Technische Universität München

Slides:



Advertisements
Similar presentations
B. KetzerGEM-TPC GEM-TPC Meeting Bernhard Ketzer Technische Universität München 14 February 2008 Telephone Conference.
Advertisements

Slide 1 sCVD Diamond for the CMS Pixel Detector May 2004 R.Stone, Rutgers J.Doroshenko, L.Perera, S.Schnetzer RD42 Collaboration Meeting Overview.
Luminosity Monitor MWPCs, test beam 22 results. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
D. Peterson, “Tracking Detector R&D at Cornell University and Purdue University” ALCPG SLAC 07-Jan Tracking Detector R&D at Cornell University and.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
SPiDeR  SPIDER DECAL SPIDER Digital calorimetry TPAC –Deep Pwell DECAL Future beam tests Wishlist J.J. Velthuis for the.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Run Coordinator Weekly Report EG6 Commissioning October Raffaella De Vita.
Large Area Endplate Prototype for the LC TPC 1 D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, M. Dixit, A. Le Coguie, R. Joannes, S.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
GEM MINIDRIFT DETECTOR WITH CHEVRON READOUT EIC Tracking Meeting 10/6/14 B.Azmoun, BNL.
Prediction W. Buchmueller (DESY) arXiv:hep-ph/ (1999)
Detector R&D for Muon Chamber Anand K. Dubey For VECC group.
The AFTER electronics from a user’s point of view D. Attié, P. Colas Mamma meeting,CERN Feb T2K electronics.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
NUMI Off Axis NUMI Off Axis Workshop Workshop Argonne Meeting Electronics for RPCs Gary Drake, Charlie Nelson Apr. 25, 2003 p. 1.
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
Mariana Petris, NIPNE Bucharest CBM Meeting, March 9 -12, 2005 HIGH COUNTING RATE TRANSITION RADIATION DETECTOR Bucharest Prototype In Beam Tests.
E. GaruttiCALICE collaboration meeting, Prague CERN Test beam (part II) Erika Garutti, Fabrizio Salvatore.
2/4/2001Ludovico Pontecorvo INFN Roma1 Plans for the H8 system test: 2001/2002 Goals for the 2001/2002 Test beam Beam layout Chamber Supports 2001 Schedule.
1 The ATLAS SemiConductor Tracker commissioning at SR1 APS and JPS joint conference October 30, 2006 Ryuichi Takashima ( Kyoto Univ. of Education ) For.
TB Peter Glässel, Heidelberg1 TPC Status Report Project leader: Peter Braun-Munzinger, GSI Darmstadt Deputy project leader: Johanna Stachel, Heidelberg.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
D. Attié, P. Baron, D. Calvet, P. Colas, C. Coquelet, E. Delagnes, R. Joannes, A. Le Coguie, S. Lhenoret, I. Mandjavidze, M. Riallot, E. Zonca TPC Electronics:
HBD Report Craig Woody BNL DC Meeting January 7, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
D. Attié, P. Colas, E. Delagnes, M. Riallot M. Dixit, J.-P. Martin, S. Bhattacharya, S. Mukhopadhyay Linear Collider Power Distribution & Pulsing Workshop.
Tracking at the Fermilab Test Beam Facility Matthew Jones, Lorenzo Uplegger April 29 th Infieri Workshop.
1 TPC Large Prototype (LP) Beam Tests Jan Timmermans NIKHEF/DESY (for LCTPC Collaboration) ALCPG 2011, Eugene.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
TPC FEE status and more TUM Physics Department E18 I.Konorov.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
Overview of TPC Front-end electronics I.Konorov Outline:  TPC prototype development  Readout scheme of the final TPC detector and further developments.
STT Detector risk’s assessment. STT detector work packages Straw Tubes modules Straw Tracker mechanics Front-End Electronics Analog electronics Digital.
CALICE, Shinshu, March Update on Micromegas TB analysis Linear Collider group, LAPP, Annecy CALICE collaboration meeting 5-7 March 2012, Shinshu,
Development of 100 MHz trackers
Slow Control and Run Initialization Byte-wise Environment
Slow Control and Run Initialization Byte-wise Environment
Calorimeter Status Electronics Installation and Commissioning
Testbeam Planning Common to all testbeams:
FEE for TPC MPD__NICA JINR
The GOOFIE detector as a Ternary Mixture Monitor
JEDI polarimetry – Developments at SMART|EDM_Lab
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
Introduction Status before the 2009 run Results from the 2009 run
Tests of a MM octant prototype towards a Micromegas TPC Polarimeter
Overview and status of the ATLAS Pixel Detector Attilio Andreazza Università di Milano and I.N.F.N. for the ATLAS Pixel Collaboration Layout of the ATLAS.
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
Large Area Endplate Prototype for the LC TPC
AT-TPC project at NSCL/MSU
Week coordinator report - C. Marchand
Silicon Lab Bonn Physikalisches Institut Universität Bonn
MAGIX Detectors Overview
Power pulsing of AFTER in magnetic field
TPC Large Prototype Toward 7 Micromegas modules
Test Beam Measurements october – november, 2016
Electronics and DAQ for the GEM Detector
TPC Detector Control System
PID meeting Mechanical implementation Electronics architecture
Pierluigi Paolucci & Giovanni Polese
Covering a Large Area ILC-TPC endplate
The LHCb Front-end Electronics System Status and Future Development
Beam Monitors with GEM detectors
Presentation transcript:

Technische Universität München GEM-TPC Meeting Bernhard Ketzer Technische Universität München 03 March 2009 GSI

Agenda Communications (B. Ketzer) Status of TPC FE and readout electronics (I. Konorov) Status of GEM-TPC prototype (B. Voss) Pad plane design (M. Berger) TPC calibration concepts (A. Winnebeck) a.o.b.

ELSA Beam Test

ELSA Beam Test Achievements: All detectors installed: trigger scint., 4 Si planes, 4 GEM planes, TPC Slow control for HV and LV Readout electronics and DAQ: FE DB, DATE, S-Link 1 EVB, 1 ROB, 1 HotGeSiCA (Si/GEM), 2 HotGeSiCA (TPC) TCS + trigger module Decoding & online monitoring Commissioning of beam telescope Noise: ~ 700 e- (Si), ~ 1400 e- (GEM) Latencies adjusted fo GEM/Si Efficiency scans for GEM TPC tests Drift field stable up to 400 V/cm, GEM HV up to 106% of nominal 16 T2K chips read out (one by one), noise ~900 e-

Noise in the Laboratory

Noise at ELSA

ELSA Beam Test Problems: Readout FE DB configuration error Synchronization problem for GEM detectors No remote power cycle for ADCs Only 256 samples could be read for TPC 2nd HotGeSiCA (TPC) did not send data S-Link readout errors when TPC is read together with other equipment Silicon pedestal file not written Slow Control Web interface for HV/LV too slow and not intuitive to use No online gas flow monitoring for GEM/TPC Gas analysis not operational Pressure gauge not available       being improved

ELSA Beam Test Items to be addressed: Analysis of beam telescope performance Track reconstruction Alignment Residuals, Efficiencies TPC latch all data understand pulse height spectra correlations with trigger? TPC readout understand problems with latch readout understand timing (inject test pulse) simultaneous latch readout of all chips sparse readout work in progress   almost done Goal: Test sparse readout of TPC during present beam time at ELSA! ~ 3 days of beam as main user in March-April

T2K Chip Timing Injection of a test pulse synchronized with the trigger Sensitivity: 0.1 fC/ADC ch. Timing: Latency between TCS trigger and pulse measured: 1ms 25 ms time gate (511 samples at 20 MHz)