P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot

Slides:



Advertisements
Similar presentations
Doc.: 11-11/0962r2 Submission July 2011 Michael Montemurro (RIM), Bruce Kraemer (Marvell) Slide 1 P802.11ae Report to EC on Conditional Approval to go.
Advertisements

Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11REVmb Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /0287r6 Submission March 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to Sponsor.
P802.11ah Report to EC on Conditional Approval to go to Sponsor Ballot
Doc.: IEEE /0287r0 Submission February 2015 Dorothy Stanley (Aruba Networks)Slide 1 P802.11REVmc Report to EC on Conditional Approval to go to.
Doc.: IEEE /1437r0 Submission Nov 2008 Bruce Kraemer (Marvell), Adrian Stephens (Intel), Sheung Li (SiBeam) Slide 1 Précis of P802.11n Report.
Doc.: Submission July 2009 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v Report to EC on Conditional Approval to go to Sponsor.
Doc.: IEEE /0905r3 Submission July 2009 Jon Rosdahl, CSRSlide 1 July 2009 Plenary Presentation from WG11 to 802 EC Date: Authors:
Doc.: IEEE /1130r3 Submission November 2009 Dorothy Stanley, Aruba NetworksSlide 1 IEEE TGv November Agenda Date: Authors:
Doc.: Submission July 2010 D. Stanley (Aruba), B.Kraemer (Marvell) Slide 1 P802.11v report to EC on request for conditional approval to proceed.
Doc.: IEEE /0777r0 Report July 2016 Yongho Seok (NEWRACOM)Slide 1 Date: Authors: P802.11ah Report to EC on Approval to forward draft.
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
xxxx doc.: IEEE /xxxxr0 March 2017
IEEE TGv March 2010 Agenda Date: Authors: March 2010
November 2008 doc.: IEEE /1437r1 July 2011
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2011
July 2010 doc.: IEEE /0872r1 July 2010 P802.11u report to EC on request for conditional approval to proceed to RevCom Date: Authors:
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11s report to EC on request for approval to proceed to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11s Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11n report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r3 November 2010
November 2008 doc.: IEEE /1437r1 July 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aa Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11p Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on approval to forward draft to RevCom
P802.11aq Report to EC on approval to forward draft to RevCom
November 2008 doc.: IEEE /1437r1 July 2010
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z conditional approval report to ExCom
P802.11ae Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11w report to EC on request for approval to proceed to RevCom
November 2010 doc.: IEEE /0872r4 November 2010
P802.11w report to EC on request for approval to proceed to RevCom
P802.11w report to EC on request for approval to proceed to RevCom
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
November 2010 doc.: IEEE /0800r9 November 2010
November 2008 doc.: IEEE /1437r1 November 2010
November 2008 doc.: IEEE /1437r1 August 2010
June 2009 r2doc.: IEEE /0674r0 doc.: IEEE /0674r0 April 2010
P802.11u Report to EC on Conditional Approval to go to Sponsor Ballot
November 2008 doc.: IEEE /1437r1 July 2010
TGn Closing Report Vancouver, BC, Canada 802 Plenary
September 2009 Closing Report
P802.11z Report to EC on Conditional Approval to go to Sponsor Ballot
P802.11aq Report to EC on Conditional Approval to go to Sponsor Ballot
IEEE TGv July 2010 Agenda Date: Authors: July 2010
November 2010 doc.: IEEE /0800r9 November 2011
P802.11aq Report to EC on approval to forward draft to RevCom
July 2009 Closing Report Date: Authors: July 2009
Presentation transcript:

P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot November 2008 doc.: IEEE 802.11-08/1437r1 July 2009 P802.11v Report to EC on Conditional Approval to go to Sponsor Ballot Date: 2009-07-16 Authors: D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

November 2008 doc.: IEEE 802.11-08/1437r1 July 2009 Introduction This document contains the report to the IEEE 802 Executive Committee in support of a request for conditional approval to send IEEE P802.11v to Sponsor Ballot. This document (11-09/0720r1) was approved during the closing plenary session of the 802.11 working group on July 17, 2009. Passed in the Task Group <result> Passed in the Working Group <result> D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

TGv draft text stability November 2008 doc.: IEEE 802.11-08/1437r1 July 2009 TGv draft text stability 375 6.0 5.0 350 4.0 325 300 AP MIB added # pages 275 3.0 250 2.0 225 1.0 200 Jan-07 Jul-07 Jan-08 Jul-08 Jan-09 Jul-09 D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

802.11 WG Letter Ballot Results – P802.11v November 2008 doc.: IEEE 802.11-08/1437r1 July 2009 802.11 WG Letter Ballot Results – P802.11v Ballot ID Ballot Close Date Title Ballot Type Pool Return %Return Abstain % Abstain Approve Disapprove %Approve 140 19 Dec 2008 Technical Letter Ballot for Task Group-v Draft 4.0 Technical 254 225 88.58 40 17.78 149 36 80.54 146 4 Apr 2009 Recirculation Letter Ballot for Task Group-v Draft 5.0 Recirculation 228 89.76 41 17.98 155 32 82.88 150 12 Jun 2009 Second Recirculation Ballot for Task Group-v Draft 6.0 230 90.55 38 16.10 172 20 89.58 150.1 15Jul 09 Second Recirculation Ballot for Draft 6.0 Post ballot results 174 18 90.6 D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

802.11 WG Letter Ballot Comments – P802.11v November 2008 doc.: IEEE 802.11-08/1437r1 July 2009 802.11 WG Letter Ballot Comments – P802.11v Ballot ID Ballot Close Date Title Ballot Type Number of Comments received 140 19 Dec 2008 Technical Letter Ballot for Task Group-v Draft 4.0 Technical 586 (418T, 168E) 146 4 Apr 2009 Recirculation Letter Ballot for Task Group-v Draft 5.0 Recirculation 321 (225T, 96E) 150 12 Jun 2009 Second Recirculation Ballot for Task Group-v Draft 6.0 140 (93T, 47E) D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

Unsatisfied comments by commenter November 2008 doc.: IEEE 802.11-08/1437r1 July 2009 Unsatisfied comments by commenter Voter LB140 LB146 LB150 Total Joe Epstein 3 Lusheng Ji 1 David Bagby William Marshall 8 Henry Ptasinski 4 2 6 Robert Miller Mark Hamilton Harry Worstell Richard Roy Qi Wang Gabor Bajko Matthew Fischer Darwin Engwer Graham Smith 25 10 5 40 D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

Unsatisfied Comments – Topics November 2008 doc.: IEEE 802.11-08/1437r1 July 2009 Unsatisfied Comments – Topics Topic #Comments Diagnostics, Event, and STA Statistics 5 Directed Multicast and Flexible Multicast Service Location 8 Time Advertisement 1 Timing Measurement AP Collaboration 4 Patents Multiple BSSID 6 QOS Traffic Capability 2 Scope Optional/Mandatory Total 40 D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

November 2008 doc.: IEEE 802.11-08/1437r1 July 2009 Unsatisfied comments The composite of all unsatisfied comments and the resolutions approved during working group ballot may be found in document: 11-09-0676-06, a copy of this is attached. Double click on the icon to the right to open this. A copy of the unsatisfied comments presented using MyBallot access database report format is attached. D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

TGv Timeline Third recirculation (TGv draft 7.0) Open 24-Jul-09 Close November 2008 doc.: IEEE 802.11-08/1437r1 July 2009 TGv Timeline Third recirculation (TGv draft 7.0) Open 24-Jul-09 Close 8-Aug-09 Clean recirculation (TGv draft 7.0) 25-Sep-09 10-Oct-09 Pool formation 15-Aug-09 29-Sep-09 First sponsor ballot 19-Oct-09 18-Nov-09 Second sponsor ballot 3-Feb-10 18-Feb-10 Third sponsor ballot 30-Mar-10 15-Apr-10 Fourth sponsor ballot 15-May-10 30-May-10 EC to RevCom Mar-10 (cond.) or Jul-10 RevCom to SB Jun-10 or Sep-10 D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell

November 2008 doc.: IEEE 802.11-08/1437r1 July 2009 802.11 EC Motion – <agenda item#> Conditional Approval to send P802.11v to Sponsor Ballot Grant conditional approval, under Clause 13 to forward P802.11v to Sponsor Ballot. P802.11v had a 89.58% approval on the last WG Recirculation Ballot. Working Group 11 vote on the Motion Passed: <for> y, <against> n, <abstain> a Moved: Bruce Kraemer 2nd: <name> Yes No Abstain D. Stanley (Aruba), B.Kraemer (Marvell) Bruce Kraemer, Marvell