USN/USMC CAD/PAD Program Update 2017 CAD/PAD International Logistics Meeting Jurgen Smith USN/USMC CAD/PAD DPM 23 May 2017.

Slides:



Advertisements
Similar presentations
Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
Advertisements

DLA's Aviation Supply & Demand Chain Manager Defense Supply Center Richmond Aviation Engineering Reliability and Sustainment Programs Defense Logistics.
17 th Contracting Squadron I n t e g r i t y - S e r v i c e - E x c e l l e n c e LETTER CONTRACTS 2k7 01 Dec 05 Train and deploy the world’s foremost.
2 Breakout Session # 410 JAMES H. GILL, Technical Advisor, Space & Missile Systems Center, USAF Date April 16, 2008 Time 13:30 – 14:30 Working At Risk.
1 PBL Panel Discussion F-22 System Program Office F-22 System Program Office F-22 System Program Director 13 January 2015.
O F F I C E O F T H E C H I E F T E C H N O L O G I S T Dr. Laguduva Kubendran (LK) Program Executive, Flight Opportunities Program NASA Headquarters.
August 6, AM General Actions to Ensure Future Restructured business: –Renegotiated labor agreement –Renegotiated supply base pricing, focus on small.
1 Highly Accelerated Life Test (HALT) Wayne Bradley 8 April 2014.
1 Chapter 1 Introduction To Purchasing IDIS 424 Spring 2004.
1 Reducing Total Ownership Cost (R-TOC) and Value Engineering (VE) Dr. Danny L. Reed Institute for Defense Analyses June 8, 2006.
From Research Prototype to Production
Naval Inventory Control Point 1 F/A-18E/F Integrated Readiness Support Teaming (FIRST) concept, an alternative support strategy emphasizing Government/Industry.
AN/ALR-67(V)3 Advanced Special Receiver (ASR) Direct Vendor Delivery Program Presented by: Daniel Buechler ASR R&M IPT Lead (805)
1 Paul Warndorf Vice President - Technology Smart Machine Platform Initiative NDIA Manufacturing Division Meeting March 8-9, 2006.
MARINE CORPS INSTALLATIONS EAST CONTRACTING DIVISION DEFINING REQUIREMENTS.
Master the Power of QAD Supply Chain Risk Management Terry Onica, QAD February 8-9, 2016.
LOG235/236 Performance Based Logistics Bruce Hatlem Logistics Functional IPT September 2007.
Federal Acquisition Service 4 th Annual Government Transportation Forum TransPort Integrator Overview.
1 NAVAIR Public Release Distribution Statement A – “Approved for public release; distribution is unlimited” PRESENTED BY: Ken Carkhuff Deputy Associate.
TRADITIONAL OFFICER VACANCY ANNOUNCEMENT NEW YORK AIR NATIONAL GUARD 174th ATTACK WING 6001 EAST MOLLOY ROAD SYRACUSE, NY ANNOUNCEMENT#: FY.
Action/Initiative Date Action Initiated: December 2003 Status: On-Going Government and Industry Forum consisting of all military services, weapons system.
Roadmap to Greener Computing Henri Mikkola. Eco-Friendly Product Lifecycle Today through globalization products travel long distances before reaching.
FUTURE OF THE NORWEGIAN DEFENSE MARKET – INDUSTRY ATTRACTIVENESS, COMPETITIVE LANDSCAPE AND FORECASTS TO WEBSITE Single.
JL47 PERIPHERY, MILD DETONATING CORD
T45 Contractor Logistics Support
Agenda Program Manager, Air (PMA)-201 Organizational Structure
CAD/PAD Ordnance Assessment (OA) & Surveillance
T-6 Ballistic Canopy Fracturing Initiation System (CFIS-B)
448th Supply Chain Management Wing
CAD/PAD Development Process
Process Layout Chapter #6.
Customer Advocate, Army CAD/PAD
CAD/PAD Life Cycle Sustainment Plan (LCSP) 2017 CAD/PAD International Logistics meeting Lee Manis USN/USMC CAD/PAD APML 23 May 2017.
COIT Planning & Budgeting
AIT III Project Progress Review #2 Lorton, VA
Add Graphic(s) or Photo(s) CAD/PAD Staff Engineer
Small Column Insulated Delay (SCID) Issues
MT23/JM61 FIRE EXTINGUISHER CARTRIDGE
Naval Surface Warfare Center Indian Head Explosive Ordnance Disposal Technology Division Contract Demetrius Green Contract Support Division Director.
CORRECTIVE MAINTENANCE (REPAIRS) MANAGEMENT
TechStambha PMP Certification Training
Joint Strike Fighter (F-35) Program Update 2017 CAD/PAD International Logistics meeting Lee Manis USN/USMC CAD/PAD APML 23 May 2017.
Maintenance and Availability Data Warehouse (MADW)
USN/USMC CAD/PAD Program Overview 2017 CAD/PAD Industry Summit
USAF CAD/PAD Program Overview
The Cost of Service Life Extension 2017 CAD/PAD Industry Summit
Add Graphic(s) or Photo(s) CAD/PAD Acquisition Team Lead
CAD/PAD Requirements Determination
XW36 and MG67 MK 205 Mod 1/2 Catapult Cartridge MK 113 Mod 0/1 Rocket Motor Assembly Tina Simms CAD/PAD Logistics 23 May 2017.
Description of Revision
Phase 2 Tollgate Review Discussion Template
Foreign Military Sales (FMS)
CAD/PAD Technology Roadmap Tech Exchange May 15, 2018
Phase 1 Tollgate Review Discussion Template
Life Cycle Logistics Perspective KC-46 Product Support
US Army CAD/PAD Program Overview CAD/PAD Industrial Summit 23 May 2017
Sequential Phase II Awards at the Department of Energy
Lockheed Martin Canada’s SMB Mentoring Program
Executive Vice President and Oshkosh Truck Corporation
Detonating Cord Assembly (DCA)/ Thin Layer Explosive (TLX) Delivery Delays & Performance Issues Ben Kerlin, CAD/PAD, In-Service Engineering Detonating.
GENERAL SERVICES DEPARTMENT Facilities Management Division PROOF –NM (Process Reengineering & Optimization of O&M Functions for New Mexico) Phase II.
Update on the Draft EC Regulation
CAD/PAD In-Service Engineering
2017 International Logistics Meeting (ILM)
Joint Planning and Development Office “Where new ideas are welcome”
Basic overview of an EMS
{Project Name} Organizational Chart, Roles and Responsibilities
Small Business Opportunities
SHARE Special Project SHARE Benefits Optimization
Presentation transcript:

USN/USMC CAD/PAD Program Update 2017 CAD/PAD International Logistics Meeting Jurgen Smith USN/USMC CAD/PAD DPM 23 May 2017

Stock Shortage Metrics Service Life Extension Metrics Agenda Program Overview PB17 Budget Breakout Top Issues Update Stock Shortage Metrics Service Life Extension Metrics JSF CAD/PAD Transition Update

CAD/PAD USN/USMC Program War Fighter Capability $5.044M cut -$4.664 for RMD under execution to be re-phased back in FY17 & FY18 -$0.380 inflation cut $5.4M cut -$4.1 MISC devices program growth -$1.3 Other cost growth and delays Program Description War Fighter Capability ACAT: Non-ACAT Contractor: Various, 150 USN,MC contractual actions annually Martin-Baker, Goodrich, PACSCI, Cobham, Nammo-Talley, Chemring, Stresau, Capco, Hanley, ATK, Aerojet, Charl, CAD Inc, Kidde Aerospace, TekOrd Contract Type (s): Normally FFP, sole source or competitive Risks: Industrial Base consolidations; Obsolescence of energetic materials/ingredients Opportunities: 2nd source efforts for various NACES CADs, F-18/V-22 Fire extinguisher gas generators, F-18 selector handle, PDRM Mod1 Mission: Power egress/safety systems and supply energy to release weapons from aircraft Description: Life-limited energetic devices utilized in aircraft egress and safety systems, personnel gear, and weapon or store release systems. 676 distinct devices utilized for USN,MC Platforms: All fixed wing and helo platforms utilize CAD/PAD; each platform has its own set of devices, with 138 different aircraft configurations Employment: 380,000 CAD/PADs are installed in USN,MC aircraft with 70,000 annual change-outs upon reaching the end of their useful life. 375,000 Stores Release CADs are expended each year releasing weapons and other stores from the aircraft. Over 15,000 requisitions processed annually, 450 CODRs reviewed, 25 EIs and 4 MISTs annually. 3

CAD/PAD PANMC & O&MN Budget Breakout Integrated Logistics Support Production Engineering Support Quality Assurance Product Improvement Acceptance Testing Reliability Life $.5M $3.9M $1.8M Support funding also used for PIP/ 2nd Source Contract Support

Top Issues F/A-18 and T-45 PDRM Mod 1 release to service delayed Industry thus far unable to build FAT units Bringing work to Indian Head to prove design is producible Once successfully produced, will procure only Mod 1 and change out based on attrition Will get us back to 7 year life vice current 2 years

Top Issues Continued F/A-18 WB55 initiator OA test failures starting in Oct 2012 Test data forced a reduction to 2 year installed life Product improvement program qualification test units May 2017 Expect to be ready to procure new WB55 in FY18 Change out will be based on attrition T-6 JL56 initiators OA test failure in Nov 2014 T-6 Program office made decision to fly in Solo mode Takes JL56 out of ejection sequence Product improvement program complete Deliveries underway Need to change out JL57 along with JL56 due to aging trends

Top Issues Continued TLX line shortages continues Used on F/A-18, V-22, T-6, F-16, B-1, B-2, AH-64 Manufacturer had LAT failures in FY14 Root cause determined to be low/high core loads due to improper laser core load sensing system calibration Special testing conducted to verify corrective actions Will have to accept some anomalies until equipment is replaced CH53 MT23 fire extinguisher cartridge shortage HERO replacement JM61 failed FAT twice Emergency procurement of MT23 Recertified fleet MT23s to fill gap until deliveries July 17

Top Issues Continued Late contract awards Leads to late contract deliveries Creates increased stock shortages Drives up need for USN/USMC and FMS Service Life Extensions Increases RIK requests Often difficult to support RIK requests from USN stock Often leads to congressional and FMB budget cuts FMS customers, please get your requirements in on time and monitor your stock levels so you can plan for any stock shortages and required SLEs

CAD/PAD Stock Shortages By FY

CAD/PAD Service Life Extensions By FY

JSF CAD/PAD TRANSITION JSFPO signed memo transitioning CAD/PAD from CLS to Gov’t support IPT working towards an FY20 transition completion date Global pool of CAD/PAD for all customers envisioned Funded by JSFPO using participant’s funds Additional information to be provided by CAD/PAD APML this afternoon