous, disciplined Making data-based decisions Embracing change & continuous learning Sharing best practices Each “player” in the Lean Six Sigma process must be A ROLE MODEL for the Lean Six Sigma culture. Walk the Walk! Please read the slide.

Improve Phase - The Roadblocks Look for the potential roadblocks and plan to address them before they become problems: Lack of data Data presented is the best guess by functional managers Team members do not have the time to collect data Process participants do not participate in the analysis planning Lack of access to the process Each phase will have roadblocks. Many will be similar throughout your project.

DMAIC Roadmap Identify Problem Area Assess Stability, Capability and Measurement Systems Identify and Prioritize All X’s Prove/Disprove Impact X’s Have On Problem Identify, Prioritize, Select Solutions Control or Eliminate X’s Causing Problems Implement Solutions to Control or Eliminate Xs Causing Problems Implement Control Plan to Ensure Problem Does Not Return Verify Financial Impact Determine Appropriate Project Focus Estimate COPQ Establish Team Champion/ Process Owner Define Measure Analyze Improve Control The objective of the Improve Phase is simple – utilize advanced statistical methods to identify contributing variables OR more appropriately optimize variables to create a desired output.

Simulate the New Process Improve Phase Analysis Complete Identify Few Vital X’s Experiment to Optimize Value of X’s Simulate the New Process Validate New Process Implement New Process Ready for Control Over 80% of projects will realize their solutions in the Analyze Phase. However Designed Experiments can be extremely effective when used properly. From an application and practical standpoint if you can identify a solution by utilizing the strategy and tools within the Measure and Analyze Phases then do it. Do not force Designed Experiments. Remember your sole objective in conducting a Lean Six Sigma project is to find a solution to the problem. You created a Problem Statement and an Objective Statement at the beginning of your project. However you can reach a solution achieving the stated goals in the Objective Statement then implement them and move on to another issue – there are plenty!

Improve Phase Checklist Improve Phase Questions Are the potential X’s measurable and controllable for an experiment? Are they statistically and practically significant? How much of the problem have you explained with these X’s? Have you clearly justified the need for conducting a Designed Experiment? Are adequate resources available to complete the project? What next steps are you recommending? These are questions the participant should be able to answer in clear, understandable language at the end of this phase.

Planning for Action WHAT WHO WHEN WHY WHY NOT HOW A DOE to meet your problem solving strategy   Scheduling your experimental plan Executing your planned DOE Analysis of results form your DOE Obtain mathematical model to represent process Planning the pilot validation for breakthrough Present statistical promise to process owner Prepare for implementation of final model Schedule resources for implementation timeline Conclude on expected financial benefits Over the last decade of deploying Lean Six Sigma it has been found the parallel application of the tools and techniques in a real project yields the maximum success for the rapid transfer of knowledge. Thus we have developed a follow up process that involves planning for action between the conclusion of this phase and the beginning of the Control Phase. It is imperative you complete this to keep you on the proper path. Thanks and good luck!

At this point you should: Summary At this point you should: Have a clear understanding of the specific action items Have started to develop a project plan to complete the action items Have identified ways to deal with potential roadblocks Be ready to apply the Six Sigma method within your business You’re on your way! Please read the slide.