Highway Design Class CTC 440.

Slides:



Advertisements
Similar presentations
Gerald L. Ullman, Ph.D., P.E. Texas Transportation Institute Designing and Maintaining a Pedestrian-Friendly Work Zone.
Advertisements

Interactive Highway Safety Design Model (IHSDM)
Lec 33, Ch.5, pp : Accident reduction capabilities and effectiveness of safety design features (Objectives) Learn what’s involved in safety engineering.
INTRODUCTION This chapter presents guidance on the application of geometric design criteria to facilities functionally classified as collector roads and.
Re-Design Of Nablus-Deir Sharaf Road Prepared by Enas Saleh Haneen Hetti Supervisor Prof.Sameer Abu-Eisheh.
AASHTO Subcommittee on Design Reducing Engineering Standards: Good or Bad? July 14, 2008 Marc Cote, P.E. (302) /14/08.
Interchange Design Nick Hoernke, Bill Roth and Eric Sorensen.
At-Grade Intersection
3R Standards Resurfacing, Restoration, & Rehabilitation Ch. 7 1.
Other Design Consideration TS 4447: Highway Geometric Design.
Lec 25, Ch.7, pp : Intersection types and design principles (Objectives) Become familiar with the typical intersection types (See figures 7-1 thorugh.
Introduction Transportation System Objectives : Military; Knit together the inhabitants of a territory by providing mutual access and communication; Economic.
Safety Audit Components Safety assessment for risk Management.
Detours – Selection and Design Highways & Engineering Conference March 2, 2006.
2014 CONSTRUCTION ESTIMATES Estimates Estimates 3 Point of the illustration? Document your assumptions.
 Life in communities has changed over the years.  One of those changes is in transportation. Transportation is a way of moving people or things from.
Highway Design Class CTC 440. Introductions Students Me.
Road Design.
1 At-Grade Intersection Design. 2 Objectives Define general intersection design objectives Describe factors that influence curb return design For a nice.
Highway Location Study CE 453 Lecture 4 See also lab 2 and lab 4 instructions, and EIS lecture notes See also 04 DOT development process.doc Refs:
Highway Location I. * Principles of Highway Location 1. allowing convenient, continuous, free-flowing traffic operation, and 2. best meeting the major.
Jason Chapman Data Collection & Management Systems.
4. GEOMETRIC DESIGN OF HIGHWAYS
Data Palooza Workshop May 9, 2013 Rabinder Bains, FHWA – Office of Policy and Government Affairs.
Transportation Asset Management PM Peer Exchange Section 3 Overview: Additional Asset Management Classes Connie Sorrell Chief of System Operations.
Design Criteria CTC 440. Objectives Know what “design criteria” means Determine design criteria for various types of facilities.
Evaluation and Redesign of Rojeeb Street. Objectives ▪ Evaluation of existing conditions of Rojeeb Street. ▪ Estimation of future conditions of Rojeeb.
Safety Audit Planned Project - Preliminary Design zGeneral Project Data yProject layout xRoad function Determine the road function. What kind of traffic.
HIGHWAY DESIGN PROCESS & ROUTE LOCATION Spring 2016.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
Geometric Design: General Concept CE331 Transportation Engineering.
1 THE HIGHWAY SAFETY MANUAL Michael S. Griffith Federal Highway Administration July 26 th, 2004.
Introduction CE331 Transportation Engineering Fall 2013 Dr. Reg Souleyrette.
Road Safety Audits Road School, 2011 Rick Drumm, P.E. Safety Engineer Federal Highway Administration.
FHWA: Revision of Thirteen Controlling Criteria for Design; Notice for Request and Comment. Comments Due: December 7, 2015 Jeremy Fletcher, P.E., P.S.M.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
Intersection Design Spring 2017.
Nixon Road Corridor Study: Findings & Options
Investigation of Road Project By S.N. Nanaware
Highway Alignment And Geometric Design
Rehabilitation Project
Project Management Team Meeting #3
North Lamar Boulevard Project
Interdisciplinary teams Existing or new roadway
Investigation of Road Project
General Tab Project, Cost Schedule, and Work Limits Roadway Character
INTERCHANGE DESIGN Fall 2017
Importance of Geometric Design
Highway Geometric Design Combination of Vertical and Horizontal Alignment.
Chapter 2 Geometric Design
Construction Management & Inspection
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Learning Objectives – Driver and Vehicle Characteristics
Using CMFs in Planning for Virginia’s Project Funding Prioritization
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Technical Committee on Geometric Design
Safety Audit Components
Route Location 01 Reference: Nicholas J. Garber, Lester A. Hoel, TRAFFIC AND HIGHWAY ENGINEERING, Fourth Edition Ch. 14, page 691.
Geometric Design: General Concept CE331 Transportation Engineering.
Design Criteria CTC 440.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
S.R. 26 Road Rehabilitation in Clinton County
HIGHWAY CAPACITY & LEVEL OF SERVICE (LOS)
3R Standards Resurfacing, Restoration, & Rehabilitation Note: Need to update based on revisions to Ch 7 of HDM (freeway and non-freeway now covered in.
School of Civil Engineering
Design Speed, Operating Speed, and Posted Speed Limit Practices
HIGWAY ENGINEERING Session 05
Walker Street Reconstruction Project 25% Design Public Hearing
HIGHWAY DESIGN PROCESS & ROUTE LOCATION
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
Presentation transcript:

Highway Design Class CTC 440

Introductions Students Me

Class Basics www.sunyit.edu/~barans/ Syllabus Tentative Schedule Lectures Labs Grades (PIN #’s)

Ch 5 of HDM: Basic Design Designing a section of highway is similar to designing a house Lots of little decisions along the way that impact the end product

Some Basic Elements Capacity/Level of Service Accident Analysis Terrain Data Requirements Right-of-Way Construction Cost Estimates Design Elements Design Considerations Intersections at Grade

Capacity / Level of Service Capacity analysis is used to estimate the traffic-carrying ability of existing and proposed traffic (LOS) is a qualitative measure used to describe the operational conditions within a traffic stream – driver’s viewpoint A (best) F (failure) LOS C – desirable; LOS D acceptable

Accident Analysis – Identify problems and incorporate countermeasures Collect data Determine accident rate and compare to statewide avg. Identify locational clusters Identify nonstandard or nonconforming features PIL/PII (priority investigation list/intersection) Utility Pole “bad actors”

Terrain Data Requirements Obtained via photogrammetry &/or field survey Base Mapping (horizontal) Edge of pavements, shoulders, sidewalks Buildings, fences, trees, tree lines Rock outcrops Utilities-lines, valves, manholes Streams, creeks Topography (vertical) DTM – digital terrain models Used for contours and cut cross-sections

Right of Way Amt. of land needed ARM-abstract request map ROW plan Power of eminent domain Types Fee, w/ access or w/o access PE (permanent easement) TE (temporary easement) TO (temporary occupancy, <$2500, minor grading/ditching) Entrance, approach, or driveway work release (no compensation General work release (no compensation)

Construction Cost Estimates Prepared throughout project life Ballpark (+/-50%) Preliminary (+/-20%) PEP (preliminary estimate program) or MEANS Detailed (+/-5%) PES (preliminary estimating system) or MEANS Economic Analysis Bridge rehab vs replacement Bridge abandonment vs preservation Pavt. Rehab options Accident reduction treatments Mobility betterment

Design Elements Design Vehicle Sight Distance Horizontal and Vertical Alignment Superelevation Climbing or emergency escape lanes Clear Zone Vertical and Horizontal Clearance Parking lanes, driveways Lane drops, medians Frontage roads HOV lanes, bus stops/turnouts/turnarounds

Design Considerations Joint Use of Highway (peds/bikes/utilities/transit) Driver Expectancy Geometric Considerations Noise Abatement Increase capacity w/o addl. Lanes ITS Ramp Metering Reversible-flow lanes Shoulders as traffic lanes HOV priority treatment

Intersections at Grade Use HCM to determine LOS/Capacity Intersection Geometries Angle (skew < 30 deg) Channelization/pavt width/radii Other Considerations Sight distance/access control signalization Medians Flush or Raised Median Openings

Highway Stuff 2007 Minneapolis Bridge Collapse Bolivia Road