+ RRM SG Telecon 8/7/02 August 2000 doc.: IEEE /505r0

Slides:



Advertisements
Similar presentations
Radio Resource Measurement k and its Specification
Advertisements

Submission Page 1 August 2002 doc.: IEEE /503r0 Daryl Kaiser, Cisco Systems Radio Measurement: A Candidate Approach Daryl Kaiser (Cisco Systems)
Doc.: IEEE /080r0A Submission January 2003 Black/Kasslin/Sinivaara, NokiaSlide 1 A Framework for RRM Simon Black, Mika Kasslin, Hasse Sinivaara.
Wireless Packet Loss Rate Xiangzhou Chen Zhihan Xia.
Radio Resource Measurement k and its Specification
Doc.: IEEE /124r0 Submission January 2003 Byoung-Jo “J” KimSlide 1 RRM Requirements for Public WLAN Service Provider Byoung-Jo “J” Kim AT&T Labs-Research.
Doc.: IEEE s Submission March 2015 Mitsuru Iwaoka, Yokogawa Electric Co.Slide 1 Project: IEEE P Working Group for Wireless.
Submission doc.: IEEE /1042r0 September 2015 Wang Hao, Fujitsu R&D Center A Management Interface for Maintenance and Fault Analysis Date:
RRM Architecture Considerations
Doc.: IEEE /213r0 Submission February 2004 C. Wright, Azimuth Systems WPP SG Telecon Agenda for 26 Feb 2004 Charles R. Wright Azimuth Systems.
Sunhun Lee and Kwangsue Chung School of Electronics Engineering, Kwangwoon University 22 nd International Conference on Advanced Information Networking.
Submission Page 1 November 2002 doc.: IEEE /677r0 Daryl Kaiser, Cisco Systems Radio Measurement Actions Daryl Kaiser (Cisco Systems) 12 November.
January 2003 Richard Paine, Boeing Slide 1 doc.: IEEE /087r0 Submission Slide 1 Richard Paine, Boeing Voice Over IP Scenario For IEEE k.
Doc.: IEEE s Submission May 2015 Hidetoshi Yokora, Landis&GyrSlide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE /651r0 Submission November 2002 Richard Paine, BoeingSlide 1 + Radio Resource Measurement Tutorial.
Content Protection Support in
IEEE Working Group for Wireless Personal Area Networks (WPAN™)
Location-Enabled Network Services
RRM MIB Variable Structures
WPP SG Telecon Agenda for 19 Feb 2004
VHT SG PAR Feedback from Individuals
Monitoring Networks IEEE , Sydney, NSW May 13-17
IEEE P Working Group for Wireless Personal Area NetworksTM
+ RRM SG Telecon 8/21/02 August 2002 doc.: IEEE /506r0
+ RRM SG Telecon 8/14/02 August 2002 doc.: IEEE /506r0
doc.: IEEE <doc#>
K Ft Lauderdale 1/14/03 August 2002 doc.: IEEE /506r0
Content Protection Support in
VHT SG Report to EC Date: Authors: July 2008 April 2007
+ RRM SG Telecon 9/25/02 August 2002 doc.: IEEE /506r0
+ RRM SG Telecon 8/28/02 August 2002 doc.: IEEE /511r0
Overview of Cisco Per-client Extensions to MIB
k DFW 3/12/ WG Mid-Week Plenary August 2002
Submission Title: [802.11n Liaison Report May 2009]
UWB Teleconference Report
March 2015 doc.: IEEE s March 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title:
k Ft Lauderdale 1/13/ WG Plenary August 2002
In Radio Resource Measurement Jul 11
Coexistence Using k Measurements
Radio Resource Measurement Study Group – Wednesday Plenary
+ RRM SG Monterey 9/12/02 AM August 2002 doc.: IEEE /506r0
doc.: IEEE <doc#>
+ RRM SG Telecon 10/2/02 August 2002 doc.: IEEE /506r0
RRM and WLAN-WWAN handovers
+ RRM SG Monterey 9/12/02 PM August 2002 doc.: IEEE /506r0
Response to c Questions
k DFW 3/10/ WG Plenary August 2002
From mobile TV applications to VTS PAR Scopes
+ RRM SG Telecon 12/11/02 August 2002 doc.: IEEE /506r0
+ RRM SG Monterey 9/12/02 August 2002 doc.: IEEE /506r0
Radio Resource Measurement Closing Report to the Working Group
K Ft Lauderdale 1/14/03 August 2002 doc.: IEEE /506r0
July 2007 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: BAN Closing Report for San Francisco July.
k Ft Lauderdale 1/13/03 August 2002 doc.: IEEE /506r0
Approach to move TGk forward
Useful Radio Statistics
Submission Title: [VHT liaison report] Date Submitted: [15 May 2008]
VTS SG PAR Scope Topics Date: Authors: January 2008
+ RRM SG Telecon 1/8/03 August 2002 doc.: IEEE /506r0
doc.: IEEE <doc#>
平成31年4月 doc.: IEEE /424r1 July 2008 doc.: IEEE c
k Ft Lauderdale 1/16/03 August 2002 doc.: IEEE /506r0
Submission Title: [High Rate Study Group Monday Report to Excom]
November 1999 doc.: IEEE /119r0 November 1999
11k Evening Working Session Agenda
k DFW2 5/12/ WG Opening Plenary August 2002
RRM SG IEEE , Monterey September 9th-13th
+ RRM SG Monterey 9/10/02 August 2002 doc.: IEEE /506r0
WLAN Overlay with 60 GHz Channels
k Ft Lauderdale 1/13/03 Paine History with
Presentation transcript:

+ RRM SG Telecon 8/7/02 August 2000 doc.: IEEE 802.11-02/505r0 Richard Paine, Boeing Richard Paine, Boeing

August 2000 Agenda Richard Paine, Boeing

Meeting Objectives Introduce Webex Teleconferencing August 2000 Meeting Objectives Introduce Webex Teleconferencing Start Requirements Gathering Submission Topic Suggestions – Monterey State issues from Vancouver meeting Requirements gathering presentations Richard Paine, Boeing

Issues from Vancouver Scope of PAR Categories of requirements August 2000 Issues from Vancouver Scope of PAR Categories of requirements Content from wireless network management companies Content from users SEC approval timing for PAR and 5 Criteria Richard Paine, Boeing

Requirements Gathering August 2000 Requirements Gathering Requirements from users (Boeing, AT&T) XXX Requirements from network mgt company (Instant802) 359 Others? Present at Monterey or on teleconferences Subjects for Papers 474r1 Richard Paine, Boeing

Requirements Categories August 2000 Requirements Categories Data, Voice, Video Data – QoS, wireless net (a, b, g, h) Voice – RSSI, S/N, Delay, Jitter, Encryption, device processor, wireless net (a, b, g, h) Video – RSSI, S/N, Encryption, device processor, wireless net (a, b, g, h) Diagnostics (non-802.11, 802.11, other APs) Station Table (BSS and IBSS) Link stats (counts, data rates, RSSI, link margin) MAC Statistics (channel utilization, total stations, events) Events (auth, deauth, associate, deassociate, current MIB) Coexistence Measurements Richard Paine, Boeing

Paper Topics MIBs Signal Strength Standardizing RSSI August 2000 doc.: IEEE 802.11-02/505r0 August 2000 Paper Topics MIBs Signal Strength Standardizing RSSI Real Time Parameters Real Time Issues Retries Measuring Transmission Speeds Measuring Throughput in WLANs VOIP Radio Resource Issues Video Radio Resource Issues Additional Information needed in the MIBs (802.1x, 802.11, 802.1p) Diagnostics Needed for Effective Mgt of WLANs Richard Paine, Boeing Richard Paine, Boeing