Mark Petree: Current Projects

Slides:



Advertisements
Similar presentations
Overview of SMTF RF Systems Brian Chase. Overview Scope of RF Systems RF & LLRF Collaboration LLRF Specifications for SMTF Progress So Far Status of progress.
Advertisements

XTCAV X-Band Transverse Deflecting Cavity Project Overview Patrick Krejcik Yuantao Ding, Joe Frisch.
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
C and S band BPM system update A. Aryshev, S. T. Boogert, S. Molloy, C. Swinson 5/25/20151ATF2 Software meeting.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Phase Difference = Phase Difference = 0.05.
Bob Lill Undulator Cavity BPM System April 16, 2007 Undulator Cavity BPM Status.
Patrick Krejcik LCLS November 11-12, 2008 SLAC National Accelerator Laboratory 1 Post-commissioning Controls Enhancements.
LHC Crab Cavities - Phase 1 - Schedule 2008 Mini Workshop - reminder Activities & Planning Planning Remarks 1 LHC-CC09, 3rd Crab Cavity Workshop - Session.
Direct Waveguide Couplers for the LHC Crab Cavity G. Burt Lancaster University (but its really Bob Rimmer’s idea) (and Brian Rusnak suggested it independently.
Linac 4 LL RF Hardware Architecture and Design Status
1 Timing and RF Distribution NLC -> ILC Josef Frisch.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
Longitudinal transfer function a.k.a. (M 55 ) measurements at the JLab FEL Pavel Evtushenko, JLab  Jlab IR/UV upgrade longitudinal phase space evolution.
X-Band RF Structure and Beam Dynamics Workshop, December 2008 CERN experience with 12 GHz high power waveguide components Igor Syratchev (CERN)
Project Status Update Mark Petree LCLS Self Seeding Status: Management put it on hold. – Preliminary conceptual design completed – Interference.
1 BROOKHAVEN SCIENCE ASSOCIATES Storage Ring Commissioning Samuel Krinsky-Accelerator Physics Group Leader NSLS-II ASAC Meeting October 14-15, 2010.
Eric Prebys Accelerator Physics Center Program Director, LARP December 7, 2009.
3.9 GHz Cryomodule Shipment to DESY E.Harms on behalf of the Third Harmonic Effort Team (AD & TD, with help from PPD, FESS, BS)
LARP-CM10, BNL Feb., 2008 J. Byrd, Lawrence Berkeley National Laboratory LHC Crab Cavities: Proposed LBNL Contributions John Byrd.
Stanford Linear Accelerator Center Ron Chestnut EPICS Collaboration Mtg May 21-23, SLAC EPICS Projects Yesteryear, Today, and Tomorrow.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
Krzysztof Czuba1 REFERENCE FREQUENCY DISTRIBUTION SYSTEM FOR THE TESLA TECHNOLOGY BASED PROJECTS Krzysztof Czuba Matthias Felber.
Ron Akre, Dayle Kotturi Lehman October 24-26, 2006 Linac.
M. FILIPPOVA CERN CLIC BE-RF RF DEVELOPMENT MEETING ON Inventory of RF components.
Dmitry Gudkov BE/RF CLIC Module Working Group Test Module Type 1 (LAB). Design and integration. 3D model Ref: ST
Stefan Wilke, DESY MHF-e 1 12th ESLS RF Meeting 1 st October, 2008 at DIAMOND Overview and Status of Assembling and Commissioning the RF-System at PETRA.
The categories for ILC budget planning are: R&D – work done in laboratories to develop and verify subsystem components. This supports the cost reduction.
Digital RF control at LBNL Gang Huang on behalf of the LBNL LLRF team LLRF2015.
LIU-SPS Beam Dynamics WG E. Shaposhnikova LIU-SPS coordination meeting
ILC R&D Activities at KEK Superconducting Linac Development Beam-handling Technology Development.
Extraction/Separator Setup Michael Spata Operations Stay Treat July 16, 2015.
RF Systems and Controls for the LERF CM Tests
CC LLRF SM18 test plan and BA6 infrastructure
PS status 10 August – 17 August 2017
ATF/TTF Instrumentation Nov. 27, 2006 Last report: Oct. 2
ILC Phase Reference Distribution R&D
FPC Coupler RF Dipole Kick
LLRF Controls Outline Requirements External Interfaces Schedule Design
Strategy for long-term support of the TTC system
INEL 6069 Klystron A power amplifier tube used to amplify weak microwave energy (provided by a radio- frequency exciter) to a high power level for a radar.
LLRF and Beam-based Longitudinal Feedback Readiness
CF Organization & Schedule
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
Low Level RF Status Outline LLRF controls system overview
LLRF Control System Outline Scope Requirements Design Considerations
LTU/Undulator Installation Status
FPGA Based Trigger System for the Klystron Department
Andrei Seryi Materials for discussion TILC-08
Low Level RF Status Outline LLRF controls system overview
Status of TTF HOM Project Aug 9, 2005
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Design Outline Scope Requirements Options considered
EPICS at SLAC EPICS/SLC Controls Co-existence LCLS Injector Support
Accelerator Physics Particle Acceleration
Electron Beam Systems Wrap-up
Undulator Cavity BPM System Status
LCLS Injector Configuration
LTU/Undulator Installation Status
Control System Overview Hamid Shoaee LCLS Control System Manager
Linac Coherent Light Source (LCLS) Low Level RF Status
Low Level RF Status Outline Overview showing hardware instances
LCLS e- Beams System Overview
Undulator Alternatives
Breakout Session SC3 – Undulator
Measurement Readings on Lab Instruments
Injector/Linac RF Status
Fig. 2 Optomechanical scheme to measure photon angular momentum and optical torque in a waveguide. Optomechanical scheme to measure photon angular momentum.
Presentation transcript:

Mark Petree: Current Projects Phase Cavity Timing System Beam Arrival Time Down Converter and Upgrade Timing Phase Shift Chassis System Integration in UND Hall

Phase Cavities in Undulator Hall

Down Converters, Phase Shifter and LBL Chassis

VME Crate, IOC, Phase Shifter and LBL Chassis

Mark Petree: Current Projects Coaxial Stabilization System and Upgrade Transmit and Receive Chassis Two Designs: Circulator and RF Coupler based Designs for LCLS and LHC

Coaxial Stabilization Receiver Chassis

Coaxial Stabilization Transmitter Chassis

B685 Lab Management and Organization Lab space available for APE members Large inventory of instrumentation and parts George Burgueno available for assistance

B685 Lab Workbenches

B685 Lab Rackspace

B685 Lab Rackspace

Project Coordination and Management Available for management of member projects and coordination of SLAC shops and groups