KAMAN AEROSPACE GROUP L. Chodasiewicz - Supplier Quality Assurance.

Slides:



Advertisements
Similar presentations
AS9102 First Article Inspection Report
Advertisements

Final/Shipout Inspection Approved for Public Release.
 Corporate Profile  BOSS Overview  Current Solutions  BOSS Modules  COLORS - New BOSS Web Module  BOSS Benefits  Supplier XML Services and BOSS.
Premier Supplier of Energetic Mission Critical Solutions FORM 2716-A 01/12 Supplier PO Review Training.
First Article Inspection Report
Gilbarco Printer Assembly Process Flow Overview Next Generation Contract Manufacturing.
HACCP Manager Software™
Quality Assurance System
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
QLF Contract Quality Clauses Working Group QUALITY LEADERSHIP FORUM CONTRACT QUALITY CLAUSES WORKING GROUP Ken Crane MSFC September 24, 2002.
Chapter 5 Expenditure Cycle Applications. Expenditure Documents i.Purchase Requisitions ii.Purchase Orders iii.Receiving Report iv.Voucher Systems v.Invoice.
First Article Inspection
Chapter 16 Using Math in Sales 1 Marketing Essentials Chapter 16 Using Math in Sales Section 16.3 Purchase Orders and Invoices.
Applied Materials Confidential Authorized Labels for Information: Applied Materials Confidential. Applied Materials Confidential Restricted/Modifier Applied.
PRODUCTION PROCESS SchedulingInventory Incoming QC BinningPre-assemblyCalibration Final Assembly Final QA Packaging & Shipping.
©2011 AAI Corporation Overview of AAI Supplier First Article Inspection (FAI) expectations See your Supplier Quality Engineer with questions.
06/27/100 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 Philippe Removille SNECMA Moteurs 5.
1 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 AS9102, EN 9102, SJAC 9102 Dick Pocock VP, Quality.
NASA Quality Leadership Forum: Supply Chain Management Case Study Ken Ortiz/Alphaport, Inc. net-inspect ™
06/27/100 Internationally Harmonized Aerospace Standards for First Article Inspection AS9102, EN 9102, SJAC 9102 Chetan Date, Ph.D., P.E. Director of Design.
Supplier Quality Improvement
Suppliers without a Contract Purchase Order for Services.
19-Feb-16 “"Dana Confidential Information - Those having access to this work may not copy it, use it or disclose the information contained within this.
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Buy A&M Requisitions Training TARLETON STATE UNIVERSITY.
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – CowesDate:13/5/16.
NGES Supplier Instructions for the Electronic Request for Quotation (eRFQ) **New Special Charge Capability Added to Adobe Form- Effective 10/10/16** Revision.
Production Part Approval Process
Av-Tech Industries- Quality, Service and Precision Kitting
DSQR Training Reliance System
Quality, ROTI, Processes Presented by: Mr. Dan Hohman
Pre-Conference Training Demonstrations TaiRox Productivity Tools
First Article Inspection Reports (FAIRs) Instructions for Suppliers
SQA01 Supplier Guidance Material: Certificate of Conformance Requirements GKN Aerospace Services – Cowes Date: 13/5/16.
SYSPRO Business Model Flows
Administration of a FIDIC Contract - Project Control
Leveraging Features and Functionality in PeopleSoft 9
Module 3 – Create a Non-Catalog Requisition
IPOM and E-Booking.
Buy A&M Requisitions Training Version 14 Upgrade
PO INVOICE ENTRY Creating a PO Invoice Let’s Get Started
First Article Inspection
Welcome to the Cox Machine VIP Portal! cmivendorportal.com
DSQR Training Control Plans
Texas Instruments Supplier Portal- Web Invoice Overview
OSD Verification of Certification
Quality Management Systems – Requirements
Designers’ Manual Overview and Chapter Contents
First Article Inspection (Per AS9102)
Suppliers without a Contract
Awarded Vendors Bid No MS Packaged Ice Delivery Service Contract Term ends 5/2/2023 (6 years) Board Approved PA# Vendor Vendor# Vendor Contact .
Internet Commerce Cisco Systems
CDRL E003 CFAT REPORT TEMPLATE
First Article Inspection Reports (FAIRs) Instructions for Suppliers
Supplier Performance Development Process
General Services Department
SQA01 Guidance Material: FAI Review
SQA01 Supplier Guidance Material: Permission to Ship Forms
First Article Inspection
Production Part Approval Process
AS 9100 Awareness Training.
Guide for successful completion of First Article Inspection Reports
Guide for successful completion of First Article Inspection Reports
Supplier Performance Development Process
SUPPLIER ELECTRONIC PCR TRAINING
First Article Inspection (Per AS9102)
Procedure PP, Project Plan Configuration
NGES Supplier Instructions for the Electronic Request for Quotation (eRFQ) **New Special Charge Capability Added to Adobe Form- Effective 10/10/16** Revision.
Partner Portal Training document
Presentation transcript:

KAMAN AEROSPACE GROUP L. Chodasiewicz - Supplier Quality Assurance

KAMAN AEROSPACE GROUP For more than 50 years, Kaman Aerostructures has provided total Aerostructures solutions, from composite and metallic detail parts to fully integrated assemblies for government, military and aerospace customers. 11/29/2018

Purchasing Documentation KAS Purchase Order Supplement # listed above P.O. Number Kaman assigned supplier code and name Billing & Shipping Addresses Kaman Purchasing Contact information Item Number Part Number, Quantity, Price, Shipping Date Vendor Instruction (VI) by revision found near end of Item Number Description 6. Project Number 11/29/2018

Purchasing Documentation 1 2 3 5 4 5a 6 5b 1 EXAMPLE ONLY 11/29/2018

Product Configuration / Process Control Vendor Instruction (VI) Issued for each part number & controlled by revision General contents Materials Configuration data of drawing/ EPATS revision 3DMBD Model Base Definition revision level Special Process Requirements Process certification requirements Utilize qualified approved process suppliers Special Instructions: To be performed per B/P requirements To be altered or omitted AS9102 first article inspection requirements Final part certification requirements Source inspection requirements 11/29/2018

Controlled Processes & Customer Approved Process Suppliers Suppliers are Responsible for Sub-tier Supplier Control Review Vendor Instruction (VI) for process certification requirements Verify current approval status from the appropriate customer approved list / supplier portals Bell Helicopter Boeing Programs Kaman Aerospace Northrop Grumman Sikorsky Helicopter Using customer approved sources does not relieve supplier for sub-tier’s performance 11/29/2018

Kaman Source Inspection Source Inspection is imposed by Vendor Instruction Supplier to request Kaman Source Inspection: When supplier inspection is complete Prepare Source Inspection Request Form (QF4.1.412) E-mail to kas-supplier.support.svs@kaman.com Response is e-mailed advising the date source is scheduled Kaman Source Inspector will require: Quality Point of Contact Safe and well lighted area to perform inspection Material ready to be inspected Calibrated gages / inspection measuring tools Complete document package: PO, VI, B/P, certs, etc. 11/29/2018

AS9102 First Article Inspection Report (FAIR) FAIR is imposed by Vendor Instruction (VI) Supplier’s FAIR to comply with SQRM-KAS 1.0 Section 18.2 AS9102 document format (electronic format preferred) QIP 6.8 Pre-Production Process Approval is required Bubble drawings are required with FAIR package Black or Blue ink is required for manual entries Unique FAIR requirements are listed on Vendor Instruction (VI) Complete document package required: PO, VI, B/P, certs, etc. 11/29/2018

Certification (C of C) Requirements Identified in Vendor Instruction (VI) Requires Part Name, P/N, P/L, VI, Doc Revisions Purchase Order and Supplement Material Certifications & Samples Internal Processing Certifications Special Processes Approvals & Certifications FAI, Inspection, & Test Reports Serialization (as required) Caution!!! Errors on C of C will effect your quality rating 11/29/2018

Source Inspection Request Form (QF4.1.412) 11/29/2018

Vendor Request for Variation (VRV) J198 Submitted for defects found by supplier Data is included in Supplier Quality Rating MRB Dispositions must be from Kaman SUPPLIERS HAVE NO MRB AUTHORITY 11/29/2018

Vendor Request for Variation (VRV) J198 11/29/2018

Where to get more information? Contact Your Kaman Buyer for: Required Customer Specifications, Drawings… Vendor Instruction (VI) Documents Purchase Order Issues Submittal of VRV (MRB) documents Shipping / delivery information When In Doubt Contact Your Buyer… 11/29/2018