GRID STATUS – PRE - ABT Very wide Frequency fluctuations

Slides:



Advertisements
Similar presentations
1 FREQUENCY LINKED DISPATCH AND ELECTRICITY PRICING (An unconventional approach for tackling the peculiar problems existing in India) - Bhanu Bhushan -
Advertisements

1 FREQUENCY CONTROL -- Bhanu Bhushan -- (April, 2011)
ENQUIRY BY SRLDC TO VERIFY THE DETAILS OF DC & AG BY NTPC AND NLC STATIONS PETITION NO:- 67/2003 (suo motto) & PETITION NO:- 90/2005 (TNEB) CERC HEARING.
1 TARIFF DESIGN for GENERATING STATIONS -- Bhanu Bhushan -- Feb 2011.
AVAILABILITY BASED TARIFF SCHEDLING PROCEEDURE AND SETTLEMENT MECHANISM UNDER ABT REGIME T. SRINIVAS MANAGER,SRLDCBANGALORE.
Queries raised by Director (Tariff) on ARR and Tariff Application of OHPC for FY on
1 ABT Based Boundary Metering. 2 ABTBoundary Metering+
RRF Mechanism ENERGY ACCOUNTING Western Regional Power Committee
INTRA STATE ABT Necessity Issues Implementation. Some of the features of New National Electricity Policy – Feb.’05 Appropriate Commissions to undertake.
1 THE INDIA ELECTRICITY MARKET TIME LINE REAL TIME 15 MT BLOCKS LONG TERM LOAD FORECAST FUND MOBILISATION 10-5 YEARS POWER PURCHASE AGREEMENTS CAPACITY.
POWER GRID CORPORATION OF INDIA LTD SOUTHERN REGIONAL LOAD DESPATCH CENTRE in 3rd SRPC MEETING 19 th February 2007 Bangalore GRID EVENTS AND ISSUES.
1 Regional Energy Accounting, Disputes Mechanism and Resolutions -R M Rangarajan & Asit Singh. -Executive Engineer, -SRPC, Bangalore.
Energy Accounting and Need for Special Energy Meters under ABT Regime.
AVAILABILITY BASED TARIFF. HIGHLIGHTS OF CERC ORDER DATED ON ABT 1. ORDER APPLICABLE TO J&K ALSO. 4. ABT WAS TO BE IMPLEMENTED IN ALL THE REGIONS.
Regulation and Commercial Issues in Bulk Power Generation Tariff By S.C.SHRIVASTAVA, Joint Chief (Engg) CERC, New Delhi 10/7/20151CERC.
Settlement System under ABT Regime -Prepared by -V.Balaji, -Chief Manager(comml), -SRLDC, Bangalore -Presented by -P.Bhaskara Rao -DGM (comml)
1 Regional Energy Accounting, Disputes Mechanism and Resolutions -Rakesh Goyal & Asit Singh. -Executive Engineer, -SRPC, Bangalore.
‘S ORDER ON AVAILABILITY BASED TARIFF PRESENTATION BY C.V.ANAND Sr.Supdt (Comml)
With amendments w.e.f  (1) In these regulations, unless the context otherwise requires,-  (a) ‘Act’ means the Electricity Act, 2003 (36.
Section 7.5 –4 – ii of Indian Electricity Grid code (IEGC): “The summation of station-wise ex-power plant drawal schedules for all ISGS after deducting.
PRESENTATION On National Hydroelectric Power Corporation Ltd. ( A Govt. of India Enterprise) Sector – 33, Faridabad (Haryana), INDIA “Comments on Discussion.
CMD VISIT ON 16-JAN-03 DAILY FREQ COMPARISION JAN-02 & JAN DAYS FREQ COMPARISION JAN-02 & JAN DAYS FREQ JAN DAYS FREQ JAN-02 TYPICAL.
W E L C O M E Power Grid Corporation of India Limited.
1 Analysis of OPTCL’s ARR and Transmission tariff for FY By: World Institute of Sustainable Energy, Pune (Consumer Counsel) 4 th February, 2011.
PETITION BY TNEB TO INVESTIGATE ANY GAMING BY THE GENERATORS PETITION NO:- 90/2005 CERC HEARING ON 06-OCT-05.
GRID OPERATION AND CONTROL. MAIN COMPONENTS OF THE GRID  GENERATION  LOAD  TRANSMISSION NETWORK.
W E L C O M E Power Grid Corporation of India Limited.
SRLDC WELCOMES SHRI VISHNUVARDHAN REDDY DIRECTOR(F) KPC.
Indian Power System Peculiarities & Solutions S K Soonee Executive Director NRLDC.
Anil Thomas Asst. Executive. Engineer Southern Regional Power Committee Central Electricity Authority.
Low Peak Frequency High Off-Peak Frequency Wide Frequency Fluctuation Damage to Generating Plants and Consumers’ Equipment Merit Order not followed - Optimizat.
ABT / IEGC CLAUSES While making or revising their declaration of capability, the generator shall ensure that their declared capability during peak hours.
1 SCOPE OF THE PRESENTATION Grid operation - overview Availability Based Tariff Benefits to Region & it’s constituents Intra_state ABT – it’s necessity.
HYDRO TARIFF Commission Tariff Notification 26/03/01 Commission Tariff Notification 26/03/01 Applicable Period 01/04/01 to 31/03/04 Applicable Period 01/04/01.
1 Technical and Commercial Aspects K.RAMAKRISHNA DGM, SRLDC DGM, SRLDC.
UI IN SR (FROM 01/01/03 TO 13/05/07) TOTAL UI TURNOVER :- 13,831 MU TOTAL UI AMOUNT DISBURSED:- 3,177 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT.
IMPACT OF ABT, NETWORK STRENGTHENING ON GRID OPERATION IN KARNATAKA SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED ADVANTAGE.
1 INTRA – STATE AVAILABILITY BASED TARIFF (ABT) A Presentation on INTRA – STATE AVAILABILITY BASED TARIFF (ABT)
Settlement System under ABT Regime. WHAT IS SETTLEMENT ? “ Settlement means finalisation of payment bill after consumption” To be FAIR and EQUITABLE To.
AN OVERVIEW IN RESPECT OF CPP’S ON ALL INDIA BASIS.
G1 G2 SERC SLDC SEB/STU State Govt. RLDC REB CTU CERC Central Govt. CEA ISTS ISGS Load L1L2 Intra State System IEGC to Operate on the periphery X=- GLG.
-- Bhanu Bhushan -- < > (August, 2011)
POWER SECTOR REFORMS Grid Operation and Control in the changed Scenerio.
AN OVERVIEW IN RESPECT OF CPP’S IN SOUTHERN REGION STATES.
Availability Based Tariff (ABT) in Northern Region.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED WELCOME TO V MADHU, MD, KPTCL.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
AVAILABILITY BASED TARIFF AND SCHEDULING MECHANISM.
Issues related to UI pool. Payment to pool account by KPTCL and Pondy Till June 2010 payment to UI pool by KPTCL and Pondy was through cheque/DD. Pondy.
1 ABOUT 7000 MW OF CAPACITY IS BELOW 100 Ps ABOUT14200 MW OF CAPACITY IS BELOW 200 Ps ABOUT MW OF CAPACITY IS BELOW 300 Ps CUM. INS. CAP.
NORTHERN REGIONAL LOAD DISPATCH CENTER 1.Revision Of Ceiling Of UI Rates and slope. 2.Revision Of Schedule after a Transmission Constraint is over. 4.RLDC’s.
SOUTHERN REGIONAL GRID ▀ Centre Generating Stations in the Region are Ramagundam Super Thermal Power Stn. : 2,600 MW (200x x4) Neyveli Lignite Corporation.
1 SOUTHERN REGIONAL LOAD DESPATCH CENTRE POWER GRID CORPORATION OF INDIA LIMITED PRESENTATION ON ROLE OF REGULATORS IN SELLING EXCESS POWER FROM CPPs 31ST.
Issue of Declared Capacity (DC), and Actual Generation (AG) by Generating Stations Hon’ble Commission has issued Interim order dated 19/ directing.
Demarcation of responsibilities (as per IEGC) 1. REGIONAL GRID SHALL BE OPERATED AS LOOSE POWER POOLS WITH STATES HAVING FULL OPERATIONAL AUTONOMY. 2.SYSTEM.
UI IN SR (FROM 01/01/03 TO 12/08/07) TOTAL UI TURNOVER :- 14,596 MU TOTAL UI AMOUNT DISBURSED:- 3,434 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT.
INJECTING UTILITYSTATEEXPORT (MU) TNEBTAMILNADU673 KPTCLKARNATAKA205 KSEBKERALA1792 APPCCANDHRA PRADESH426 JINDALKARNATAKA274 KPCLKARNATAKA593 JSWELKARNATAKA1058.
Southern Regional Power Committee Central Electricity Authority.
AVAILABILITY BASED TARIFF. - Tariff structures - Two part tariff - Concept of ABT - ABT structure - Expectations from OEMs/Utilities Session outline.
MERIT ORDER SCHEDULING AND DESPATCH V. K. AGRAWAL NRLDC.
OPEN ACCESS IN INTER STATE TRANSMISSION 29 TH MARCH TH MARCH 2004.
Grid Operation --- Role of RLDC. Contents Load Generation Balance Electricity Accounting Real Time Trends ABT Feedback Inter Regional Exchanges Loading.
POWER GRID CORPORATION OF INDIA LIMITED Northern Regional Load Despatch Centre (NRLDC) WELCOMES TANZANIAN DELEGATION 26th August 2003.
Economic Operation of Power Systems
Hon’ble Commission has issued Interim order dated 19/ directing :
KADAMPARAI PUMP OPERATION
REGIONAL ENERGY ACCOUNT BASED ON AVAILABILITY BASED TYARIFF
Queries raised by Director (Tariff) on ARR and Tariff Application of CESU for FY on
DEC System Voltage Planning - June 2018
“ MERIT ORDER SCHEDULING AND
Presentation transcript:

GRID STATUS – PRE - ABT Very wide Frequency fluctuations 48.0Hz to 52 Hz. Low Grid Voltages 400kV going down up to 330kV Frequent Grid Disturbances Sub-Optimal Operation High Technical loss Overdrawals at low frequency – might is right Grid Operation on fire fighting instead of Optimisation & Economy

Components of inter-utility tariff (Pre – ABT Mechanism) Fixed charges Interest on loans Depreciation O & M charges Return on equity Interest on Working Capital Energy charges (fuel cost) Incentives Surcharge & other levies No charge for reactive energy

Unscheduled Interchange (UI) Payment to Inter State Generating Stations (ISGS) from beneficiaries under Availability Based Tariff (ABT) Capacity charges Energy charges Unscheduled Interchange (UI)

CAPACITY CHARGE Capacity charge will be related to ‘availability’ of the generating station and the percentage capacity allocated to the state. ‘Availability’ for this purpose means the readiness of the generating station to deliver ex-bus output expressed as a percentage of its rated ex-bus output capability.

ENERGY CHARGE Energy charges shall be worked out on the basis of a paise per kwh rate on ex-bus energy scheduled to be sent out from the generating station as per the following formula Energy charges = Rate of energy charges (paise/kwh) x Scheduled Generation (ex-bus MWh)

UNSCHEDULED INTERCHANGE (U I) : Variation in actual generation / drawal with respect to scheduled generation / drawal shall be accounted for through Unscheduled Interchange (UI). UI for generating station shall be equal to its total actual generation minus its scheduled generation. UI for beneficiary shall be equal to its total actual drawal minus its total scheduled drawal.

UNSCHEDULED INTERCHANGE (U I) : UI shall be worked out for each 15 minute time block. Charges for all UI transactions shall be based on average frequency of the time block. UI rates shall be frequency dependent and uniform throughout the country.

UI RATE Rate of Unscheduled Drawal/Injection Frequency (Hz) Rate (p/u) Above 50.5 50.0 150 49.8 210 49.0 and below 570

AVAILABILITY BASED TARIFF CAPACITY CHARGE ENERGY CHARGE ADJUSTMENT FOR DEVIATIONS (U I CHARGE) (A) = a function of the Ex-Bus MW availability of Power Plant for the day declared before the day starts x SEB’s % allocation from the plant (B) = MWh for the day as per Ex-Bus drawal schedule for the SEB finalised before the day starts x Energy charge rate (C) = Σ (Actual energy interchange in a 15 minute time block – scheduled energy interchange for the time block) x UI rate for the time block TOTAL PAYMENT FOR THE DAY = (A) + (B) ± (C)

FEATURES : No complication regarding deemed generation. (A) and (B) do not depend on actual plant generation / drawal. No metering required for this as they are based on off-line figures. All deviations taken care of by (C) No complication regarding deemed generation. Perpetual incentive for maximizing generation and reducing drawal during deficit, but no incentive to over generate during surplus. ESC TO EXIT

TOTAL UI AMOUNT DISBURSED:- 2753 CR AVG WEEKLY TRANSACTION:- 61 MU UI IN SR (FROM 01/01/03 TO 07/01/07) TOTAL UI TURNOVER :- 12842 MU TOTAL UI AMOUNT DISBURSED:- 2753 CR AVG WEEKLY TRANSACTION:- 61 MU AVG WEEKLY UI AMOUNT DISBURSED:- 13 CR

SUMMARY OF UI – 190 WKS (FROM 01/JAN/03 TO 07/JANUARY/07) AP KAR KER TN PONDY Total UI exported(-) / Imported(+) in MUs -3674 5213 283 1819 -260 Total amount paid in Crores Rs. -528 983 -81 458 -51 Average rate of UI in paise/unit 144 189 285 252 195

UI EXCHANGES AND AVG. RATES IN RESPECT OF DIFFERENT CONSTITUENTS IN SR 817MU 2659MU 5164MU 1337MU 5046MU 658MU AP KAR KER TN 111MU 949MU

IR EXCHANGES OF SR IN THE FORM OF UI TRANSACTION WITH WR TRANSACTION WITH ER Energy Imported 919 MU (IMPORT BY SR) 985 MU Net Saving to each SR and WR/ER Constituents due to differential tariff Rs. 115.8 Cr. Rs. 49.40 Cr. Energy Exported 763 MU (EXPORT BY SR) 450 MU ESC TO EXIT