[VHT SG Approach Proposal]

Slides:



Advertisements
Similar presentations
[ Interim Meetings 2006] Date: Authors: July 2005
Advertisements

Motions Date: Authors: January 2006
London TGu Motions Authors: January 2007 Date: Month Year
LB73 Noise and Location Categories
LB73 Noise and Location Categories
SG CUB Tentative Timeline
Waveform Generator Source Code
March 2014 Election Results
TGp Closing Report Date: Authors: July 2005 Month Year
TGp Closing Report Date: Authors: July 2007 Month Year
Attendance and Documentation for the March 2007 Plenary
Attendance and Documentation for the March 2007 Plenary
[ Policies and Procedure Summary]
[ Policies and Procedure Summary]
November Opening Report
Motion to accept Draft p 2.0
3GPP liaison report July 2006
[place presentation subject title text here]
Descriptive Language Usage in TGv
TGp Motions Date: Authors: November 2005 Month Year
March Opening Report Date: Authors: March 2010
TGp Closing Report Date: Authors: March 2006 Month Year
TGu-changes-from-d0-02-to-d0-03
TGp Closing Report Date: Authors: May 2007 Month Year
November Opening Report
TGp Closing Report Date: Authors: March 2006 Month Year
Reflector Tutorial Date: Authors: July 2006 Month Year
TGv Redline D0.07 Insert and Deletion
TGu Timeline Date: Authors: January 2005 January 2005
TGv Redline D0.06 Insert and Deletion
ADS Study Group Mid-week Report
TGu Timeline Date: Authors: July 2005 July 2005
IEEE P Wireless RANs Date:
Spectrum Sensing Tiger Team
TGu-changes-from-d0-01-to-d0-02
September Opening Report
LB73 Noise and Location Categories
EC Summary of PAR Development
March 2012 Opening Report Date: Authors: March 2012
TGy draft 2.0 with changebars from draft 1.0
TGv Redline D0.10 Insert and Deletion
IEEE WG Opening Report – July 2007
WNG Closing Report Date: Authors: January 2007 January 2007
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
Redline of draft P802.11w D2.2 Date: Authors:
TGp Closing Report Date: Authors: March 2007 Month Year
November Opening Report
TGr Proposed Draft Revision Notice
TGu-changes-from-d0-02-to-d0-03
[ Policies and Procedure Summary]
March Opening Report Date: Authors: March 2011
EC Motions – November 2005 Plenary
Beamforming and Link Adaptation Motions
[ Policies and Procedure Summary]
Draft P802.11s D1.03 WordConversion
Questions to the Contention-based Protocol (CBP) Study Group
January Opening Report
Motion to go to Letter Ballot
EC Motions – July 2005 Plenary
TGu-changes-from-d0-04-to-d0-05
TGu-changes-from-d0-03-to-d0-04
TGu Timeline Date: Authors: January 2005 January 2005
11k Public Awareness Program
TGu Timeline Date: Authors: May 2005 May 2005
TGu Timeline Date: Authors: July 2005 July 2005
WAPI Position Paper Sept 2005 Sept 2005 IEEE WG
TGu Timeline Date: Authors: July 2005 July 2005
TGr Proposed Draft Revision Notice
TGs March Mid-Week Report
TGp Motions Date: Authors: January 2006 Month Year
Presentation transcript:

[VHT SG Approach Proposal] May 2007 doc.: IEEE 802.11-07/0649r0 May 2007 [VHT SG Approach Proposal] Date: 2007-05-14 Authors: Notice: This document has been prepared to assist IEEE 802.11. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.11. Patent Policy and Procedures: The contributor is familiar with the IEEE 802 Patent Policy and Procedures <http:// ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair stuart@ok-brit.com as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE 802.11 Working Group. If you have questions, contact the IEEE Patent Committee Administrator at <patcom@ieee.org>. John R. Barr, Motorola John R. Barr, Motorola

May 2007 doc.: IEEE 802.11-07/0649r0 May 2007 Abstract An approach for the Very High Throughput Study Group is proposed to ensure that current IEEE 802.11n efforts are not compromised while early work required to establish requirements and market demand for WLAN solutions 3-4 years in the future can be done to determine the scope of one or more PARs that would satisfy market requirements for future WLAN solutions. John R. Barr, Motorola John R. Barr, Motorola

May 2007 VHT SG Objectives Create PAR and 5C necessary to establish new IEEE 802 effort: 11-07-0574-00-0000-draft-par-and-5criteria-gigabit-tg.doc Submitted by Darwin Engwer as an example of what is needed. Revise to reflect consensus of study group once use cases, technology, spectrum, and other market requirements have been established. Analyze use cases, technology trends, spectrum landscape, and market requirements necessary to define PAR and 5C content Schedule effort around completion of IEEE 802.11n effort to prevent erosion of 802.11n resources. John R. Barr, Motorola

Proposed (optimistic) Schedule May 2007 Proposed (optimistic) Schedule May 2007: Outline of basic goals and issues that will need to be addressed by contributions in July/September, Set schedule for a few conference calls to set agenda for July meeting. July 2007: Contributions on use cases, technology trends, spectrum landscape, regulatory options, market drivers, etc. Identify additional contributions required to establish basis for PAR & 5C. September 2007: Additional contributions Analysis of contributions and drafting of supporting documents November 2007: Finalize PAR & 5C and supporting documents required to gain approval of PAR & 5C by 802.11 WG, 802 EC, and NesCom. January 2008: Prepare for start of task group in March 2008 March 2008: Task Group established for VHT PAR John R. Barr, Motorola

May 2007 Items to be Addressed Schedule for establishment and completion of VHT TG Best time to start Projection of when completion required to meet market window Existing performance of 802.11n Use cases/scenarios that may not be satisfied by 802.11n New use cases not previously considered Technology trends leading to enhanced WLAN performance International spectrum allocation and usage rules that may affect viability of WLAN deployment outside of 2.4 and 5 GHz bands. Other? John R. Barr, Motorola

May 2007 References 11-07-0574-00-0000-draft-par-and-5criteria-gigabit-tg.doc John R. Barr, Motorola