Hillsborough MPO School Safety Study

Slides:



Advertisements
Similar presentations
December 5, 2011 Presented by: Sue DAgnese Region 1 Traffic Manager Overview of: ROAD SAFETY AUDIT (RSA) PROCESS & APPLICATIONS TV Highway at 185th Ave.
Advertisements

DEL-71 Project at the US 36/SR37 Interchange Round Table Meeting Ferzan M. Ahmed, P.E.- District 6 Deputy Director Steve Fellenger, P.E. – Project Manager.
1 Element 1: The Systemic Safety Project Selection Process Element 1: 4-Step Project Selection Process.
House Bill 2 and P3 Update Aubrey Layne Secretary of Transportation December 17, 2014.
Type Name Here Technical Program Services Eduardo C. Serafin, PE, AICP.
From KY 89 at the northern city limits of McKee to the recently improved section of US 421 just north of the Jackson-Rockcastle County line. Six-Year Highway.
MD 22 MULTIMODAL CORRIDOR STUDY. MD 22 MUTIMODAL CORRIDOR STUDY Purpose: Investigate and identify feasible and cost efficient transportation and safety.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
CP methodology adapted to Basel Convention Swedish International Development Agency S ESSION 9.B United Nations Environment Program Division of Technology.
CP methodology adapted to Stockholm Convention Swedish International Development Agency S ESSION 9.C United Nations Environment Program Division of Technology.
Hillsborough County Walk/Bike Action Safety Plan Hillsborough County MPO Prepared for: Prepared by: Hillsborough County Bicycle/Pedestrian Advisory Committee.
CP methodology adapted to UNFCCC Swedish International Development Agency S ESSION 9.A United Nations Environment Program Division of Technology Industry.
1 ADOT Road Safety Assessment Program Presented to NACOG Technical Subcommittee December 4, 2013.
TRIO and Special Programs Unit Fact Sheet Talent Search Program.
Good Afternoon/Introductions. Missoula’s LRTP Process Missoula Growth Workshop Base Case Scenario Envision Missoula Workshops Vision Scenario Envision.
Andrew Winga, P.E. – WisDOT Project Manager.  Background on numerous Transportation Studies  What is a Planning & Environment Linkage Study  Problem.
All Roads Transportation Safety (ARTS) Program Doug Bish Traffic Services Engineer Oregon Department of Transportation November 2014.
HEPMPO US 40 Pedestrian Safety Study WVDOT MPO Planning Conference 9/16/2015 Matt Mullenax (HEPMPO) Daniel Szekeres (Michael Baker International)
IIWG - 1 Intelligent Infrastructure Working Group Paul van der Kroon.
Ames Area Long Range Transportation Plan Issues / Visioning Workshop Originally helpd …November 3, 2009 Welcome!
2040 LONG RANGE PLAN UPDATE 2040 LRTP Update – Needs Plan Development October 6, 2015 City of Lynn Haven.
US 25 Corbin to London Citizens Advisory Committee Meeting December 2011.
Incorporating Connected/Automated Vehicles into the Transportation Planning Process November, 2015 Max Azizi US DOT.
Playground Enhancement -Increase natural play areas on the playground -Add barrier free play for everyone -Increase safety and view planes -Add opportunities.
Regional Trails Corridor Assessment. Presentation Outline »Project Overview – Study Limits – Project Goals »Stakeholder Outreach – Stakeholder Contact.
Jigsaw Activity. * The room has 3 sections: * Elementary * Middle * High * Please move to the section for your grade level and take your electronic device(s)
Oregon’s All Roads Transportation Safety (ARTS) Program Zahidul Siddique, Ph.D., PE, PTOE Oregon Department of Transportation October 26, st International.
County Road Administration Board th Annual Road Design Conference Local Agency Procurement and Selection Process for Professional.
NC Local Safety Partnership Program Implementation.
PROMOTING BIKING AND WALKING AS FUN, HEALTHY FORMS OF TRANSPORTATION IN PHILADELPHIA ELEMENTARY SCHOOLS.
Agenda Item #10 Revised Process for State Expenditure Plan and Approval of Next Steps Doug Robison, PWS Gulf Consortium Meeting April 21, 2016 Hillsborough.
BIKE AND PEDESTRIAN IMPROVEMENTS AND EDUCATION HILLSBOROUGH COUNTY PUBLIC SCHOOLS MPO SCHOOL TRANSPORTATION WORKING GROUP
Kensington and parts of west Kinsgford PAMP Workshop: 22 nd June 2010.
Statewide Pedestrian/Bicycle Data Collection Study Federal Certification of Statewide Planning Process Florida Department of TRANSPORTATION July 13, 2016.
Field Analyst Support Team (FAST) School Finance Division
Pedestrian Facility Improvement Program
Pedestrian & Bicycle Safety Education
NE Pasco (The Hills) Multimodal Safety Action Plan Pasco County, FL
Hillsborough MPO School Safety Study
REGIONAL BICYCLE AND PEDESTRIAN PLAN
Hillsborough MPO School Safety Study
FDOT District 7 School Safety Project Update
Signalized Intersection Lighting
PROJECT LOCATION Project begins at Garden Lane (East of I-4)
Road Safety Audit Interactive Checklist
Planning and Prioritizing At-Grade Railroad Crossings
Data Impacts of Transportation Reauthorization: Data Community’s Plans and Strategies Pat Hu Chair, TRB National Transportation Data Requirements and Programs.
FHWA Bicycle and Pedestrian Program
MPO’s School Transportation Working Group
Meeting of the Hillsborough MPO Board December 5, 2017
Tampa Hillsborough Expressway Authority Industry Forum 6/15/2018.
Bicycle and Pedestrian Plan Vision/Goals/Objectives
Moving Maryland Toward Zero Deaths
Identifying Barriers to Fish Passage in Mason County
Hillsborough MPO School Safety Study
City of Wilmington Bike Plan Update
Task Force Meeting #1 - Orientation -
Pierce County Performance Audit Committee
Hillsborough MPO School Safety Study
Sarah Tracy, P.E., PTOE Assistant Traffic Engineer
MPO Board Presentation
Prioritizing Watershed Protection in King County
2016 Pedestrian Plan Introduction.
2045 Metropolitan Transportation Plan (MTP)
REPC Advisory Subcommittees
2045 LRTP Overview United Way of St Johns County May 10, 2019.
Alex Henry FDOT District Seven Safety Office
East Selmon Capacity Project PD&E Study Industry Forum
2045 LRTP Overview North District Citizens Planning Advisory Committee.
TSMO – What Does It Mean for Planners?
Presentation transcript:

Hillsborough MPO School Safety Study School Transportation Working Group October 25, 2017

Hillsborough MPO School Safety Study Study Purpose Improve Safety for Students in Hillsborough County Task Prioritize school areas for multimodal safety and access reviews aimed at identifying opportunities to enhance the safety and comfort of getting to and from school. This is just a reminder, they’ve seen it before, so you don’t need to go through it all Result Complete Field Reviews at 10 School Areas

Project Approach Overview Multi-Step Process: D. Screening 2 –Contributing Factors C. Screening 1 – Crashes + Students B. Define School Evaluation Areas A. Define School Types Select 10 School Areas for Review Prioritize Schools Step 1 Conduct Field Reviews of Highest Priority Schools Step 2 An overview of the project approach, went through this in detail last month, spend a couple of seconds to remind them of the process, then that we are focusing on the Screen 1 evaluation and some of Screen 2 G. Follow-Up Activities F. Complete School Safety Audits E. Detailed School Area Review Identify enhancements for highest priority schools Results

Schools in Hillsborough County Perform Screening 1 Crash Data + Area Students All Schools

Schools in Hillsborough County Short List of School Areas Perform Screening 2 All + Short List Schools

Screening 2 Measures Arterial Road Intersections Collector Road Intersections Percent of Students on Free/Reduced Lunch Within MPO Defined Community of Concern Getting to School Survey Results Unfunded Transportation Students Recent RSA or other Safety Study

School Area Prioritization Sulphur Springs Community School Coleman Middle Hillsborough High Pierce Middle Plant High Brandon High Ferrell Middle Magnet King High Young Middle Magnet Gaither High Leto High B. T. Washington Elementary Muller Elementary Magnet Memorial Middle Chamberlain High Mort Elementary Middleton High Wilson Middle Van Buren Middle Riverview High

School Areas for Review Chamberlain High School Coleman Middle School Ferrell Middle Magnet + Middleton High + Young Middle Magnet School King High School Leto High School Muller Elementary Magnet School Pierce Middle School Plant High School Sulphur Springs K-8 Community School Van Buren Middle School

Next Steps Finalize the 10 School Areas for further review Begin School Area evaluation (desktop audit) and schedule field reviews Agency coordination/follow-up, feasibility reviews, and finalize recommendations

ELEMENT Engineering Group Thanks and Questions Contact Information: MPO Project Manager Lisa Silva, AICP, PLA silval@plancom.org Consultant Contacts Tindale Oliver Chris Keller, AICP ckeller@tindaleoliver.com ELEMENT Engineering Group Matthew Weaver, P.E., CPM mweaver@elementeg.com