LCLS Extruded Vacuum Chamber Status

Slides:



Advertisements
Similar presentations
1 Statistics -Quality Control Alan D. Smith Statistics -Quality Control Alan D. Smith.
Advertisements

Vacuum & Cooling Systems Updates F. Makahleh On behave of Vacuum & Cooling Group TAC 2013, F. Makahleh, Vacuum & Cooling 1.
Vacuum Vessel Production Readiness Review
FAC10/07 October 30, 2007 Greg Wiemerslage 1 The Extruded Aluminum Chamber…
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
FAC, 10/12/06 D. Schultz 1 e-Beams Systems Update Linac Injector Undulator Production MMF commissioning ARR David Schultz.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
Geoff Pile FAC Review - Undulator 17 June 2008 LCLS Undulator System Status and Schedule Geoff Pile.
October 30, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Geoff Pile, Dean R. Walters, Soon-Hong Lee,
LCLS Prototype Undulator Design LCLS Prototype Undulator Design Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
GLAST I&T January T Borden 1 Tracker EM Mechanical Mock-up T Borden I&T Tracker Mock-up.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
Geoff Pile LCLS Und. System FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Update FAC Review October 29 th (30 th.
Geoff Pile LCLS Und. System Fabrication FAC 29 th, 30 th & 31 st October 2007 LCLS Undulator System Fabrication Schedule FAC.
ORT-E A turn-key Engineering Based Manufacturer and systems integrator. Oak Ridge Tool Engineering, Inc. Oak Ridge Tool Engineering, Inc. Engineering Systems.
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
STATUS OF THE MEG CRYOSTAT Construction status Schedule ____________________________________________________________ 04/Agust/06 F. Raffaelli, L. Delfrate.
Oct. 12, 2006 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
D Walters Undulator Systems – BFW April 30, 2008 Production Status of the Quad Spool J Morgan – Engineer Bellows Module Soon-Hong.
Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 17 July 2012 LAV construction & installation status.
11/2/2005Mike Viola1 November Lehman Review November 2, 2005 NCSX VVSA NCSX Vacuum Vessel Fabrication Major Tool and Machine – S F 3 120° segments.
Experience Fabricating the Storage Ring Vacuum Chambers for NSLSII
Lavs Issues Lav 12. Tube Planning future activities. Conclusions.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
Procurement and Manufacture of LCLS Undulators FY 04 Activity: Complete design of Second Prototype Undulator This will include field control comb Procure.
Feb. 20, 2006 Diagnostics-Vacuum Overview Dean R. Walters 1 LCLS Undulator Diagnostics and Vacuum System Overview Dean R. Walters.
9/28/20051 Mike Viola 1, T. Brown 1, P. Heitzenroeder 1, F. Malinowski 1, W. Reiersen 1, L. Sutton 1, P. Goranson 2, B. Nelson 2, M. Cole 2, M. Manuel.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
January 22-24, LCLS Week 2 The Extruded Aluminum vacuum chamber…
Cryomodule Interconnect Installation Issues A Comparison of XFEL to LCLSII Karen Fant 7/29/2015.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
Matthew Moulson for the LAV Working Group NA62 Photon-Veto Working Group Meeting CERN, 5 January 2013 LAV construction & installation status.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
NCSX Vacuum Vessel Fabrication
Inspection of stock materials for defects
Manufacturing of the first FCC-hh beam screen prototype for ANKA
Complementary ISTC Projects #3888, 3889p
Preliminary Y-chamber specifications – First draft
Principle of the process Design For Manufacturing (DFM)
Diffuser status October 2017
Far Detector Activities Late 2017 – Early 2018
Status of the PANDA Solenoid Magnet Production in BINP
Lead Content Calculation
LCLS Week 2 The Extruded Aluminum vacuum chamber…
Undulator Assembly Procedure
On the accuracy of port assembly at Wendelstein 7-X
LTU/Undulator Installation Status
Undulator Vacuum System
Additional Upstream Coil Shielding
Installation of Photon Beam Transport to FEH
Undulator System Components Status Dean Walters
Undulator Vacuum System
Undulator Cost & Schedule Patric Den Hartog, ANL April 24, 2002
LCLS Undulator System Status and Schedule
LCLS Undulator System Production Management
Two-beam Test-stand Design and Construction Status
E-Beams Systems Manager
LTU/Undulator Installation Status
LCLS Vacuum System Plans (July 07)
LCLS Undulator System Status and Schedule
Chamber & Vacuum System
Electron Beam Systems ETC and Methodology
Aluminum Clamshell Vacuum Chamber Development Plan
Undulators Subgroup Summary April FAC Review K. Robinson, J
Undulator Assembly and Installation Planning
Undulator and Magnet Production Status 25 October 2006
LCLS e- Beams Systems Manager
Undulator Physics Issues Heinz-Dieter Nuhn, SLAC / LCLS July 11, 2007
Presentation transcript:

LCLS Extruded Vacuum Chamber Status (current status) Emil Trakhtenberg Greg Wiemerslage Mark Erdmann Patrick Den Hartog April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status

LCLS vacuum chamber current status All 41 chambers are fully machined. 41 chambers have been welded. 35 chambers were inspected, baked, certified and shipped to SLAC. The rest of the chambers will be shipped to SLAC before 05/10/08. April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status

LCLS Extruded Vacuum Chamber Status Changes in LCLS VC design after production of the first six chamber to simplify its alignment First six chambers All other chambers April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status

LCLS vacuum chamber adjustment and wall thickness inspection After changing of the chamber design and adjusting system design chamber alignment usually took about 4 hours. Wall thickness variation for the most of the chambers is within ±40µ. Some results of the vacuum chamber inspection are shown on the next slides April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status

LCLS Extruded Vacuum Chamber Status Upper Tolerance Lower Tolerance April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status

LCLS Extruded Vacuum Chamber Status Upper Tolerance 1st Delivery April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status

LCLS VC alignment and thickness inspection April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status

Graphical Display of Surface finish Data Should be Avoided Acceptable Very Desirable April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status

Surface Finish Summary The average of all vacuum chambers is 14.86 mrad in Z′ and 35.14 mrad in X′ Extrusions 7, 10, 16, 28 and 35 were sacrificed to verify surface finish in the middle of the extrusions April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status

LCLS VC on the weldment table Flange installation fixture April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status

End bi-metal flange welding All bi-metal flanges were polished, inspected and welded April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status

LCLS Extruded Vacuum Chamber Status Inspection and correction of the LCLS VC end flange perpendicularity (.003 - .004 precision) April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status

Inspection of the total length of the LCLS VC Initial attempt to inspect the vacuum chamber length using caliper, gage block and filler gage failed. Finally length of the all vacuum chambers after welding was measured successfully using laser tracker. April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status

Summary of the Inspection of the total length of the LCLS VC Upper Tolerance Lower Tolerance April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status

LCLS VC on the baking stands April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status

LCLS VC on the baking stands Note: Ion-pumps are still off April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status

LCLS vacuum chambers in the shipping crate April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status

CONCLUSION We plan to deliver all LCLS VC to SLAC before 05/10/2008 Manufacturing and certification of the LCLS vacuum chambers is proceeding with the full agreement with our schedule and within the allocated budget. We plan to deliver all LCLS VC to SLAC before 05/10/2008 April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status

LCLS Extruded Vacuum Chamber Status ACKNOWLEDGMENTS A special “thank you” to: Joe Gagliano, George Goeppner, Dana Capatina, Scott Doran, Esiquio Salazar, Kevin Knoerzer, Russel Otto, Dan Nocher, Mike Bosek, Dan VanLannan, Wayne Michalek, Mark Martens, Paul Aguirre, Aaron Lopez, Lahsen Assoufid, Jun Qian, Albert Macrander; Frank Bock (“Cardinal aluminum Co.”), Don Fulcher (“Engineered Finishing Co.”), Simon Sorsher (“Hi-Tech Mfg.”). April 30, 2008, UNDULATOR WEEK 3 LCLS Extruded Vacuum Chamber Status