MKI Operational Experience and Future Plans

Slides:



Advertisements
Similar presentations
Proton / Muon Bunch Numbers, Repetition Rate, RF and Kicker Systems and Inductive Wall Fields for the Rings of a Neutrino Factory G H Rees, RAL.
Advertisements

Preliminary results and ideas for the SPS upgrade MDs on LHC beams in 2011 G. Rumolo on behalf of all the MD team (Elena, Thomas, Karel, Christina, Holger,
Injection Considerations for Scrubbing Run C. BRACCO, M.J. BARNES, W. BARTMANN, B. GODDARD, M. MEDDAHI, J. UYTHOVEN ACKNOWLEDGMENTS: M. DI CASTRO, M.DONZE,
Experience of High Voltage Conditioning of Kicker Magnets M.J. Barnes Acknowledgements: G. Bellotto, P. Burkel, H. Day, L. Ducimetière, T. Kramer, V. Gomes.
E-CLOUD VACUUM OBSERVATIONS AND FORECAST IN THE LHC Vacuum Surfaces Coatings Group 03/07/2011 G. Bregliozzi On behalf of VSC Group with the contributions.
MKI Magnet Design, PT100 Sensor Locations & Heating Observations in 2011 M.J. Barnes Acknowledgements: H. Day, L. Ducimetiere, N. Garrel 23 November 20111M.J.
Vacuum system in the main Linacs C. Garion CERN/TE/VSC CLIC09 workshop, October.
Update on MKI Performance: TS3 to 02/10/2012 M.J. Barnes Acknowledgements: P. Adraktas, V. Baglin, A. Bertarelli, G. Bregliozzi, S. Calatroni, F. Caspers,
SPS scrubbing experience: electron cloud observables L. Mether on behalf of the LIU-SPS e-cloud team LIU SPS scrubbing review, September 8, 2015.
NEW COMMENTS TO ILC BEAM ENERGY MEASUREMENTS BASED ON SYNCHROTRON RADIATION FROM MAGNETIC SPECTROMETER E.Syresin, B. Zalikhanov-DLNP, JINR R. Makarov-MSU.
LHC Scrubbing Runs Overview H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, M. Schenk, G. Arduini ABP information meeting 03/09/2015.
1 July 11, 2008Mike Barnes, AB/BT Present Status and Future Plans for the MKD Beam Dump Kickers Acknowledgements: input gratefully received from Fritz.
Beam induced heating assessment on LHC beam screens Arcs + DSs + ITs L. Tavian LBOC, 27 September 2011.
INVESTIGATING THE FEASIBILITY OF A TRAVELLING-WAVE CHOPPER FOR THE CLEAN SEPARATION OF 10 MHZ BUNCHES - AT HIE-ISOLDE Abhisek Mukhopadhyay.
LHC 23 June :07: Started injection cleaning with B1. 08:13: Fault on MKI B2. –MKI Beam 2 in P8 had a breakdown at 07:49 during the SoftStart process.
MKI Erratics: Hardware and Electronics Related Aspects M.J. Barnes Acknowledgements: A.Antoine, R.A. Barlow, P. Burkel, E. Carlier, N. Magnin, V. Mertens.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
Sergio Calatroni, Fritz Caspers, Hugo Day,
LIU-SPS ZS Electrostatic Septum Upgrade Review held on M.J. Barnes & T. Kramer.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Discussion and preliminary conclusions LIU-SPS ZS Electrostatic Septum Upgrade Review M.J. Barnes.
Scrubbing Run: TDI, MKI and MKE interlocks Chiara Bracco, Jan Uythoven ABT/BTP Acknowledgments: T. Baer, M. Barnes, E. Carlier.
CERN, LIU-SPS ZS Review, 20/02/ Brief review on electron cloud simulations for the SPS electrostatic septum (ZS) G. Rumolo and G. Iadarola in LIU-SPS.
Ferrite Heating: Measurements in Clean Room PT100 on ground plate of magnet PT100 on ferrite of “tube” Ceramic tube PT100 setup for installed MKI’s Note:
SKEKB Mini Work SKEKB Vacuum System – Arc Section – Contents Y.Suetsugu KEKB Vacuum Group 1.Beam Chambers 2.Pumps: Pump, Pressure,
Heat load analysis for Inner Triplet and Stand Alone Modules H. Bartosik, J. Hulsmann, G. Iadarola and G. Rumolo LBOC meeting 28 October 2014 Based on.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
CLIC workshop 2015 EXTRACTION KICKER STRIPLINE MEASUREMENTS C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral (CIEMAT), M.J. Barnes.
Feasibility of, and options for, the new MKE kicker concept M.J. Barnes, T. Kramer Acknowledgements: L. Ducimetière, B. Goddard, B. Salvant, J. Uythoven,
Chamonix 2006, B.Dehning 1 Commissioning of Beam Loss Monitors B. Dehning CERN AB/BDI.
Prepared by M. Jimenez AT Dept / Vacuum Group, ECloud’04 ELECTRON CLOUDS AND VACUUM EFFECTS IN THE SPS Experimental Program for 2004 J.M. Jimenez Thanks.
The way to fast and "loss-free" SPS kickers E. Gaxiola With contributions from AB-BT-KSL section and F. Caspers, T. Kroyer, M. Timmins, J. Uythoven.
1)For existing systems, where the ferrite yoke needs to be shielded from the circulating beam, it is not generally possible to include ceramic tubes to.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
4/11/2014 LIU-SPS ABT review1 M.J. Barnes, L. Ducimetiere, T. Kramer, W. Weterings Acknowledgements: E. Carlier, G. Rumolo, B. Salvant, C. Zannini.
DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.
LER workshop 2014 Update on the Extraction Kicker for CLIC DRs: Calibration Tests C. Belver-Aguilar (IFIC) On behalf of: A. Faus-Golfe (IFIC), F. Toral.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Superconducting Accelerating Cryo-Module Tests at DESY TESLA Technology Collaboration (TTC) Meeting, February 28 - March , Milano, Italy Denis Kostin,
Heating and Outgassing from MKP- L Magnet M.J. Barnes & L. Sermeus Acknowledgements: M. Beck, H. Bartosik, G. Bregliozzi, C. Pasquino, G. Rumolo, L. Vega.
MKI Performance During 2016 and Plans for EYETS
Present Status and Future Plans for the MKE Kicker Magnets
MD Planning Fri – Sat (26. – 27.8.)
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Options and Recommendations for TL and Dumps
Machine Coordinators: G. Arduini, J. Wenninger
The LHC - Status Is COLD Is almost fully commissioned
Electron cloud & vacuum pressure observations: 2011 proton run
Capacitive pick-up on MKP: why, when, who, resources, others
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Update on MKP Strategy ACKNOWLEDGEMENTS M.J. Barnes
Recent Electron Cloud Studies at CESR and Future Plans
FCC-hh injection group 7
Also on behalf of V. Senaj & L. Ducimetière
Summary of Week 13 G. Arduini, B. Holzer
Summary of Week 16 G. Arduini, J. Wenninger
Scrubbing progress - 10/12/2012
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Review of ferrites used at CERN to damp HOMs: TE/ABT equipment
Sunday/Monday & :30 Stable beams. Fill #1851.
Monday 24 October hours of 25ns MD
Summary first Scrubbing test 31/10/2010
Scrubbing progress - 08/12/2012
Fri :52 Stable beams fill #2536
Thursday - setup 10:00 Starting pre-cycle. 11:30 Injection.
Acknowledgements: Alain Antoine, Nicolas Magnin & Volker Mertens
Thursday Morning/Afternoon
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Cryogenic management of the LHC Run 2 dynamic heat loads
Presentation transcript:

MKI Operational Experience and Future Plans M.J. Barnes Acknowledgements: L. Ducimetiere, N. Garrel, B. Goddard, J. Uythoven, …. LIBD: May 17, 2011 M.J. Barnes

Overview of injection region (IR8) MSI TDI 4 MKI magnets Ecloud solenoids 4 transmission-line kicker magnets per injection system Total of 0.85 mrad (Vertical) 2.65 m length per magnet 0.9/3.0 µs rise/fall time Ceramic vacuum chamber with conducting stripes – various generations of shielding presently installed. Ferrite Ceramic Capacitor And ferrite ? LIBD: May 17, 2011 M.J. Barnes

MKI’s: Strong Sparks (Electrical Breakdown) During Pulsing of Kicker System July 12, 2010: MKI8 magnet D, strong spark during SoftStart @ 53.3kV and 6µs; July 14, 2010: MKI8 magnet D, strong spark during SoftStart @ 53.3kV and 2µs. August 21, 2010: MKI2 magnet B, strong spark during injection (TMR current pulse ~1/2 duration); September 27, 2010: MKI2 magnet B, strong spark during injection (TMR current pulse ~1/2 duration); October 16, 2010: MKI8 magnet D, strong spark during injection; October 27, 2010 @17:56: MKI2 magnet B, strong spark during injection; April 18, 2011 @ 00:06: MKI8 magnet D, strong spark during injection (double current in MS). Note: Sublimation of magnet D (MKI8) during technical stop – 20th October 2010 NOTES: POINT 2 (Clockwise Inj.) 49.6kV (7.8µs) nominal for injection, 52.6kV during SoftStart: MKI2 magnet B changed during Christmas Technical Stop 2010-2011. POINT 8 (Anti-Clockwise Inj.) 51.3kV (7.8µs) nominal for injection, 54.3kV during SoftStart. LIBD: May 17, 2011 M.J. Barnes

MKI8: MS, PFN D, Current From Christmas Technical Stop 2010-2011, we have the ability to log and view MS current with TIMBER. Electrical breakdown in MKI8-D on April 18, 2011 (double current in MS) LIBD: May 17, 2011 M.J. Barnes

E-cloud Solenoids Electron Cloud solenoids are presently installed close to Q4 & Q5 (slide 2). The solenoids have been turned-on as from 18 April 2011 @ 17:37hrs. However to date there has not been a “controlled” experiment to determine their effectiveness. Depending upon the sources of electron cloud (to be identified during 2011 operation), Ecloud solenoids may be required to be installed between MKI’s. LIBD: May 17, 2011 M.J. Barnes

Vacuum Activity During Scrubbing Number of bunches for circulating beam include: Sat Apr 9th (50ns): 07:00hrs 12 + 4x72 circulating 10:24hrs 588 for both B1 & B2. Sun Apr 10th (75ns): 11:44hrs 804 B1, 732 B2 17:27hrs 444 for both B1 & B2 17:46hrs 732 for both B1 & B2 18:05hrs 804 for both B1 & B2 23:51hrs 300 for both B1 & B2 Mon Apr 11th: 00:20hrs 804 B1, 732 B2 00:33hrs 804 for both B1 & B2 00:51hrs 876 for both B1 & B2 01:01hrs 948 for both B1 & B2 01:13hrs 1020 B1, 948 B2 01:19hrs 1020 for both B1 & B2 Jumps in vacuum pressure (magnet D) not yet understood. 50ns Note: Ecloud coils close to Q4 & Q5  0A (off before 18 April 2011) Notes: Pressure with 50ns spacing: ~1.3e-8mbar on magnet D, <8e13 beam intensity, 450GeV – see next slide for zoom. LIBD: May 17, 2011 M.J. Barnes

Vacuum Activity During Scrubbing - 50ns beam Note: Ecloud coils close to Q4 & Q5  5A Note: Ecloud coils close to Q4 & Q5  0A (off before 17:37hrs on 18 April 2011) Beam intensity < 8e13. 450GeV. Pressure rise in an MKI tank occurs during injection. LIBD: May 17, 2011 M.J. Barnes

Vacuum Activity During Normal Operation Note: Ecloud coils close to Q4 & Q5  5A (from 17:37hrs on 18 April 2011) From above: maximum pressure measured in an MKI tank is generally 1.5e-9mbar and occurs during injection. An exception is pressure in MKI8-C at ~05:10hrs on 02-05-2011 (~3e-9mbar) – see slides 10 & 11. LIBD: May 17, 2011 M.J. Barnes

Slide courtesy of Barbara & Slava BLM Layout at Points 8 & 2 P8 23469 MKI.D5R8.B2 MKI.C5R8.B2 BLMEI.05R8.B2E10_MKI.D5R8.B2 BLMEI.05R8.B2E20_MKI.C5R8.B2 D C B A P2 Injection Slide courtesy of Barbara & Slava P8: BLM name corrected as from TS of May 2011 LIBD: May 17, 2011 M.J. Barnes

Beam Losses at Injection: 02-05-2011 Bunch length MKI-C5R8 Energy MKI-D5R8 Intensity Note: Ecloud coils close to Q4 & Q5  5A (from 17:37hrs on 18 April 2011) During the above pressure (slow) rise there does not seem to be a correlation of vacuum with: beam loss, cryogenics temperature (see next slide) or bunch length. In above case, highest pressure was measured in interconnect between magnets C & D, suggesting the interconnect or the ceramic beam-pipe in C & D may be the origin of the rise. LIBD: May 17, 2011 M.J. Barnes

Beam Losses at Injection: 02-05-2011 D C B BEAM 2 During the above pressure (slow) rise the highest pressure is measured on the B2 Penning gauge, on the interconnect between magnets C & D, suggesting that the interconnect or the ceramic beam-pipe in magnets C & D may be the origin of the rise: little pressure rise is measured between magnet D and Q5. Hence, in this case, there is no correlation with the Q5 cryogenics. LIBD: May 17, 2011 M.J. Barnes

Beam Induced Heating of Ferrite Longitudinal Beam Coupling Impedances of several MKI’s have been measured, together with several different beam screen configurations. Power deposition is calculated from the real beam coupling impedance and the spectrum of the beam, assuming a cos2 bunch profile at top energy (7 TeV), which is a pessimistic assumption. Power deposition of 2400W/m if no screen installed !!; One installed MKI has 24 screen conductors (9 short), the others have 15 installed; 6 installed MKI’s have 2 damping resistors (in parallel with ferrite tube), the other 2 MKI’s (MKI8-C & MKI8-C) have only 1 damping resistor installed; Measurements exist for 5 of the 8 installed MKI’s; Calculated power depositions, for 5 of the 8 installed MKI’s, range from 60W/m (MKI2-A) to 97W/m (MKI2-B). LIBD: May 17, 2011 M.J. Barnes

Ferrite Heating: Measurements in Clean Room PT100 on ground plate of magnet PT100 on ferrite of “tube” Ceramic tube PT100 setup for installed MKI’s Magnet in vacuum tank; tank at atmospheric pressure; no bake-out jacket. Note: both PT100’s installed for measurement of magnet temperature, in clean room, gave same reading to within ± 4 ˚C. Conclusion: for measurements in clean room, Curie point of ferrite corresponded to 106 ˚C measured on ground plates (dissipation of 172W/m in “heater element”). SIS interlock presently 55 ˚C (see next slides). LIBD: May 17, 2011 M.J. Barnes

Temperature Rise During Scrubbing Number of bunches for circulating beam include: Sat Apr 9th (50ns): 07:00hrs 12 + 4x72 circulating 10:24hrs 588 for both B1 & B2. Sun Apr 10th (75ns): 11:44hrs 804 B1, 732 B2 17:27hrs 444 for both B1 & B2 17:46hrs 732 for both B1 & B2 18:05hrs 804 for both B1 & B2 23:51hrs 300 for both B1 & B2 Mon Apr 11th: 00:20hrs 804 B1, 732 B2 00:33hrs 804 for both B1 & B2 00:51hrs 876 for both B1 & B2 01:01hrs 948 for both B1 & B2 01:13hrs 1020 B1, 948 B2 01:19hrs 1020 for both B1 & B2 Temperature rises: Mag A Tube_up: dT = 19.0C Mag A Tube_dn: dT = 5.9C Mag B Tube_up: dT = 25.6C Mag B Tube_dn: dT = 10.3C Mag C Tube_up: dT = 27.4C Mag C Tube_dn: dT = 11.5C Mag D Tube_up: dT = 16.5C Mag D Tube_up: dT = 11.8C Mag A Ferrite_up: dT = 5.1C Mag A Ferrite_dn: dT = N/A Mag B Ferrite_up: dT = 5.8C Mag B Ferrite_dn: dT = 8.5C Mag C Ferrite_up: dT = 6.2C Mag C Ferrite_dn: dT = 6.2C Mag D Ferrite_up: dT = 5.8C Mag D Ferrite_dn: dT = 9.8C 31.2˚C (1020 bunches) 47.9˚C 32 20 15 50 ALL MKI’s during cooldown: Max Tau 15.5hrs Min Tau 7.5hrs Max-Min Tau 8.0hrs Mean Tau 11.7hrs SD Tau 2.3hrs ALL Tubes during cooldown: Max Tau 7.9hrs Min Tau 3.7hrs Max-Min Tau 4.2hrs Mean Tau 5.3hrs SD Tau 1.2hrs 50ns 50ns Notes: Magnet A, ferrite dn PT100 not working. Initial spread in temperatures ~2˚C Almost 5˚C range of dT for magnets (of 9.8 ˚C max.). 21.5˚C range of dT for tubes (of 27.4 ˚C max.) Conclusion: thermal contacts are difficult – and big variation in readings results: hence start with low SIS. LIBD: May 17, 2011 M.J. Barnes

Magnet Heating: Measurements during Operation 40 15 25 35 30 20 D5R8_dn: 38.2˚C (extrapolated max.  39.5˚C, τ=8hrs) D5R8_dn: 37.5˚C (extrapolated max.  42.8˚C, τ=8hrs) D5R8_dn: 37.5˚C B5R8_dn: 35˚C B5L2_up: 29.2C Wide range of magnet temperatures, and “up” & “down” can be quite different – poor thermal contact. Note: 38.2˚C (D5R8_dn) is the highest magnet temperature noted to date. LIBD: May 17, 2011 M.J. Barnes

Tube Heating: Measurements during Operation C5R8_up: 56.3˚C (extrapolated max.  59˚C, τ=2.5hrs) B5R8_up: 51.1C A5L2_up: 41.6C Wide range of magnet temperatures, and “up” & “down” can be quite different – poor thermal contact. Note: 56.3˚C (C5R8_dn) is the highest tube temperature noted to date. LIBD: May 17, 2011 M.J. Barnes

Magnet D5R8_dn & Tube C5R8_up Heating with Beam Intensity & Energy 37.5˚C Steady-State (Mag. D5R8_Dn) [5.8e13 charges] 9.7e13 charges 50.4˚C high (Tube C5R8_up) [5.8e13 charges] Mag. D5R8_dn (3.5 TeV)  ~15˚C rise, above 22 ˚C, with 5.8e13 charges & ~20˚C rise (extrapolated) with 9.7e13 charges. Tube C5R8_up (3.5 TeV)  ~28˚C rise, above 22 ˚C, with 5.8e13 charges & ~37˚C rise (extrapolated) with 9.7e13 charges. Note: following energy ramp, during energy flattop, bunch length increases – hence probably reason for tube “cooling”. LIBD: May 17, 2011 M.J. Barnes

May 13, 2011: Cryogenic Temperature and MKI vacuum MKI8-A pressure (2.1e-9 mbar max) Magnet A-B interconnect Q5 side of MKI8 magnet D Q4 Screen output temp. Q4 Screen input temp. A B C D Injected Beam Cryo problem at point 8: pressure increase to 2.1e-9mbar in MKI8’s. Q4 beam screen temp. is approx the average of the screen input and output temperatures. LIBD: May 17, 2011 M.J. Barnes

Sublimation: MKI8, May 2011 Cryo problem Sublimation D C B A (Thurs 12/05/2011) D C B A Cause ?: present near MKI’s too Sublimation on magnets C & D carried out 19 April 2011, following spark. Sublimation on all 4 MKI’s, at both points, carried out during TS of early May 2011. LIBD: May 17, 2011 M.J. Barnes

Summary of Experience with MKI’s Considerable vacuum activity around MKI’s during beam scrubbing – mainly from Q5 area. Ecloud solenoids close to MKIs now turned on (5A): but their effectiveness is now yet assessed; Total of 2 electrical breakdowns on MKI8-D (during SoftStarts) and total of 2 during injections (latest April 18, 2011); Total of 3 electrical breakdowns on MKI2-B (during injections) – hence magnet changed during Christmas stop; Pressure rise in MKI’s is normally during injection. During the slow pressure rise on 2 May 2011, there does not seem to be a correlation of vacuum pressure increase with: beam loss, cryogenics temperature or bunch length. However the cryogenics can have a big effect on the MKI pressure, Measurements in the clean room, on a single MKI, showed reduced inductance at 106˚C measured on magnet ground plate (with PT100); but there is a LARGE spread in temperature rises during operations (~2:1). 38.2˚C (D5R8_dn) is the highest magnet temperature noted to date in tunnel. SIS interlock, of magnet temperature, set to 55˚C. Mean cool-down time-constants: magnet  11.7 hrs, σ=2.3hrs; tube  5.3 hours, σ=1.2hrs. Adequate time required for cool-down between before next coast! Sublimation is effective at reducing MKI pressure; ACOND/SOFTSTART: strong spark threshold now 1.2e-9mbar (originally 4e-9 mbar); weak spark threshold now 8e-10mbar (originally 1e-9mbar); Vacuum interlock level: 2e-8 mbar (from late March 2011; before late March was 5e-8 mbar). LIBD: May 17, 2011 M.J. Barnes

Future Plans Closely monitor vacuum activity around MKI’s and identify causes; Assess effectiveness of Ecloud solenoids close to MKI’s; Determine whether Ecloud solenoids need to be installed between MKI’s; Closely monitor MKI temperature and “performance” (e.g. deflection of beam and electrical performance of system [e.g. rise time of TMR current, delay of TMR current, transient increase of MS current]; Run PSpice models of MKI system with reduced magnet inductance and determine electrical parameters that could be used for IPOC interlock; Thermally model MKI magnet and predict ferrite temperature (as per MKE’s) – but no one foreseen for this activity….; Determine good setting for SIS interlock for magnet temperature. Study effect of BIRF ferrite heating to Curie temperature: do losses in magnet ferrite increase? (possibly make more measurements). MDs to determine ferrite temperature rises for various intensities and energies?? Sublimation may be used on a reasonably regular basis – procedure to be formulated. LIBD: May 17, 2011 M.J. Barnes