Logic of Network Diagramming

Slides:



Advertisements
Similar presentations
Critical Path Analysis. Why Is CPA Important? CPA is arguably the piece of maths used most often, outside of basic arithmetic. Important not only in commerce.
Advertisements

WBS: Lowest level OBS: Lowest level
464 Lecture 09 CPM Revision. Scheduling Techniques r The scheduling techniques are î To plan, schedule, budget and control the many activities associated.
Richard Fisher 1 The University of Texas at Dallas Project Management BA 4320 Richard Fisher The University of Texas at Dallas.
Precedence Diagram Technique Precedence Networks Critical Path Analysis.
Planning PERT - Project Evaluation and Review Technique) and CPM - Critical Path Method are network analysis techniques that are commonly used in project.
1 Lecture by Junaid Arshad Department of Engineering Management Abridged and adapted by A. M. Al-Araki, sept WBS: Lowest level OBS: Lowest level.
Chapter 10: Project Schedule Planning
Eleanor Roosevelt High School
Management & Development of Complex Projects Course Code - 706
Chapters 8, 9, and 10 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out.
Project Management. What is a Project? One Time Effort Identifiable Start/End Points Specific Objectives Multiple Tasks Resources from Across the Organization.
Using MS Project To draw a Network diagram. Add tasks Add the 8 tasks listed for making a cup of tea. Add the duration of each –Note: MS Project doesn’t.
Activity on Arrow (AoA) Network Diagrams
Scheduling CTC-415. Activity Network Development Network Models Activity on Node Precedence Diagram Method Activity on Arrow Network Characteristics Discrete.
Chapter 5 Planning. 222 Learning Objectives  Clearly define the project objective  Develop a work breakdown structure  Develop a network diagram 
This work is licensed under a Creative Commons Attribution 3.0 Unported LicenseCreative Commons Attribution 3.0 Unported License (CC-BY). Project Management.
Workshop-3 Gantt and Pert Chart.
Network Scheduling : Precedence Diagram Method
Project Management An overview. What is a Project A temporary job to accomplish a specific task A temporary job to accomplish a specific task Attributes.
PROJECT MANAGEMENT Outline What is project mean? Examples of projects… Project Planning and Control Project Life Cycle Gantt Chart PERT/CPM.
CSCI411 March 11, 2015 Project Scheduling - time Copyright © 2010 by the McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin.
PROJECT MANAGEMENT Syllabus Outcomes : Construct and interpret a network, identify the critical path, and calculate the free and total float. Evaluate.
1 DELIVERABLES OF DESIGN REVIEW 1 Statement of problem/need Customer needs Product Design Specifications (PDS) Design targets Project plan TOOLS USED TO.
Network Analysis Terminology
Objectives 4 Understand the basic concepts of project planning and control 4 Explain PERT and Timeline (Gantt) charts.
Topic 5.8 ( only HL ) IB Business & Management Project Management Mr L Greenbank 1.
Create a Work Breakdown Structure (WBS) n Develop the project goal yourself n Take a cursory pass at defining the objectives –the preliminary plan n Have.
T.L. Martin & Associates Copyright © 2008 Chapter 1 Fundamentals of Scheduling T.L. Martin & Associates, Inc Office Park Drive Gaithersburg, Maryland.
Project Management Part 5 Project Scheduling. Topic Outline: Project Scheduling Identifying relationships among activities Project network diagrams Identifying.
Developing a Project Plan
Dr. Hany Abd Elshakour 2/18/ :27 PM 1. Dr. Hany Abd Elshakour 2/18/ :27 PM 2 Time Planning and Control Activity on Arrow (Arrow Diagramming.
Reference: Figure 6.2. PMBOK® Guide, 5 h Ed Reference: Figure 6.2. PMBOK® Guide, 5 h Ed.
Microsoft Project – Tutorial 3 Creating a Report open LAN-3 from the tutorials folder save the file as LAN-3-your initials click Reports > Reports double-click.
PROJECT MANAGEMENT ENCE-7323 TO 763-N CLASS 3 September 17, 2001 Carl E. Edlund
Project Planning 1. Statement of work: written description of what is to be done 2. All activities are identified. Activity = job that requires labor,
Network planning models These project scheduling techniques model the project's activities and their relationships as a network. In the network, time flows.
Chapter 9 Planning. 222 Learning Objectives  clearly defining the project objective  developing a work breakdown structure  developing a network diagram.
The Network Diagram. When to Do What?  Carrying out one activity after the other may result in project completion, but it will take the longest possible.
Time Planning and Control Time-Scaled Network
Critical Path Method(CPM)
Overview Definition of an Activity Network Diagram History Basic Terms
UNIT II Scheduling Procedures & Techniques FLOAT
Project Management: PERT/CPM
Project Scheduling KULIAH 10 Magister Sistem Informasi
Chapter 5 Planning
Chapter 5: Project Time Management Doddy Prayogo, Ph.D.
P.I.I.M.T American University of Leadership
The Project Schedule and Budget
& Urban Planning Civil Engineering Department
Project Scheduling KULIAH 10 Magister Manajemen
Project Scheduling Lecture # 1.
Eleanor Roosevelt High School
2nd Task of Your Project „All you have to decide, is what to do with the time that is given to you.“ J.R.R. Tollkin Prof. Dr. Christian Bleis 1 Interaktionskompetenz.
Project scheduling Chapter 10 Copyright ©2016 Pearson Education, Inc.
Developing a Project Plan
Chapter 5 Planning
Project Scheduling: networks, duration estimation, and critical path
PLANNING ENGINEERING AND PROJECT MANAGEMENT
CHAPTER 8: SCHEDULING (PENJADUALAN)
Time Planning and Control Time-Scaled Network
PERT - The Program Evaluation and Review Technique
THE HIERARCHY OF SCHEDULES
PROJECT MANAGEMENT (BSBI 622)
Project Management (lecture)
Project Planning By Phaik San Liew.
Planning and Scheduling
Project Management (lecture)
Importance of Project Schedules
Presentation transcript:

Logic of Network Diagramming The critical path method of project scheduling must adhere strictly to this format in order to be meaningful and effective. In order to draft this and read an arrow diagram in the light of the three fundamentals, certain ground rules have been developed; for example:

Examples Activity B cannot start until activity A is completed. B A

Activity B is immediately followed by activities C and D, which may be performed concurrently.

Activity G cannot start until both activities E and F have been completed.

Both activities H and I must be completed before activity J or K can start.

Both activities L and M must be completed before activity N can start; however, the start of activity O depends upon the completion of activity M alone. The dash-line arrow is considered a dummy activity, having no duration and used to show the restriction. L M N O

Precedence Relationships 2 6 3 5 4 Fab Frame Fab Springs Assemble Frame Fab Cushion Cut & Sew Fabric Install Cushion Install Cover 1

Critical Path 2 6 3 5 4 Fab Frame Fab Springs Assemble Frame 12 14 15 2 6 3 5 4 Fab Frame Fab Springs Assemble Frame Fab Cushion Cut & Sew Fabric Install Cushion Install Cover 4 6 2 1 3 3 1 12 10

Relationships The type of dependency between two tasks, visually indicated by a link line. Types of relationships include: Finish-to -Start Start-to-Start Finish-to-Finish Start-to-Finish These are also known as a link, a logical relationship, a task dependency, or a precedence relationship,

Relationships 2 6 3 5 4 1 Finish Start