Madrid Forum (16 October 2007)

Slides:



Advertisements
Similar presentations
XVII Madrid Forum January 2010 ERGEG Gas Regional Initiatives P rogress and future work Peter Plug NMa, Director.
Advertisements

Workshop on transportation routes Region South-South East 24th November 2006, Vienna.
Gas Regional Initiative - Region South-South East 3rd Implementation Group Meeting Towards a Regional Entry-Exit System in the SSE Gas Market. A Preliminary.
2nd RCC Meeting – Region South-South East 13th 2006, Vienna.
European Transparency Project Progress Olaf Islei European Strategy and Environment 04 September 2008.
Is the regulatory toolset right or is there a need for enhanced regional regulatory oversight? The Regional Initiatives: Europe’s key to energy market.
6th RCC Meeting – Region South-South East 30th March 2007, Milano.
1st Stakeholder Group Meeting Region South-South East 27th September 2006, Bratislava.
Gas Regional Initiatives (GRI) – Progress Report Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG) XIV Madrid Forum, May 2008.
1st RCC Meeting – Region South-South East June 1, 2006, ROME.
Electricity Regional Initiative Central South European Region Draft Report on Transparency for the CSE-Region Jan Müller Bundesnetzagentur ERI Central.
GRI SSE – latest developments as seen by a concerned TSO OMV Gas, November 2007.
The Regional Initiatives: Progress and Prospects Conference Brussels, 28 March 2007 Mr Walter Boltz ERGEG Gas Focus Group Chair Status Report of the Gas.
2nd IG Meeting – Region South-South East 5th July 2007, Krakow, Poland.
XIV Madrid Forum, May 2008 Regulation 1775/2005: Compliance Monitoring Report Mr. Walter Boltz ERGEG’s Gas Focus Group (GFG)
9th RCC Meeting – Gas Regional Initiative (GRI) Region South-South East 22 January 2008, Prague, Czech Republic.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
7th IG Meeting, GRI SSE Milano, Italy, 26 March 2010 GRI South South-East Region.
Madrid Forum, 17 October 2007 Gas Regional Initiative Coherence and Convergence.
8 February Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
XVI th Madrid Forum Madrid, 28 May 2009 Walter Boltz (Gas Working Group Chair) Transparency guidelines and GRI transparency work.
GTE views on the role of TSOs As foreseen in the Third Package Joint Workshop ERGEG GRI SSE and EFET 21 January 2008.
3rd SG Meeting – Gas Regional Initiative (GRI) Region South-South East 22 January 2008 Prague, Czech Republic.
TITRE XXI Madrid Forum 22nd and 23rd March 2012 GRI SSE Progress and Outlook Walter Boltz GRI SSE Co-Chair.
Joint Workshop EFET and GRI REM SSE 21 January 2008, Prague, Czech Republic.
3rd IG Meeting – Region South-South East 9th October 2007, Maribor, Slovenia.
Role of Storage Facilities GTE 2nd Annual Conference, 23./ – Copenhagen © VNG 2004 Barbknecht Speaker: Klaus-Dieter Barbknecht Director Gas Transport.
Transmission Transparency Workshop European Strategy and Environment 10 July 2008.
GTE+ progress towards ENTSOG Jacques Laurelut GTE President & GTE+ Transition Manager GIE Annual Conference 2008, Bucharest.
1st Implementation Group Meeting – Region South-South East 13th 2006, Vienna.
SOUTH SOUTH-EAST GAS REGIONAL INITIATIVE WORK PLAN Francesco Cariello, AEEG 20 th Madrid Forum, September 2011.
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Lord Mogg Chair, ERGEG Madrid Forum, 14/15 January 2010 Strategy for market integration and the role of the Regional Initiatives.
Walter Boltz, Chairman ERGEG Gas Working Group 17 th Madrid Forum 14 January 2010 Capacity allocation and congestion management in natural gas transmission.
Implementation progress – second stage Transmission Transparency Workshop London, 14 November 2008.
18 December Study Co-Ordination on Day Ahead Capacity in Bunde/Oude Statenzijl and Ellund EC-Operators of Implementation Group ERGEG Regional Gas.
Workshop on transportation routes Region South-South East 24th November 2006, Vienna.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
Region South-South East
Market integration in the CEE countries
GRI SSE Work Plan Project proposal of HEA
10 year investment plan ERGEG approach and contribution
Transparency Project GRI NW Region
New transparency guidelines
FlorenceForum November 2008
ERGEG Gas Regional Initiative NW 5th Stakeholder Group Meeting
40th IG meeting 29th November 2016
EU Implementation Programme
Region South-South East
Workshop on transportation routes Region South-South East
ERGEG GRI South South East – , Maribor
ERGEG GRI – N/NW Region Stakeholder Group Meeting
Logo(1.00”:3.33”) Font is Rotis Sans Serif however font may have to be embedded as it is important that this does not change on any presentations Size.
Achieving the Internal Gas Market The view of gas suppliers
GRI NW TRANSPARENCY PROJECT
Transparency Platform
Market integration in the CEE countries
GRI SSE Work Plan Project proposal of HEA
Market integration in the CEE countries
GTE Transparency Platform
Gas balancing – where next
Market integration in the CEE countries
40th IG meeting 29th November 2016
Market integration in the CEE countries
Gas Regional Initiative Update on progress and latest developments
EUROPEAN TRANSPARENCY UPDATE
GRI SSE Work Plan Project proposal of HEA
Theme 4: Regional Communication and Information Sharing
Market integration in the CEE countries
ประกาศกระทรวงอุตสาหกรรม ฉบับที่ 5292 (พ.ศ. 2562)
Presentation transcript:

Madrid Forum (16 October 2007) Interoperability An ERGEG Response Madrid Forum (16 October 2007)

Removing obstacles to implementation of IA/OBA Dan: Feedback von der Konferenz Region Number of IPs (GTE map) number of OBAs at IPs in % NNW 55 33 60% S 17 12 70% SSE 29 8 28%

Examples for implementation schedule of IA/OBA Interconnection point (GTE map) affected TSOs reported status actual implementation? Lanzot (54) RWE TN SPP under negotiation Hora Svate Kateriny (22b) WINGAS in place OK Waidhaus(24) EON GT, GDF DT Oberkappel (25) BOG Velke Kapusany (55) NAFTOGAZ Tarvisio (49) TAG SRG Murfeld (51) OMV GEOPLIN end 2007? Gorizia (48) Baumgarten (55) OMV, TAG, BOG

ERGEG view Voluntary implementation of CBPs is unsatisfactory Sufficient time was foreseen for their implementation CBPs shall be made legally binding EASEE gas as best platform to develop CBPs since all stakeholders are involved in the drafting process – not just TSOs How to ensure voluntary implementation under the 3rd package? Track record of “voluntary compliance” is not very good !

Further information www: www.ergeg.org Contact: Walter Boltz Email: walter.boltz@e-control.at Tel.: +43 1 24 7 24 201 Fax: +43 1 24 7 24 900