Mark Petree: Current Projects Phase Cavity Timing System Beam Arrival Time Down Converter and Upgrade Timing Phase Shift Chassis System Integration in UND Hall
Phase Cavities in Undulator Hall
Down Converters, Phase Shifter and LBL Chassis
VME Crate, IOC, Phase Shifter and LBL Chassis
Mark Petree: Current Projects Coaxial Stabilization System and Upgrade Transmit and Receive Chassis Two Designs: Circulator and RF Coupler based Designs for LCLS and LHC
Coaxial Stabilization Receiver Chassis
Coaxial Stabilization Transmitter Chassis
B685 Lab Management and Organization Lab space available for APE members Large inventory of instrumentation and parts George Burgueno available for assistance
B685 Lab Workbenches
B685 Lab Rackspace
B685 Lab Rackspace
Project Coordination and Management Available for management of member projects and coordination of SLAC shops and groups