Lecture 7 Excavators TSP-308 MPK Ferdinand Fassa.

Slides:



Advertisements
Similar presentations
Excavators Cranes(will discuss another section)
Advertisements

Excavating and Lifting Part 1
Using Large Landscape Maintenance Equipment. Next Generation Science/Common Core Standards Addressed! CCSS.ELA Literacy.RST.9‐10.1 Cite specific textual.
Loading and Hauling.
CTC-275 Construction Methods
Excavating and Lifting Part 2
Loading and Hauling Part 2
Horticulture CD Unit C 6-3: Nursery, Landscaping, and Gardening.
3-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped bucket capacity is 2.10 CY (1.6 CM). The machine.
Lecture 4 Excavating and Lifting
Types of Loaders ©Dr. B. C. Paul 2000 Modified 2009 Note – These slides contain drawings copied from the book Surface Mining Equipment.
Draglines and Clamshells
Lecture 7 Loading and Hauling
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 10 Trucks and Hauling Equipment.
Mobile Equipment Hazards
Front shovel, back hoe and loader. Group member: Lam Wai Kei Hui Tan La
Excavating and Lifting Hmwk Ch 2 # 1,2,5,8 Ch 3 #2,4,6,10.
TRUCKS THE MOST COMMON HAULING EQUIPMENT USED FOR MILITARY CONSTRUCTION SITE ARE 2 1/2, 5, AND 20 TON DUMP TRUCKS. THE HAUL CAPACITY CAN BE EXPRESSED.
Ground-Based Primary Transport TOPICS: Conventional ground skidding equipment Mechanical felling, tree processing & forwarding equipment & systems Management.
Matching An Excavator to Our Trucks ©2009 Dr. B. C. Paul Note – These Slides contain tables and information found in the Caterpillar Performance Handbook.
Pricing Excavation and Backfill
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Excavating and Lifting Part 2
Eng. Malek Abuwarda Lecture 5 P1P1 Construction Methods Lecture 5 Excavating and Lifting.
CTC-375 Construction Methods
CEE 404 Winter Productivity Refresher. CEE 404 Winter Excavator Cycle Time.
COURSE INTRODUCTION CEM 530 CONSTRUCTION EQUIPMENT AND METHODS BY
Estimating Ahmed Elyamany, PhD, AVS. EARTHWORK AND EXCAVATION bank  Earth that is to be excavated is called bank measure. loose  Earth that is to be.
Excavating and Lifting Part 1
Loading Considerations © 2000 Dr. B. C. Paul revisions 2009 Note These slides include screen shots from the Caterpillar Performance Manual Edition 29.
Lecture 6 Loading and Hauling
CONSTRUCTION TECHNOLOGY & maintenance
TYPES OF CONSTRUCTION MACHINERY. FOLLOWING ARE THE MAJOR TYPES OF EQUIPMENTS THAT IS BEING USED IN THE CONSTRUCTION INDUSTRY.
Estimation 1 Lesson 4 - Excavation.
Lecture 2 Introduction to Earthmoving
SHOVELS.
Horticulture CD Unit C 6-3: Nursery, Landscaping, and Gardening.
Powerhouse Prodigy Compact Utility Loader
Matching Shovels ©Dr. B. C. Paul 2000 revised 2008 Note – Matching procedures depicted in these slides are widely understood among those schooled in the.
THE HANDICAP RESULTING FROM NOISE-INDUCED HEARING LOSS Communication Self-Esteem Interaction with Environment Intimate Relationships.
Step #1 Matching ©Dr. B. C. Paul 2000 revised 2008 Note many of the ideas expressed in these slides can be found in Surface Mining Manuals, the Book Surface.
Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display. Chapter 7 Dozers.
ESTIMATING EARTHWORK DR. Nabil Dmaidi.
*You will be able to find the lengths of sides of special right triangles And
نظام المحاضرات الالكترونينظام المحاضرات الالكتروني Construction Methods By Ruqaya ALZubaidi.
FPC Assignment 1. Go to Your Project and Fire-Up MSOPIT.
Soil And Rock General Soil Characteristics Trafficability – ability of soil to support weight of vehicles under repeated traffic –Controls traffic on unimproved.
Construction Schedule for Baseline and Hybrid A’ Configuration 1 5 th September, 2014 J-POWER MDI-CFS Meeting - Ichinoseki City, JAPAN.
Types of Loaders ©Dr. B. C. Paul 2000 Loading Equipment l Four Basic Types of Loaders Cable Shovel Hydraulic Front Shovel (also called hydraulic excavator)
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 5 ESTIMATING EARTHWORK.
Obtaining Moving Cycle Times ©Dr. B. C. Paul 2000 revised 2008 Note – The methods shown in these slides are adapted to use FPC, a program produced by.
Excavation and lifting Excavator: Power driven digging machine Types 1. Hydraulic excavator 2. Cable operated excavator 3. Shovel 4. Draglines 5. Hoes.
Earth Moving Equipment Companies in Sharjah
CLASSIFICATION OF MINING EQUIPMENT
In the Name of Allah The Most Beneficent & Merciful
Powerhouse Prodigy Compact Utility Loader
SERVICES, LLC 1 1.
Contractor Safety Forum Submission January 16, 2018
Lakshitha Senarathne BSc (Hons), AMIE(SL). Earthworks are engineering works created through the processing of parts of the earth's surface involving.
CONSTRUCTION METHODS & TECHNOLOGY
TRUCKS & HAULING EQUIPMENT
Drag system in Dragline and Backhoe
Lecture 6 scrapers TSP-308 MPK Ferdinand Fassa.
CONSTRUCTION EQUIPMENT MANAGEMENT
MULTIDISCIPLINARY ENGINEERING
Lecture 5 Dozer TSP-308 MPK Ferdinand Fassa.
MUHAMMAD WAJAHAT AMIN (INTERNEE, MINE PLANNING) OPEN PIT MINING TOPICS.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Backhoe.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Presentation transcript:

Lecture 7 Excavators TSP-308 MPK Ferdinand Fassa

OUTLINE Introduction Type of Excavator

INTRODUCTION Hydraulic front shovel are used for hard digging above track level and for loading haul units Hydraulic hoe excavator are used to excavated below natural surface of the ground on

Type of Excavators Backhoes Front Shovels (Power Shovels) Draglines Clamshells Trenchers

Excavators excavate and load dirt (soil/aggregate) to haulers

Anatomy of Excavator

Draglines

Under Carriage Wheel-Mounted Crawler-Mounted Truck-Mounted

Factors Affecting Excavators’ Productivity Types and characteristics of soils Depth of Cut Angle of Swing Types and sizes of buckets Length of boom Efficiency and condition of equipment Efficiency and condition of work

Loading Mechanism

Excavator Productivity Bucket Capacity (manufacture listed specs) volume (heaped / struck) weight (static tipping load, front or side, outriggers) Bucket Fill Factors (type of material) Cycle Time Load-raise, swing, dump, swing back, lower, Correction Factors Bucket Fill factor % Optimum Depth of Cut – Angle of Swing working and management conditions P = corrected bucket capacity / cycle time

Buckets

Tables for Backhoe

Correction factor for Opt. Depth of Cut – Angle of Swing

exercise bucket load = 95% * 3 cy = 2.85 Lcy Determine actual productivity of a backhoe loader having optimum dept of cut of 2.2 m and working to excavate sand at depth of 2.5 m and angle of swing 150o. Bucket size is 3 cy. Percent swell 26% Working in 40 min-hour. Total cycle time = 20 sec bucket fill factor 95% bucket load = 95% * 3 cy = 2.85 Lcy % opt. depth of cut = dept of excavation/ max dept = 2.5 m/2.2 m =114% Correction factor: = 1/(1+ swell factor) = 1/(1+0.26)  0.79 Estimated productivity: = (bucket size x fill factor x working efficiency) cycle time (2.85 Lcy x 0.79 x 40/60) / 20 = 0.075 lcy/s x 3600 s = 270 Lcy/hr

CONSTRUCTION EQUIPMENT AND METHODS Next Lecture 8 CONSTRUCTION EQUIPMENT AND METHODS