05/08/09.

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

West Coast Spectrometer Team Mark Wagner, Berkeley project manager, FPGA designer Terry Filiba, data transport: FPGA --> CPU --> GPU Suraj Gowda, boosting.
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review John Ford August 5, 2008 CICADA Project The NRAO is operated for the National Science Foundation.
Embedded DSP Spectrum Analyzer May 0104 April 25, 2001 Teradyne Corp Julie Dickerson Bill Black Prihamdhani AmranEE Ryan ButlerCprE Aaron DelaneyEE Nicky.
Enterprise Content Management Pre-Proposal Conference for RFP No. ISD2006ECM-SS December 6, 2006 California Administrative Office of the Courts Information.
NRAO Receivers Richard Prestage
Shilpa Bollineni, Glen Langston, John Ford, Randy McCullough and Paul Demorest DATA ACQUISITION ON THE 43M TELESCOPE.
Green Bank Project Management What, Why, How, When, Who Tuesday, 22nd July, 2003 John Ford and Richard Prestage.
Spring 07, Jan 16 ELEC 7770: Advanced VLSI Design (Agrawal) 1 ELEC 7770 Advanced VLSI Design Spring 2007 Introduction Vishwani D. Agrawal James J. Danaher.
NgVLA Correlator with 2015ish Technology Jack Hickish, Dan Werthimer, and CASPER Collaboration
November-2007Created By: Matt Heath MicroNet Digital Core Design ECE – 401 Senior Design Presentation.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Digital Signal Processing.
Project Management and Scheduling
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Spectrometer PDR John.
The R&M Task Group mandate is to: Develop specific recommendations on how social housing project reporting and monitoring could be improved and made more.
C. ChandlerEVLA Advisory Committee Meeting September 6-7, Scientific Commissioning Plan Claire Chandler.
 NSF Merit Review Criteria Intellectual Merit Broader Impacts  Additional Considerations Integration of Research & Education Integrating Diversity into.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array A New Multibeam Spectrometer.
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review Ron DuPlain, Scott Ransom, Paul Demorest, Patrick Brandt, John Ford, Amy Shelton CASPER information.
11 Workshop on Information Technology March Shanghaï CONFIDENTIAL Architectures & Digital IC design.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The VLBA Sensitivity.
Product Documentation Chapter 5. Required Medical Device Documentation  Business proposal  Product specification  Design specification  Software.
FOUR CHANNEL ULTRASONIC RECEIVER TEAM C BRIAN MARKUS (TEAM LEAD) DANNY VISELMAN CHEN JIA.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Meeting Summary Richard.
SOFIA Proposal Timeline Millimeter/THz Development at the NRAO CDL 1 18-Feb-2011: NRAO Science/Engineering Advisory Panels in place 25-Feb-2011: NRAO Science.
NRAO Users Committee Meeting May 20-21, National Radio Astronomy Observatory NRAO Users Committee Meeting – May 20-21, 2008 ALMA Operations Chris.
Hardware: Old, New, Future Hardware: Old, New, Future Dan Werthimer and Casper Collaborators.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
12/8/2009 Iowa State University EE491 - Senior Design I.
Request for Proposal (RFP)
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array FPGA Spectrometer.
GBT Focal Plane Array Development Program Steven White Program Manager.
An Integrated Program for GBT Focal Plane Array Development Steven White Based on discussions with: Rick Fisher, John Ford, Matt Morgan, Roger Norrod,
Jason Manley, Aaron Parsons, Don Backer, Henry Chen, Terry Filiba, David MacMahon, Peter McMahon, Arash Parsa, Andrew Siemion, Dan Werthimer, Mel Wright.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
Chapter Sixteen Managing Network Design and Implementation.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array Observing with NRAO.
December 3-4, 2003 Green Bank GBT PTCS In Progress Review EMS/LRF Update Richard Prestage.
Driver Attentiveness Detection System (DADS) P roject Plan Project Team Members  Matthew Parks – Project Leader  Steve Tegtmeyer  Chris Klutch  Justin.
Omnisys There are a few different activities at Omnisys that may be of your interests. –New correlation spectrometer IC’s. –New FFT spectrometers –Future.
Grant Proposal Writing
CASPER Open Source Hardware Current and Future ADC’s
April 8/9, 2003 Green Bank GBT PTCS Conceptual Design Review John Ford September 28, 2009 Casper Instrumentation at Green Bank The NRAO is operated for.
Collaboration for Astronomy Signal Processing and Electronics Research.
Exploring the Unknown with CASPER Instrumentation Andrew Siemion CASPER Workshop 2011.
K-Band Focal Plane Array Steven White Program Manager.
GBT Focal Plane Array K band 7 Pixel Steven White Program Manager.
LA SALLE CENTER FOR ENTREPRENEURSHIP BUS100 PRESENTATION: “BANK ON IT” FINANCING YOUR CONCEPT.
Request for Proposal (RFP) In response to the RFP – the first step is to prepare a proposal 1. Review Customer Requirements and come up with candidate.
USDA 2016 Financial Management Training Transforming Shared Services Change Management Presented by Ron Gros.
October 13, 2008 TPTF Nodal Status Report: Program Update Ron Hinsley.
SETI Spectrometer Development for ALFA
UK Financial Plan & Risks
Planning Phase: Project Control and Deliverables
What Reviewers look for NIH F30-33(FELLOWSHIP) GRANTS
WVU Center for Astrophysics and NRAO Green Bank
Comprehensive Design Review
Linguistic Analysis for Subject Identification
Request for Proposal (RFP)
EVLA Overall Software Design
John Ford2, Andrew Harris3, and Shuvra S. Bhattacharyya1
Jim Cordes Cornell University
NRAO-GB Support for VSOP-2
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
TSF Upgrade Project Overview Resources Plans and Timetable
Progress on EXPreS at JBO Ralph Spencer
Electronics for Physicists
05/08/09.
Presentation transcript:

05/08/09

FPGA Spectrometer for the GBT 05/08/09 FPGA Spectrometer for the GBT NRAO and U.C. Berkeley Joint Conceptual Design Review January 31, 2011

Introduction Table of contents Overall project plan - Bloss 05/08/09 Introduction Table of contents Overall project plan - Bloss Spectrometer specification and overall design – Ford & Roshi ADC characterization - Bussa Analog and clock distribution detailed design - Watts 1 PPS and Switching signal synch and distribution plan - McCullough Firmware design and development strategies - Wertheimer Software design and development plan – Shelton Project risks and mitigation strategies – Ford 3

Participants - Jay Lockman, Chair Reviewers: • Karen O’Neil • Scott Ransom • Richard Prestage • Tony Remijan • Toney Minter • Dave Frayer • Ron Maddalena • Glen Langston • Rick Fisher • Rich Lacasse • Matt Morgan • Roger Norrod • Steve White • Chris Clark Project Team: • John Ford • Amy Shelton • Anish Roshi • Dan Werthimer Terry Filiba Mark Wagner • Galen Watts • Patrick Brandt • Mark Whitehead • Randy McCullough • Jason Ray • Joe Masters • Bob Garwood • Srikanth Bussa

Charge to Participants The purpose of the Preliminary Design Review for the Green Bank Spectrometer is to validate that the designs and plans presented, to the extent they can be evaluated at this point in the project, meet the guidelines for the new spectrometer by: 1. Satisfying the science case 2. Addressing all of the specifications 3. Meeting the requirements of the ATI grant description 4. Appearing to be technically and financially viable 5. Being able to be completed in accordance with the grant and project schedules 6. Identifying the risks of the project, their potential effect, and demonstrating a satisfactory mitigation plan for each risk

ATI Grant Award Details Science case – Upcoming in next presentations Schedule 36 months September 1, 2010 – August 31, 2013 Total Budget - $ 1.27MM ($1.1MM Grant + $170K NRAO Cost Share) Hardware Staffing – Who does what? Science case and system specifications – NRAO & Berkeley System design and programming – Berkeley Integration into GB systems – NRAO

05/08/09 Equipment Budget: $435,441 we don't need that many roaches and iadcs (those numbers are from the original proposal). we need about 10 roach boards and 20 adcs.

Staffing (ATI Proposal) Staff Contributions: NRAO – 1.96 FTEs Berkeley – 1.41 FTEs

Operational Staffing Staff Contributions: NRAO – 3.15 FTEs 05/08/09 Operational Staffing Mark Wagner, berkeley project manager, fpga designer staff scientist Terry Filiba, data transport: FPGA --> CPU --> GPU EE PhD student Suraj Gowda, boosting FFT/FPGA clock speeds using auto-placement EE PhD student Glenn Jones, digital downconverter design jansky postdoctoral fellow (caltech) Guifre Molera, SPEED 10Gbit ethernet protocol, GUPPI mods EE PhD student Gregory Desvignes, Guppi Code Astr PostDoc Simon Scott, systems integration, will joining the group march 26, Hong Chen, grad student, fft optimizations (bit growth, unscramber) Billy Mallard, undergrad EE student, DSP library optimizations (DSP48, etc) staff scientist Dan Werthimer, PI Staff Contributions: NRAO – 3.15 FTEs Berkeley – 2.50 FTEs

Schedule Award Schedule: Schedule flow chart Project chart view