EVLA M/C Software PDR, 14 May 2002

Slides:



Advertisements
Similar presentations
14-Jun-2004EVLA Software Design Review Transition Plan Bill Sahr 1 EVLA Hybrid Array & Transition Plan.
Advertisements

Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Budget, Schedule, Contingency Mark McKinnon Project Manager.
DATA TRANSMISSION SYSTEM MIKE REVNELL. OUTLINE Top level specifications Basic architecture Fiber plant DTS module Digitizers Formatter Deformatter Transition.
The Prototype Correlator Sonja Vrcic Socorro, 5. December, 2006.
Author Bob Broilo EVLA Hardware Monitor & Control PDR March 13, ANTENNA SERVO AND SUBREFLECTOR CONTROLLER.
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
Systems Integration and Testing EVLA Advisory Committee Meeting, March 19-20, 2009 Jim Jackson Systems Engineer.
Author George Peck EVLA System PDR December 4-5, EVLA Monitor and Control Hardware.
SJDEVLA Advisory Committee Meeting September 6-7, EVLA Production and Maintenance Steven Durand presenting for the E lectronics Division.
Mark McKinnon NSF Mid-Project Review May 11-12, Budget, Schedule, Contingency Mark McKinnon Project Manager.
James Robnett EVLA M&C Hardware PDR March EVLA M&C Hardware PDR Voice Communications.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
Peter NapierEVLA Correlator CoDR Nov 2, EVLA Correlator CoDR P. Napier Overall EVLA Project Plan.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
A Modular K-Band Focal Plane Array for the Green Bank Telescope Matt Morgan National Radio Astronomy Observatory 9/28/2007.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
James Robnett EVLA M&C Software PDR May EVLA Monitor & Control Software PDR Monitor & Control Network Security.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
Correlator GUI Sonja Vrcic Socorro, April 3, 2006.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
Bill SahrNSF Review May , EVLA Monitor & Control.
Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Overall Data Processing Architecture EVLA timeline and priorities.
Author Wayne M. Koski EVLA Monitor & Control Hardware CDR October 20, EVLA Monitor and Control Monitor & Control Transition.
Author Wayne M. Koski EVLA Monitor & Control Hardware PDR March 13, EVLA Monitor and Control Monitor & Control Transition.
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Management Plan Peter Napier Project Organization Schedule Budget.
SAGE meeting Socorro, May 22-23, 2007 WIDAR Correlator Overview Michael P. Rupen Project Scientist for WIDAR & Software.
Future LBO Developments
EVLA Project Peter Napier
Committee Charge Fred K.Y. Lo
Monitor and Control Software
EVLA Advisory Committee Meeting System Status
EVLA NSF Mid-Project Review System / Antenna Status
EVLA NSF Mid-Project Review System / Antenna Status
Obs2script Bryan Butler.
Terry Cotter LO/IF Group Leader
Budget, Schedule, Contingency
EVLA System PDR System Overview
Centre of Excellence IT for All
Software Requirements
Scheduling Toolkit Observation Scheduling Boyd Waters, NRAO
VLA to EVLA Transition Plan
EVLA Receivers PDR Transition Planning Author Daniel (Mert) Mertely
Terry Cotter LO/IF Group Leader
EVLA Advisory Committee Meeting
EVLA Advisory Committee Meeting System Status
Software Requirements
PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem.
Charge to the Review Panel
EVLA Monitor & Control System
Gustaaf van Moorsel September 9, 2003
Software Requirements
ENGINEERING REQUIREMENTS FOR BENCH TESTING, SYSTEM INTEGRATION, AND TEST ANTENNA Author George Peck EVLA Software M&C PDR Date May 14 – 15, 2002.
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EVLA M&C Components Observation Executor, Interim & Final Obs2script
EVLA Racks Bins and Modules PDR
Correlator Growth Path
EVLA Advisory Committee Meeting System Status
EVLA Advisory Panel Mtg. System Overview
Presentation transcript:

EVLA M/C Software PDR, 14 May 2002 PDR Guidelines The purpose of the PDR of an EVLA Subsystem is principally to review 3 questions:   Are the top level performance requirements for the subsystem complete and adequate? Have the correct design solutions been selected for study and development during the EVLA Design Phase? Are there important alternate solutions that are not being studied. Has an adequate procurement plan been identified for the subsystem? P.Napier EVLA M/C Software PDR, 14 May 2002

EVLA Transition Hardware Old Systems New Systems Front End Front End LO LO IF IF Digitizer Waveguide Transmission Fiber Transmission D/A Digital filter Baseband Digitizer Old M/C System New M/C System Old Correlator New Correlator

EVLA M/C Software PDR, 14 May 2002 Project Schedule Start installation of fiber optics cables on Y Q4 2002 Prototype EVLA system lab integration and test Q1 2003 Install prototype EVLA system on EVLA Test Antenna Q2 2003 Start EVLA electronics production Q4 2003 Start retrofitting 7 antennas/year with new system Q2 2004 Start observing in “transition” mode Q2 2004 Test of prototype correlator on 3 or 4 antennas Q4 2005 Start outfitting new correlator room Q2 2006 Start tests of first correlator subset at VLA Q4 2006 First “shared-risk” science with new correlator subset Q2 2007 Last antenna retrofitted to EVLA design Q1 2008 New correlator declared “operational” Q1 2009 Last EVLA receiver installed Q1 2010 P.Napier EVLA M/C Software PDR, 14 May 2002