Thu 19/5 06: :00 Investigations from vacuum and cryogenics

Slides:



Advertisements
Similar presentations
PROFIBUS controller problem (SEU) on cryo valve on DFBMH (600 A circuit RQ6.L7B1/2). Loss of cryo maintain ==> Beam dump. End of fill #1975 after ~2.5.
Advertisements

LHC 8:30 meetingEBH 1  Cryogenics recovery in point 8  Meanwhile a couple of accesses:  MKI investigation on noise in IP2  Insulation Vacuum.
● Morning: Physics fill with 25 bunches: – 07:00: Injection; – 07:25: Start ramp; – 09:00: End of squeeze and stable beams; – Emittances:  x1 = 3.0 
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
07:30 – 10:30 Asynchronous dump test with Beam 2. No issue found. FIDEL update. Now chromaticity decay corrected. 12:13 Beam dump due to problem in the.
LHC Scrubbing Run 1 Day 3 (27/06/2015) Scrubbing team 28/06/2015.
Another typical LHC day. 06:15 Fill 2000 dumped 08:44 Stable beams – fill 2001  1.675e14  1.21e11  ~2 microns normalized emittance 11:34 Beams dump.
:00 meetingEBH 1  6:39 beam dump by BLM 655ms RS on BLMEI.05L4.B2E10_MBRB (which is downstream of BSRT B2).  The losses increased during.
LHC Status Fri Morning 3-June
Wednesday
Saturday Coordinators weekend: Mike Lamont, Eva Barbara Holzer
Wed 27/7 – Thu 28/7 09:00 LHC Controls problems
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Machine Coordinators: G. Arduini, J. Wenninger
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Wed :55 Fill 2653 stable beams 1.40e11 ppb, cm-2s-1peak lumi, 11.6 pb-1 total lumi delivered. 09:31 Dumped by collimator interlock:
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Monday fill with 1092 bunches (6 h stable beams)
Monday 11/07: Recovery Plenty of accesses.
MD25 ns - 14/12/2012 G. Arduini, H. Bartosik, G. Iadarola, G. Rumolo
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
LHC Morning Meeting - G. Arduini
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
Tuesday 22nd January - morning
Summary of Week 11: 14 – 21 March
Summary of Week 16 G. Arduini, J. Wenninger
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Scrubbing progress - 09/12/2012
Scrubbing progress - 10/12/2012
Friday 31st August & night
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Sunday morning Recovering from 400 kV disturbance.
Monday Morning – recovery from cryo.
Chromaticity can make a difference…
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Saturday – Morning 7:36 beams dumped
Finally.... We had to wait a long time.... We had many problems....
Summary Thursday h21: Stable beams fill #1303.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday – Morning Fill 3265 stable beams since 1:31
Aims for the week Recover from technical stop and precycle at 10A/s
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Mon Access for switching temperature probe DFB L7.
LHC Morning Meeting - G. Arduini
Scrubbing progress - 08/12/2012
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
07/08/2010 Fill #1264 dump at 02:14:38.
Thursday 22 September 2011.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Summary Tuesday h23: Machine closed. Precycle started.
Thursday
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 24 September 2011.
Coordination: Eva Barbara Holzer, Mike Lamont
LHC Morning Meeting - G. Arduini
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Monday 27th August & night
Wednesday 26 October 2011.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Saturday 26 November 2011.
Thursday 10:00 Fill 1986 in stable beams.
Mon 8/8 – Tue 9/8 Stable beams #2009
Presentation transcript:

Thu 19/5 06:00 - 11:00 Investigations from vacuum and cryogenics 11:20 Trip of sector 67 (QPS) 11:20 - 15:00 Access for QPS intervention and recover 15:00-17:00 Setting-up of injection with 108 bunches 17:00-20:00 Injection of large number of bunches (verification of vacuum, cryogenics and RF in parallel) 20:00 1308 bunch/beam injected 21:20 Beam dump due to vacuum spike close to D1.R2 23:35 STABLE BEAMS 1795: Initial luminosity: 7.7x1032 cm-2s-1 – delivered so far ~ 18 pb-1 in 8 h Beam dump due to cryo control card for current leads

Vacuum and cryo behaviour - triplets Large fluctuations observed in the BS temperature of triplet L8 + gas condensation on the beam screen during technical stop/cryo stop in point 8 can explain these observations  adjustment of regulation

Filling with trains of 108 bunches While RF, cryo, vacuum monitoring 1.5x1014 p in the machine ~half nominal intensity

Emittances with 1200 bunches

Filling with trains of 108 bunches Vacuum evolution during filling. Still some activity

Filling with trains of 108 bunches During temperature scan on BS triplet L8. Vacuum spike in point 2R (triplet) remains unexplained. Not all is related to BS temperature.

Vacuum activity during the ramp

Others - FIDEL: It was found that for the FIDEL there were two issues ( both being looked at by Marek)         - The first is that the scaling of the powering history as extracted from the logging and used as input to the FIDEL calculations might be not very accurate, and so may cause the fidel predictions to be different that the actual b3 value. This can be observed as chroma drift.         - The second is that an expired RBAC token can prevent the trimming at injection (but not the continued FIDEL calulations). - The BLM monitoring factor on BLMQI.06L2.B2I20_MQML has been increased from 0.3 to 1.0 in order to allow for injection losses for the 108 and 144 bunch injection.

Plan Phase loop firmware update and FGC RBAC time-out extension during ramp down ~14:00 Verification of phase loop functionality PM: injection verification with 108 bunches + LSS6 BPM verification with 108 filling pattern Evening physics with 768 bunches (108 bunches train)

Plan (WE) Tomorrow during the morning: go to 912 bunches Hopefully lot of physics with 912 bunches