Pilot Results - Installed Signs

Slides:



Advertisements
Similar presentations
County of Fairfax, Virginia Board Transportation Committee Updates on Alternatives for Improving Roadway Services in Fairfax County Discussion of Converting.
Advertisements

Ledger Size DEFINE / BACKGROUND INFORMATION Problem Statement: Goal OR Objective: Scope (if needed):  Problem Statement  Project Scope  Goal Target.
Greg Melroy Manager, West Monroe Partners. © 2012 West Monroe Partners | Reproduction and distribution without West Monroe Partners prior consent prohibited.
Traffic Control Guidelines
Wollaston Center Parking Study April 16, Study Area 0.2 miles 4 min walk.
Project Storyboard Template
Guidelines for Traffic Control at Surface Mines
Overview of DMAIC A Systematic Framework for Problem Solving
This material was produced under grant number SH SH-1 from the Occupational Safety and Health Administration, U.S. Department of Labor. It does not.
1 Part 5: Closing Task 1 Kelvin asked you to help him prepare and present the final project presentation. Prepare a short presentation to summarize result.
INTERSECTION SAFETY PERFORMANCE AND AUDIT Andy Loonan Basak Aldemir-Bektas Intersection: Welch Avenue & Lincoln Way.
Advanced Preempted Crossings – A Case Study Tim Oster Railroad Project Manager City of Fort Worth Mid-States Highway-Rail Grade Crossing Safety Conference.
Finance Vic Rainsford Vice President Planning & Analysis Jim Palmer Sr. Mgr. Planning & Analysis.
Objectives The student will be able to: 1. State the coordinate of a point on a number line. 2. Graph integers on a number line. 3. Add and subtract integers.
 Ensure the scene is setup for a safe successful outcome  Request the necessary resources  Access and extricate the injured  Transport all patients.
Opening/Warm Up Use the number line below to compare the integers. Place a or = sign in each _ _ _ _ _ -11.
The Implementation of BPR Pertemuan 9 Matakuliah: M0734-Business Process Reenginering Tahun: 2010.
Jason J. Siwula, PE – Safety Engineer HSIP HORIZONTAL ALIGNMENT SIGNING.
GROUND GUIDE PROCEDURES. INTRODUCTION Ground guides must be trained in standard hand and arm signals and flashlight signals before guiding a wheeled vehicle.
Last Updated: MONTH, YEAR Team: M. W. (Team Leader)R. F. T. D.M.G. T. L.D. J. (Sponsor) Green Belt Project Objective: TITLE Green Belt Project Objective:
Productive Working Lara Fox Project Manager. What is Productive Working? Productive working involves efficient, effective and safe processes within a.
PROCESSING TECHNIQUES IN GEOGRAPHY.. Starter In our last lesson we looked at some of the different ways in which we can gather information. It is just.
Light Year Visible light travels at a speed of 186,000 miles/second, or to think of this speed in terms of time and distance, a light- second is 186,000.
Continuous Improvement Project (A Guideline For Sponsors)
TM 720: Statistical Process Control DMAIC Problem Solving
The DMAIC Method
Revision
Green Belt Project Storyboard Template See Green Belt Storyboard Checklist for required contents Visit GoLeanSixSigma.com for more Lean Six Sigma Resources.
Lean Six Sigma DMAIC Improvement Story
Rules of the Road Chapters 1-5.
Lesson 2-3 Adding and Subtracting Integers
Systems Implementation,
Spot Speed Study Lab 2 Instructor:
Judy was organizing her post-it notes by color
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
Welcome to LSST Travel!.
Year 4 Objectives : Measurement 1
Functions From Geometry
Kaizen Report Traffic Improvement on a Marine Terminal
BACKING SAFETY Excerpt from NC School Bus Driver Training Course
Units and Conversions.
IS Project Management How to Close a TPM Project
Lean Six Sigma DMAIC Improvement Story
OPS/571 Operations Management
Science and Measurement
Lean Six Sigma DMAIC Improvement Story
Analyze Fishbone Diagram
Positive and Negative Numbers
Classified Evaluation System
Project Title Date Location of Kaizen Author.
Project Certification Close Out Phase November 16, 2015
A B A B C D C D A B A B C D C D A B A B C D C D A B A B C D C D
KAIZEN PROCESS INTEGRATING MANUFACTURING & SPECIAL PROCESSING.
Project Management Process Groups
Astronomy Week 1.
Speed, Distance and Time
Luxfer Gas Cylinders – S&OP Process Improvement
Luxfer Gas Cylinders – S&OP Process Improvement
DMAIC STANDARD WORK TEMPLATE
Classified Evaluation System
The FACS Commissioning Framework
DMAIC STANDARD WORK TEMPLATE
Effective Project Management: Traditional, Agile, Extreme
The Number Line Integers = {…, -2, -1, 0, 1, 2, …}
The Number Line Integers = {…, -2, -1, 0, 1, 2, …}
Making graphs from data
Validation by Process Owner Validation by Project Leader
Paul King V. U. School of Engineering
Adding and Subtracting Integers
Transit in TSMO: Bus On Shoulder
Presentation transcript:

Pilot Results - Installed Signs Improve Pilot Results - Installed Signs

Pilot Results - Installed Signs Improve Pilot Results - Installed Signs

Pilot Results - Installed Signs Improve Pilot Results - Installed Signs

Pilot Results - Installed Signs Improve Pilot Results - Installed Signs

Improve Summary Improve BEFORE AFTER DIFFERENCE +NUMBERS -NUMBERS   UTR CYCLE TIME 9 MIN 10 SEC 1 ORDER ACCURACY If necessary, summarize the findings of your project through the improve phase. This chart represents the improvement of cycle time between the original and improved system.

Value Analysis (bar graph) Value added/ Non value added) Showing Improvement Before Analysis shows UTRs at 9 minutes 10 seconds. The revised Time Analysis shows an improvement to minutes.

Improvement: Spaghetti Diagram (Before) Used the diagram to document the distance and time between each operation. The original distance was a total of 2.9 miles for (UTR Drivers)/4.6 miles (Outside Truckers), Time: 9 minutes 10 seconds (UTR Drivers), Processes: 4 (UTR Driver)/ 5 (Outside Trucker).

Improvement: Spaghetti Diagram (After) - tbd - Used the diagram to document the distance and time between each operation. The original distance was a total of 2.9 miles for (UTR Drivers)/4.6 miles (Outside Truckers), Time: minutes seconds (UTR Drivers), Processes: 4 (UTR Driver) / 5 (Outside Trucker).

Improvements Improve Old Way (No signs were visible) New Way (Added more signs to all areas of the yard) Added K-rail to define the areas

Simple, large and clearly posted directional signs Control Mistake Proof Simple, large and clearly posted directional signs Paint on the ground to clearly define the areas Added k-rail so the areas are defined

Control Plan Added arrows to the signs to show the direction Added K-rail to clearly define areas Added larger signs to they are easily visible day or night A copy of the control plan should be place here.

UPDATE (Improvement) Changes Incorporated Painted yard locations on the ground which eliminated confusion Highlighted one way areas, STOP & YIELD areas with paint Trans row indictors were placed at the caps and throughout the trans rows to alert the drivers of their location We added 71 signs which quadrupled the number of existing signs on the terminal Added K-Rails to clearly define traffic patterns, parking zones, and walk areas We utilized K-Rails for signage

UPDATE (Improvement) Results after 4 months The outside trucker turn time decreased from 40.01 to 34.32 since the signs were put in place. A total improvement of 6 minutes 9 seconds which is a 14.3% improvement in trucker turn times. The UTR Cycle time decreased from 9 minutes and 10 seconds to 8 minutes and 12 seconds. A total improvement of 58 seconds or an estimated .04 moves per hour improvement in the overall vessel production.

Lessons Learned DMAIC is a systematic approach The First step in improving a system is understanding a system Start with a charter and Define goals Use SIPOCR and detailed process map to establish a baseline Identify value added and non value added Maximize value added and minimize or eliminate non value added Ensure safety on any changes we make Any changes we make we have to ensure that they are sustainable Focus on areas that give the biggest bang for our buck 5S all areas