ME 495 EV: Electric Pontiac Fiero Project

Slides:



Advertisements
Similar presentations
Used to Procure Goods & Supplies. Office supplies Operating supplies Computer hardware and software (non- capitalized
Advertisements

Electric Transmission Field Operations Human Performance and Work Practices Electronic Pre-Job Briefing Form Performance Awareness Library (PAL) Don’t.
1 Connecticut Corsair Senior Design School of Engineering From one dream flies another... Connecticut Corsair Senior Capstone Design Project.
Basic Overview of Project Management and Life Cycle ACES Presentation T. Gregory Guzik January 21, 2003.
Justin Akerman (CE) Chris Hoerbelt (ME) Hersh Anand (EE) Anthony Poli (ME) Greg Mucks (ME) Jon Notaro (EE) Eric Tripp (EE) Customer: Stan Rickel.
ME 495 EV Team 3: Safety Systems Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project.
ME 495 EV Presented by team BJCANE: Brett Joseph, John Jolly, Colin Bates, Alex Fabbiano, Nick Smith and Eric Yost ME 495 EV: Electric Pontiac Fiero Project.
Integration and Test (I&T) …The forgotten subteam Kevin Killian, Coach Pascack  ONEERS, Team 1676
ME 495 EV Team 3: Safety Systems Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project.
Senior Design Team RMSC Robotics Display Mentor: Bill Scarbrough Team Leader: Amy Tatro (ME) Mary Beth Belczak (ME) Matt Boecke (EE) John Byrne (ME)
Baja Meeting 9/9/04 Top 10 in each event –Teamwork –Planning –Execution.
1 6/21/2015 Space Cowboys Team Project Final Report Mobility Subsystem Brett Padgett.
ME 495 EV Team 1: Alex and Eric ME 495 EV: Electric Pontiac Fiero Project.
University of Washington Presented by Eric Yost University of Washington Electric Pontiac Fiero Project.
ME 495 EV Presented by BJCANE ME 495 EV: Electric Pontiac Fiero Project.
ME 495 EV Team 3: Adapter Plate Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project.
Line Balancing. A Assemble Engine 120 B Assemble Transmission 80 C Test Drivetrain 30 D Sand Body 140 E Paint Body 20 F Inspect Paint 15 G Install Engine.
14 October 2004AME 470 – Team Unum PDR #10 – 11 November 2004 Subsystem Integration Tim Culbertson Team UNUM.
Team INASAD Members: Jose Medina Joseph Leone Andrew Merk Alex Sanders Michael Fox.
Design, Implementation and Maintenance

Continuing Embry- Riddle’s CubeSat Satellite Development Program Presented by Clayton G. Jacobs Embry-Riddle Aeronautical University, Prescott EagleSat.
Welcome Welcome Robot Rumble Robot Rumble Sponsors Sponsors Meeting Schedule Meeting Schedule Events Events Survey Survey Fall Project Fall Project Agenda.
BUILD WITH US. ™ 5S – The Foundation for Improvements Safety the “6 th ” S.
Golf Swing Robot EE 486 Project Presentation College of Engineering and Technology Presented by Nasser Almarri.
Module 7 Session 7.3 Visual 1 Module 7 Planning and Scheduling with the Critical Path Method Session 7.3 The computer and project management.
SDMAY11-01 Advisor: Dr. Ajjarapu Team Members: Luke Rupiper Shonda Butler Andrew Nigro Ryan Semler Chad Hand.
Functional Requirements Generate an AC current Supply an output of 500 to 1000 Watts Supply power to the Coover Hall grid Turn off in high wind speeds.
RoMow Progress Update #2. Team Members Nathan Terschak (EE), Dustin Brouwer (ME), Jordan Newhof (ME), Andy Frandsen (ME)
From Information to Intelligence … After some initial data collection and early discussions with industry, a basic career ladder for Industrial Maintenance.
Insurance Industry is information intensive 8,000 Companies 3 Million People Employed State Farm has over 5,000 IS employees.
TOF Project Construction Project Plan
Meet me at SHAREPOINT. Learning Today  Announcements  Libraries  Calendar  Discussion Board  Meeting Components  Series or Not?  Customizing 
Pedibus Team 22 Team Members: Kyle Anderson Stephen Avery Alejandro San Segundo Brett Willenbacher Team No.22 Slide 1 of 15 Alejandro San Segundo Midterm.
Pedibus Team 22 Team Members: Kyle Anderson Stephen Avery Alejandro San Segundo Brett Willenbacher Team No.22 Slide 1 of 15 Kyle Anderson Midterm I Sponsor:
Comment on the LHCb upgrade cooling plan Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
© Robert C. Hughes, MS 2005 Technology Applications in Human Resources Slide 1 HRMS/HCMS Implementation Robert C. Hughes, M.S. MGMT 364 Unit/Week 9 Golden.
ME 495 EV Team 3: Safety Systems Brett Joseph, John Jolly ME 495 EV: Electric Pontiac Fiero Project.
YUSEND Communication System Design Update ENG February 11, 2009.
Designing a Better Design Class Electric Vehicle Design at MIT.
Organisation structure of projects Project Management (lecture)
Layout Drawings Presentation ME 4182 Team: 5 Guys Engineering + 1 Nathan Bessette, Rahul Bhatia, Andrew Cass, Zeeshan Saiyed, Glen Stewart YJ Chok.
Analysis of a Nulling Yaw Probe ME 450: Computer Aided Engineering Analysis Instructor: Dr. Nema Group members: Billy Holland, Alan Koers, Allison Heying.
Positioning Sensor for Electric Motor Drive ENGR 498 Senior Design College of Optical Sciences Industrial Affiliates.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
Allen Luccitti (ME). Mission Statement Product Description ▫ Test stand consisting of a centrifugal pump, closed loop flow system with control through.
VISIONING. Action without vision is often wasted. Vision without action is just a dream. Luis Vicente Giay, RIP
CMGT 410 Week 2 Learning Team Project Charter Check this A+ tutorial guideline at 410-Week-2-Learning-Team-Project-Charter.
THE VALUE (SUPPLY) CHAIN STRETCHES FROM THE BEGINNING OF YOUR SUPPLIER’S SUPPLY CHAIN THROUGH ALL OF YOUR PROCESSES THAT CREATE VALUE FOR YOUR CUSTOMERS.
Central Colorado Advanced Manufacturing Hot Jobs thru 2024
Colorado Advanced Manufacturing Hot Jobs thru 2024
Turbomachinery Flow Visualization P08453
The Basics Chuck Oravec
Concept Level Project Plan P08008 – ArcWorks Process Improvement
Socrative Question #1 Which of the following would be the person most likely to be installing new network routers for a business or organization? Computer.
Cold Pressure Fusing II Team Fusion
Transforming Vehicle Development
Request for Proposal (RFP)
Presented by Team 2: Colin Bates, and Nick Smith
Cell Deployment Process
Buy all of your electricity and magnetism needs here!
ME 495 EV: Electric Pontiac Fiero Project
Click to start.
Presented by Team 2: Colin Bates, and Nick Smith
Mechanical Engineering & Technology (MET)
The Survival Plan.
ME321 - Kinematics and Dynamics of Machines Design Process Notes
ME 495 EV: Electric Pontiac Fiero Project
Formula Electric Vehicle
Administrative Assistant Call:
Presentation transcript:

ME 495 EV: Electric Pontiac Fiero Project Presented by team BJCANE: Brett Joseph, John Jolly, Colin Bates, Alex Fabbiano, Nick Smith and Eric Yost

Project Goals: Project Goals: Select and procure motor(s), transmission and clutch Fabricate mounting hardware and safety systems Assemble and install the electric drive train

Team Member Responsibilities: Brett Joseph…………….Project Manager John Jolly………………. Stress Analysis Specialist Colin Bates…………….. Computing Alex Fabbiano…………. Research Manager Nick Smith ………………Shop Specialist Eric Yost………………... Quality Control Supervisor

Problem Statement: Problem Statement: Design & integrate an electric drive train for an ’88 Pontiac Fiero that best meets the requirements of the customer

Project Requirements:

Next Week: Next Week: BJ CANE will select the motor using Dieter’s Design Process Dual 8” motors Single 9” motor Permanent Magnetic Motors

Next Week: Next Week: Order motor Define project subsystems Delegate subsystem tasks to two-man teams Generate formal project timeline and determine critical path