2017 X15 EH Bracket Machining Change

Slides:



Advertisements
Similar presentations
J.P. Langston Brake Retrofit
Advertisements

Project Nexus Next Steps Xoserve/Large GT View – 6 December 2011.
WING SUPPORT CONCEPTS FOR WINGS # 2,3,6,7 AND 9 GARY MCGINNIS 09/19/ – TAPPING HOLES FOR STUDS 2 – STUD AND INSERT WELDING 3 – WELDING BRACKETS.
Single Module Vertical Outlet Tube Change
2017 Single Module Beta to LP Changes
New Turbocharger Plumbing Oil Drain Connection for QSB6.7 T3
Minimizer Confidential
C Air Compressor Up-fit and Plumbing Guide For LDI B3
You & your business idea Market segments & value proposition
27 February 2017 College Planning Council
Info. For CEAF Heated Breather Tube Change Engines: QSB4. 5/6
Governor Pad Location Change on ISC/ISL HT Twin Cylinder WABCO Air Compressor Mahesh Koyyada on behalf of Kimberly Van Selow.
2017 X15 Turbo Compressor Cover V-band Clamp Reorientation
Water inlet connection and block heater relocation
Changing the orientation of the adjusting link within CF Options to resolve interference issue Options Impacted: CF , CF , CF , CF ,
CEAF for ISF3.8 soft engaged starter
VPCR CEAF César F. Demarchi March, 22nd 2017.
Information To support CEAF Obsoleting Grid Heaters with Heater Control Modules for B Tier 1 and Tier 2 Options: AH9044, AH9083, AH9084, AH9122, & AH9128.
Removing the Backshell from Oil Pressure Sensor Connector Option Impacted: WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,WR ,
Information to Support CEAF: ISL Euro3 WWCP V Software Update
Information to Support CEAF: New Software release for ISB and ISL Euro 4 and 5 Products Lisa Ferguson Cummins Confidential.
QSK19 Oil Pan Fillet Change
Implementation of bolt spacers to the oil cooler hardware
Affected Options: BR Option; EB Option; PH Option;
بسم الله الرحمن الرحيم الموضوع:الوضوء صفته وفرائضه وسننه
Information To support CEAF Notification of proposal to modify the orientation of the , CLAMP, V BAND that is used in XS9693 on 6 cylinder automotive.
Information to support CEAF Notification of approval of new assembly line at the suppliers Chinese manufacturing location for the , COMPRESSOR,
A 6 mm cable with a length of 15 m has been installed
LP fuel lines redesign on ISX15 engines Date- 6th Sep 2017
Auxiliary Pump Drive Option Replacement for D0S3002CX03
Q19, K19, GTA855, N14, G855 Breather Change
Off-Highway Diagnostic Improvement Project
Addition of MCRS low pressure fuel pump pressure relief valve for QSK38/50/60 Kelle Ravn May 20th 2015 (Changed “check valve” in May 18th version to “pressure.
Prodigy Eclipse Features
Mounting Zone Edge and Profile Tolerance Change on EPA2017 Inlets
Oil Pans with Full Circumference Clamping Plates for ISB6
Sticker Label Location Change on UL2 Supply Module
Communicating the Facts on the MERS Experience Study
LP fuel lines redesign on ISX15 engines Date- 6th Sep 2017
EGTS CAL ID Update Cummins Confidential CEAF Type: Change Notification
You & your business idea Market segments & value proposition
Pitch deck Project Alpha
OEM installation check with REV_03 CAD models for ISL CC option for coolant lines for D phase release Date- 26th Aug 2016.
VPCR OVERVIEW The banjo fitting, from Cummins ISL16 330, is not oriented to install the remote fuel filter. As shown in the picture #1(next slide), the.
OEM installation check with CAD models for ISL/QSL CC option for coolant lines for D phase release – CC9323 Date- 13th Feb 2017.
OEM installation check for ISL/QSL CC9293 for coolant lines reroute with quick disconnect Date- 16th Feb 2017.
Minimizer Confidential
Updated Power on Indicator Lamp from J1-76 to J2-07 in CM2350 Beta Wiring Diagram (B6.7/L9 Stage V) 5/30/2017.
Project Scope Change Summary: Processing change at RMEP to close draincock P/N S923E on all L series engines Background: Customers have requested that.
L9 and B6.7 Component ID Change All options - D313029BX03 (B 2017) All options - D563025BX03 (L 2017) Mike Langevin 3/9/2017.
LP fuel lines redesign on ISX15 engines Date- 4th Aug 2017
Minimizer Confidential
General Knowledge & Identifying
LP fuel lines redesign on ISX12 engines Date- 6th Sep 2017
[Optional: Insert your company logo]
Presentation transcript:

2017 X15 EH Bracket Machining Change February 13th 2017 Cummins Confidential

Project Scope Change Summary: Background: (Reason for change) All EH bracket options (1173, 1174, 1175, 1176) will have additional machining to provide increased clearances for OEM bracket mounting Background: (Reason for change) EH bracket casting was changed to support the new air compressor plumbing pass thru for 2017. Current machining did not completely align new bracket with 2013-2016 profile and some OEM brackets have been found to not fit properly. Additional machining is needed to allow proper fit of OEM brackets. Implementation Strategy and Date: Target implementation of March 1st 2017 Cummins Confidential

Change Overview - Machining Cut Change to EH Options Affected Options: EH 1173, EH 1174, EH 1175, EH 1176 Insert Data Classification

Detailed View 3691070 – Old P/N 3694955 – New P/N Cast material around mounting pad machined away Radius cut moved in towards mounting pad 3691070 – Old P/N 3694955 – New P/N Insert Data Classification

Change Overview Verify any OEM installed brackets attached properly to EH bracket with new machining. Cummins Confidential